• Title/Summary/Keyword: Point-open topology

Search Result 16, Processing Time 0.03 seconds

METRIZABILITY AND SUBMETRIZABILITY FOR POINT-OPEN, OPEN-POINT AND BI-POINT-OPEN TOPOLOGIES ON C(X, Y)

  • Barkha, Barkha;Prasannan, Azhuthil Raghavan
    • Communications of the Korean Mathematical Society
    • /
    • v.37 no.3
    • /
    • pp.905-913
    • /
    • 2022
  • We characterize metrizability and submetrizability for point-open, open-point and bi-point-open topologies on C(X, Y), where C(X, Y) denotes the set of all continuous functions from space X to Y ; X is a completely regular space and Y is a locally convex space.

Tolerance Control for the Inner Open-Switch Faults of a T-Type Three-Level Rectifier

  • Lee, June-Seok;Lee, Kyo-Beum
    • Journal of Power Electronics
    • /
    • v.14 no.6
    • /
    • pp.1157-1165
    • /
    • 2014
  • The T-type topology is a three-level topology that has an advantage in terms of its number of switching device and its efficiency when compared to the neutral-point clamped (NPC)-type topology. With the recent increase in the usage of the T-type topology, the interest in its reliability has also increased. Therefore, a tolerance control for a T-type rectifier is necessary to improve the reliability of applications when an open-switch fault occurs. NPC-type rectifiers cannot eliminate input current distortion completely. However, the T-type rectifier is able to restore distorted current. In this paper, a tolerance control for the $S_{x2}$ and $S_{x3}$ open-switch faults of a T-type rectifier is proposed where it is advantageous in terms of efficiency when compared with other tolerance controls. The performance of the proposed tolerance control is verified through simulation and experimental results.

A Study on Circuit Topology for the Electrical Power Failure and Open-Phase Fault Detection of Industrial Field (산업현장 정전 및 결상사고 감지회로 토폴로지 연구)

  • Park, Dong-Hun;Kwak, Dong-Kurl;Jeon, Hoe-Joong;Jeon, Ho-Jin
    • Proceedings of the KIPE Conference
    • /
    • 2019.07a
    • /
    • pp.540-542
    • /
    • 2019
  • This paper proposes an open-phase fault control system using 3-phase neutral voltage. The proposed control system is designed as a new topology which uses the potential difference between neutral point and ground of three phase. The open-phase detection system is also configured to Y-wiring of three capacitance devices of the same capacity to each line of three phase power source R-S-T. This paper also designs a mobile phone application for remote alarm of open-phase fault.

  • PDF

TOPOLOGICAL CHARACTERIZATIONS OF CERTAIN LIMIT POINTS FOR MOBIUS GROUPS

  • Hong, Sung-Bok;Kim, Han-Doo
    • Bulletin of the Korean Mathematical Society
    • /
    • v.38 no.4
    • /
    • pp.635-641
    • /
    • 2001
  • A limit point p of a Mobius group acting on$ B^m$ is called a concentration point if for every sufficiently small connected open neighborhood of p, the set of translates contains a local basis for the topology of p. For the case of two generator Schottky groups acting on $B^2$, we give characterizations for several different kinds of limit points.

  • PDF

A topology optimization method of multiple load cases and constraints based on element independent nodal density

  • Yi, Jijun;Rong, Jianhua;Zeng, Tao;Huang, X.
    • Structural Engineering and Mechanics
    • /
    • v.45 no.6
    • /
    • pp.759-777
    • /
    • 2013
  • In this paper, a topology optimization method based on the element independent nodal density (EIND) is developed for continuum solids with multiple load cases and multiple constraints. The optimization problem is formulated ad minimizing the volume subject to displacement constraints. Nodal densities of the finite element mesh are used a the design variable. The nodal densities are interpolated into any point in the design domain by the Shepard interpolation scheme and the Heaviside function. Without using additional constraints (such ad the filtering technique), mesh-independent, checkerboard-free, distinct optimal topology can be obtained. Adopting the rational approximation for material properties (RAMP), the topology optimization procedure is implemented using a solid isotropic material with penalization (SIMP) method and a dual programming optimization algorithm. The computational efficiency is greatly improved by multithread parallel computing with OpenMP to run parallel programs for the shared-memory model of parallel computation. Finally, several examples are presented to demonstrate the effectiveness of the developed techniques.

Fault Tolerant System for Open Switch Fault of BLDC Motor Drive (BLDC 전동기 드라이브의 개방된 스위치 고장에 대한 고장 허용 시스템)

  • Park, Byoung-Gun;Kim, Tae-Sung;Ryu, Ji-Su;Lee, Byoung-Kuk;Hyun, Dong-Seok
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.11 no.2
    • /
    • pp.164-171
    • /
    • 2006
  • In this paper, the fault tolerant system for BLDC motor has been proposed to maintain control performance under an open switch fault of inverter. The fault identification is proposed to two methods, which are using the difference between reference and actual current, and adding voltage sensors across lower legs of inverter. The reconfiguration scheme is achieved by the four-switch topology connecting a faulty leg to the middle point of DC-link using bidirectional switches. The proposed fault tolerant system quickly recovers control performance by short fault detecting time and reconfiguration of system topology. Therefore, continuous free operation of the BLDC motor drive system after faults is available. The superior performance of the proposed fault tolerant system is proved by simulation.

A Study on Mobile Phone App. Design for Remote Alarm of Open-phase Fault (결상사고 원격 알람을 위한 모바일 폰 앱 개발에 관한 연구)

  • Jeong, Hoe-Joong;Kwak, Dong-Kurl;Lee, Hae-Keon;Song, Kang
    • Proceedings of the KIPE Conference
    • /
    • 2018.07a
    • /
    • pp.270-272
    • /
    • 2018
  • This paper proposes an open-phase fault control system using 3-phase neutral voltage. The proposed control system is designed as a new topology which uses the potential difference between neutral point and ground(G) of three phase. And the open-phase detection system is configured to three resistance devices(Y-wiring) of the same capacity to each line of three phase power source R,S,T. This paper also designs a mobile phone application for remote alarm of open-phase fault.

  • PDF

A Study on Remote Alarm System of Open-phase Faults based on IoT (IoT 기반의 결상사고 원격알람 시스템에 관한 연구)

  • Jeong, Hoe-Joong;Kwak, Dong-Kurl;Choi, Shin-Hyeong;Kim, Choon-Sam;Yang, Ki-Cheol
    • Proceedings of the KIPE Conference
    • /
    • 2018.11a
    • /
    • pp.4-6
    • /
    • 2018
  • This paper proposes an open-phase fault control system using 3-phase neutral voltage. The proposed control system is designed as a new topology which uses the potential difference between neutral point and ground(G) of three phase. And the open-phase detection system is configured to Y-wiring of three capacitance devices of the same capacity to each line of three phase power source R-S-T. This paper also designs a mobile phone application for remote alarm of open-phase fault.

  • PDF

A Study on Development of Open-Phase Protector Having Leakage Current Generation and Incapable Operation Prevention at Open-Phase Accident (결상 시 누전전류 발생과 오동작 방지 기능을 갖는 결상보호기 개발에 관한 연구)

  • Kwak, Dong-Kurl
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.1
    • /
    • pp.182-187
    • /
    • 2015
  • In the three-phase power system, when any one-phase or two-phases is open-phase, the unbalanced current flows and the single-phase power supplies to three-phase loads. Specially, motor coil and transformer coil receive over-current. As a result, great damage as well as electrical fire can occur to the power system. In order to improve these problems, this paper proposes that an open-phase detection device is designed by a new algorithm using electric potential difference between the resultant voltage of neutral point and ground, and a control circuit topology of open-phase protector is composed of highly efficient semiconductor devices. It improves response speed and reliability. The control algorithm circuit also operates the cut-off of a conventional residual current protective device (RCD) which flows an enforced leakage current to ground wire at open-phase accident. Furthermore, time delay circuit is added to prevent the incapable operation of open-phase protector about instantaneous open-phase not open-phase fault. The time delay circuit improves more reliability.

MINIMAL P-SPACES

  • Arya, S.P.;Bhamini, M.P.
    • Kyungpook Mathematical Journal
    • /
    • v.27 no.1
    • /
    • pp.27-33
    • /
    • 1987
  • Minimal s-Urysohn and minimal s-regular spaces are studied. An s-Urysohn (respectively, s-regular) space (X, $\mathfrak{T}$) is said to be minimal s-Urysohn (respectively, minimal s-regular) if for no topology $\mathfrak{T}^{\prime}$ on X which is strictly weaker than $\mathfrak{T}$, (X, $\mathfrak{T}^{\prime}$) is s-Urysohn (respectively s-regular). Several characterizations and other related properties of these classes of spaces have been obtained. The present paper is a study of minimal P-spaces where P refers to the property of being an s-Urysohn space or an s-regular space. A P-space (X, $\mathfrak{T}$) is said to be minimal P if for no topology $\mathfrak{T}^{\prime}$ on X such that $\mathfrak{T}^{\prime}$ is strictly weaker than $\mathfrak{T}$, (X, $\mathfrak{T}^{\prime}$) has the property P. A space X is said to be s-Urysohn [2] if for any two distinct points x and y of X there exist semi-open set U and V containing x and y respectively such that $clU{\bigcap}clV={\phi}$, where clU denotes the closure of U. A space X is said to be s-regular [6] if for any point x and a closed set F not containing x there exist disjoint semi-open sets U and V such that $x{\in}U$ and $F{\subseteq}V$. Throughout the paper the spaces are assumed to be Hausdorff.

  • PDF