• 제목/요약/키워드: Plant design

검색결과 3,854건 처리시간 0.032초

Optimal $H_{2}$ design of the one-degree-of-freedom decoupling controllers

  • Park, Ki-Heon
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2005년도 ICCAS
    • /
    • pp.2093-2098
    • /
    • 2005
  • In this paper, $H_{2}$ designs for the one-degree-of-freedom decoupling control systems are treated for the generalized plant. The optimal $H_{2}$ controller is obtained together with the ones that yield finite $H_{2}$ cost functions under compact assumptions. It is shown that the optimal closed transfer matrix is strictly proper under the reasonable order assumptions on the generalized plant.

  • PDF

내개 변수 섭동 구조를 갖는 플랜트의 강인 안정화 알고리즘 (Robust Stabilization Algorithms of Plants Subject to Structured Parameter Perturbations)

  • 황유섭;이상혁
    • 대한전기학회논문지
    • /
    • 제38권4호
    • /
    • pp.316-325
    • /
    • 1989
  • This paper is concerned with robust stabilization of single input or single output systems. Based on the region of non-destabilizing perturbations some approaches to design which allow the given of structured perturbation of plant parameters and their gradient optimization are given. These algorithms iteratively enlarge the stability hypershere in plant parameter space and can be used to design a controller to stabilize a plant subject to given ranges of parameter excursions.

  • PDF

STEP을 이용한 원자력플랜트 설계정보의 교환과 공유 (The exchange and sharing of design data for nuclear power plant application by using the STEP)

  • 박찬국;조광종;한순흥
    • 한국전자거래학회:학술대회논문집
    • /
    • 한국전자거래학회 2003년도 종합학술대회 논문집
    • /
    • pp.45-53
    • /
    • 2003
  • This paper addresses the issues related to the development of product model and applications fer nuclear power plants based on STEP and PLIB standards. The ISO standards which can be applied are; STEP(Standard for the Exchange of Product Model Data) AP(application protocol) 221/231, AP 230/225, AP 227, ISO 13584 PLIB, ISO 15926 RDL. The data models of the AP's and ISO 15926 RDL are reviewed and an application system is proposed to exchange and share the design data of the nuclear power plant.

  • PDF

광 디스크 드라이브의 트랙 추종 서보 시스템을 위한 반복 제어 (Repetitive Control for the Track-Following Servo System of an Optical Disk Drive)

  • 문정호;이문노;정명진
    • 제어로봇시스템학회논문지
    • /
    • 제5권1호
    • /
    • pp.39-46
    • /
    • 1999
  • Disturbances acting on the track-following servo system of an optical disk drive inherently contain significant periodic components that cause tracking errors of a periodic nature. Such disturbances can be effectively rejected by employing a repetitive controller, which must be implemented carefully in consideration of system stability. Plant uncertainty makes it difficult to design a repetitive controller that will improve tracking performance yet preserve system stability. In this paper, we examine the problem of designing a repetitive controller for an optical disk drive track-following servo system with uncertain plant coefficients. We propose a graphical design technique based on the frequency domain analysis of linear interval systems. This design method results in a repetitive controller that will maintain system stability against all admissible plant uncertainties. We show simulation and experimental results to verify the validity of the proposed design method.

  • PDF

300MW급 실증 가스화기의 최적 운전조건 및 성능 예측 (The Optimal Operation Condition and Estimation Performance for 300MW Demonstration Gasifier)

  • 유정석;구자형;백민수;이황직
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2008년도 춘계학술대회 논문집
    • /
    • pp.368-371
    • /
    • 2008
  • The optimal operation condition of gasifier is one of the most important parameters to increase efficiency and reliability in IGCC plant. Also the prediction of the syngas composition and quantity must be predicted to carry out process design of the gasification plant. However, the gasifier process licensor are protective with information on process design and optimal gasifier design conditions. So, the most of process studies in the engineering company for gasification plant have carried out to look for key parameters and optimal design conditions using several prediction methods. In this paper, we present the estimated preliminary optimal operation condition of the 300MW Demonstration Entrain Flow Gasifier using Aspen Plus. The gasifier operation temperature considering slag flow was predicted by FactSage software and Annen Model.

  • PDF

강인한 적분형 최적 모델 추종형 서보계의 구성에 관한 연구 (A design on robust integral-type optimal model following servo system)

  • 황창선;김정택;이양우;최일섭
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1992년도 한국자동제어학술회의논문집(국내학술편); KOEX, Seoul; 19-21 Oct. 1992
    • /
    • pp.1024-1027
    • /
    • 1992
  • This paper deals with design method of the model following servo system in which optimal regulator probelm is used to design the controllers that make the step/ramp response of the plant be keptclose to a specified ideal step/ramp response of the model. The characteristics of this system is robust in the presence of the specified disturbances or the partameter perturbations of the plant. Especially, by direct feedforward compensator from the reference input the steady state offset of plant output response is excluded and the transient response is improved. Examples are give and the results of the design of the model follwing servo systems are verified by the computer simulation.

  • PDF

Design of an integrated network management system for telecom subsystem in offshore plants

  • Kang, Nam-seon;Kim, Nam-hun;Lee, Seon-ho;Kim, Young-goon;Yoon, Hyeon-kyu
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제39권8호
    • /
    • pp.863-869
    • /
    • 2015
  • This study analyzed the offshore plant industry and related regulations such as ISO, IEC, and Norsok Standards to develop an integrated network management system (INMS) capable of both on-site and remote management and configuration of IP-based network equipment in offshore plants. The INMS was designed based on actual specifications and POS plans, and a plan of management was verified through an offshore plant engineering company. Various modules such as PAGA interface modules, CCTV, IP-PBX, and HF-radio communication modules were developed for system implementation. Protocol and data design and screen design were followed by framework development and introduction of the automatic satellite communication function.

발전소 설계 인력 수요의 통계적 분석 (Manpower Simulation for the Power Plant Design Engineering)

  • Byung Soo Moon;Poong Eil Juhn
    • Nuclear Engineering and Technology
    • /
    • 제14권1호
    • /
    • pp.1-9
    • /
    • 1982
  • 이 논문에서는 Sargent & Lundy 회사로부터 입수한 발전소 설계 인력 분포에 관한 49개 실적치 커브와 Bechtel사가 제안한 수 개의 모델 커브를 분석하였다. 이들 커브로 부티 발전소 설계에 소요되는 인력분포를 Gamma분포로 가정하고 그 확률함수를 하나의 모델커브로 선정하였다. 이 모델커브를 이용하여 정부의 장기 원자력 발전소 설계계획에 따른 인력 수요를 년도별로 산출하였다. 또한 감응도 분석의 하나로서 엔지니어들의 숙련도에 따른 설계 인력 수요의 변화를 분석하였다.

  • PDF

화력발전시스템 Heat and Mass Balance 최적설계 자동화기법 (Automation of Heat & Mass Balance Design Optimization Method for Power Plant)

  • 백세현;장지훈;김영주
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제5권3호
    • /
    • pp.181-188
    • /
    • 2019
  • 본 연구에서는 발전시스템의 설계 입출력변수들을 Heat & Mass balance 계산 solver 및 최적화 알고리즘과 연계하고 반복계산 과정을 자동화함으로써 기술 및 경제적 측면을 고려한 최적의 발전시스템 Heat & Mass balance 설계를 도출하는 최적설계 자동화 기법을 개발하였다. 그리고 이에 대한 효과를 분석하기 위하여 발전소 형식별 10종에 대하여 최적설계 기법을 적용한 결과, NPV 및 IRR에 대한 개선 효과를 기대할 수 있었다.

Methods of Reviewing Constructability of Nuclear Power Plants Utilizing a Data-based Technology

  • Kim, Woo Joong;Lim, Byung Ki;Byon, SuJin
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.147-149
    • /
    • 2015
  • A nuclear power plant construction project normally involves a large construction work of which the total project cost is over 5 trillion Won, Such a large-scale construction project has the risks of schedule delay and quality degradation due to increase in project cost, because designs are changed due to design errors. The reasons for design changes during installation are 1) insufficient engineering capability of the owner, 2) information discontinuance due to the multiple package method, and 3) inefficient constructability review processes. Accordingly, this study proposes, through problem analysis, a method of developing a constructability review system that utilizes constructability review processes and a data-based technology (3D modeling) that are optimized for nuclear power plant construction projects. It also presents a method of establishing a system for reviewing constructability in which constructability review processes and a Database (3D model, Schedule, Design change Items) are linked each other.

  • PDF