• Title/Summary/Keyword: Plant design

Search Result 3,854, Processing Time 0.037 seconds

Optimal $H_{2}$ design of the one-degree-of-freedom decoupling controllers

  • Park, Ki-Heon
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.2093-2098
    • /
    • 2005
  • In this paper, $H_{2}$ designs for the one-degree-of-freedom decoupling control systems are treated for the generalized plant. The optimal $H_{2}$ controller is obtained together with the ones that yield finite $H_{2}$ cost functions under compact assumptions. It is shown that the optimal closed transfer matrix is strictly proper under the reasonable order assumptions on the generalized plant.

  • PDF

Robust Stabilization Algorithms of Plants Subject to Structured Parameter Perturbations (내개 변수 섭동 구조를 갖는 플랜트의 강인 안정화 알고리즘)

  • 황유섭;이상혁
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.38 no.4
    • /
    • pp.316-325
    • /
    • 1989
  • This paper is concerned with robust stabilization of single input or single output systems. Based on the region of non-destabilizing perturbations some approaches to design which allow the given of structured perturbation of plant parameters and their gradient optimization are given. These algorithms iteratively enlarge the stability hypershere in plant parameter space and can be used to design a controller to stabilize a plant subject to given ranges of parameter excursions.

  • PDF

The exchange and sharing of design data for nuclear power plant application by using the STEP (STEP을 이용한 원자력플랜트 설계정보의 교환과 공유)

  • 박찬국;조광종;한순흥
    • Proceedings of the CALSEC Conference
    • /
    • 2003.09a
    • /
    • pp.45-53
    • /
    • 2003
  • This paper addresses the issues related to the development of product model and applications fer nuclear power plants based on STEP and PLIB standards. The ISO standards which can be applied are; STEP(Standard for the Exchange of Product Model Data) AP(application protocol) 221/231, AP 230/225, AP 227, ISO 13584 PLIB, ISO 15926 RDL. The data models of the AP's and ISO 15926 RDL are reviewed and an application system is proposed to exchange and share the design data of the nuclear power plant.

  • PDF

Repetitive Control for the Track-Following Servo System of an Optical Disk Drive (광 디스크 드라이브의 트랙 추종 서보 시스템을 위한 반복 제어)

  • 문정호;이문노;정명진
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.5 no.1
    • /
    • pp.39-46
    • /
    • 1999
  • Disturbances acting on the track-following servo system of an optical disk drive inherently contain significant periodic components that cause tracking errors of a periodic nature. Such disturbances can be effectively rejected by employing a repetitive controller, which must be implemented carefully in consideration of system stability. Plant uncertainty makes it difficult to design a repetitive controller that will improve tracking performance yet preserve system stability. In this paper, we examine the problem of designing a repetitive controller for an optical disk drive track-following servo system with uncertain plant coefficients. We propose a graphical design technique based on the frequency domain analysis of linear interval systems. This design method results in a repetitive controller that will maintain system stability against all admissible plant uncertainties. We show simulation and experimental results to verify the validity of the proposed design method.

  • PDF

The Optimal Operation Condition and Estimation Performance for 300MW Demonstration Gasifier (300MW급 실증 가스화기의 최적 운전조건 및 성능 예측)

  • Yoo, Jeong-Seok;Koo, Ja-Hyung;Paek, Min-Su;Lee, Hwang-Jik
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2008.05a
    • /
    • pp.368-371
    • /
    • 2008
  • The optimal operation condition of gasifier is one of the most important parameters to increase efficiency and reliability in IGCC plant. Also the prediction of the syngas composition and quantity must be predicted to carry out process design of the gasification plant. However, the gasifier process licensor are protective with information on process design and optimal gasifier design conditions. So, the most of process studies in the engineering company for gasification plant have carried out to look for key parameters and optimal design conditions using several prediction methods. In this paper, we present the estimated preliminary optimal operation condition of the 300MW Demonstration Entrain Flow Gasifier using Aspen Plus. The gasifier operation temperature considering slag flow was predicted by FactSage software and Annen Model.

  • PDF

A design on robust integral-type optimal model following servo system (강인한 적분형 최적 모델 추종형 서보계의 구성에 관한 연구)

  • 황창선;김정택;이양우;최일섭
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1992.10a
    • /
    • pp.1024-1027
    • /
    • 1992
  • This paper deals with design method of the model following servo system in which optimal regulator probelm is used to design the controllers that make the step/ramp response of the plant be keptclose to a specified ideal step/ramp response of the model. The characteristics of this system is robust in the presence of the specified disturbances or the partameter perturbations of the plant. Especially, by direct feedforward compensator from the reference input the steady state offset of plant output response is excluded and the transient response is improved. Examples are give and the results of the design of the model follwing servo systems are verified by the computer simulation.

  • PDF

Design of an integrated network management system for telecom subsystem in offshore plants

  • Kang, Nam-seon;Kim, Nam-hun;Lee, Seon-ho;Kim, Young-goon;Yoon, Hyeon-kyu
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.39 no.8
    • /
    • pp.863-869
    • /
    • 2015
  • This study analyzed the offshore plant industry and related regulations such as ISO, IEC, and Norsok Standards to develop an integrated network management system (INMS) capable of both on-site and remote management and configuration of IP-based network equipment in offshore plants. The INMS was designed based on actual specifications and POS plans, and a plan of management was verified through an offshore plant engineering company. Various modules such as PAGA interface modules, CCTV, IP-PBX, and HF-radio communication modules were developed for system implementation. Protocol and data design and screen design were followed by framework development and introduction of the automatic satellite communication function.

Manpower Simulation for the Power Plant Design Engineering (발전소 설계 인력 수요의 통계적 분석)

  • Byung Soo Moon;Poong Eil Juhn
    • Nuclear Engineering and Technology
    • /
    • v.14 no.1
    • /
    • pp.1-9
    • /
    • 1982
  • Some observations from the examination of actual manhour curves for the power plant design engineering obtained from Sargent & Lundy Engineers and of a few of the model curves proposed by Bechtel, are analyzed in this paper. A model curve representing typical design engineering manhour has been determined as a probability density function for the Gamma Distribution. By means of this model curve, we strategically forecast the future engineering manpower requirements to meet the Government's long range nuclear power plan. As a sensitivity analysis, the directions for the localization of nuclear power plant design engineering, are studied in terms of the performance factor for the experienced versus inexperienced engineers.

  • PDF

Automation of Heat & Mass Balance Design Optimization Method for Power Plant (화력발전시스템 Heat and Mass Balance 최적설계 자동화기법)

  • Baek, SeHyun;Jang, jihoon;Kim, YoungJoo
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.5 no.3
    • /
    • pp.181-188
    • /
    • 2019
  • In this study, the Heat & Mass balance design optimization tool has developed by linking the design input/output variables with the Heat & Mass balance calculation solver and optimization algorithm and also automating the iterative calculation process. As a result of testing this optimization tool for 10 kinds of power plant, it was expected to improve the NPV and IRR compared with general design methods.

Methods of Reviewing Constructability of Nuclear Power Plants Utilizing a Data-based Technology

  • Kim, Woo Joong;Lim, Byung Ki;Byon, SuJin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.147-149
    • /
    • 2015
  • A nuclear power plant construction project normally involves a large construction work of which the total project cost is over 5 trillion Won, Such a large-scale construction project has the risks of schedule delay and quality degradation due to increase in project cost, because designs are changed due to design errors. The reasons for design changes during installation are 1) insufficient engineering capability of the owner, 2) information discontinuance due to the multiple package method, and 3) inefficient constructability review processes. Accordingly, this study proposes, through problem analysis, a method of developing a constructability review system that utilizes constructability review processes and a data-based technology (3D modeling) that are optimized for nuclear power plant construction projects. It also presents a method of establishing a system for reviewing constructability in which constructability review processes and a Database (3D model, Schedule, Design change Items) are linked each other.

  • PDF