• 제목/요약/키워드: Plant construction

검색결과 2,238건 처리시간 0.034초

LNG 하역 플랜트의 Off Shore 배관시공절차 확립에 관한 연구 (Establishment of Construction Procedure on the Off Shore Piping Work of a LNG Unloading Project)

  • 김용탄;문승재;유호선
    • 플랜트 저널
    • /
    • 제5권4호
    • /
    • pp.80-85
    • /
    • 2009
  • LNG stevedoring plant offshore pipelines requires human power and the longest construction period in constructing LNG storing terminal and influences on the success of the project absolutely. In this paper, the constructing procedures of LNG stevedoring plant offshore pipeline was established. Establishment of constructing procedures of LNG stevedoring plant offshore pipeline includes procurement of main equipments, iron frame and pipelines. To predict any expectable problems, that may occur by the stage of construction the application to the field works with a base of theoretical and practical contents for the constructing procedures of LNG stevedoring plant offshore pipelines can be established.

  • PDF

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

모듈러 플랜트의 업무특성을 고려한 위험 평가 및 예비비 예측 (Risk Assessment and Contingency Prediction considering Work Characteristics for Modular Plant Construction Projects)

  • 강현욱;김종욱;김용수
    • 한국건설관리학회논문집
    • /
    • 제19권5호
    • /
    • pp.81-89
    • /
    • 2018
  • 본 연구의 목적은 플랜트 건설사업에서 모듈러 공법의 적용이 확대됨에 따라 모듈러 플랜트에 대한 업무특성을 고려하여 위험을 평가하고 위험에 대응하기 위한 예비비를 예측하는 것이다. 연구방법은 모듈러 플랜트의 업무특성을 고려하여 위험의 영향을 평가하기 위한 모델(방법)과 예비비를 예측하기 위한 모델(방법)을 제시한다. 그리고 제시된 모델을 기반으로 모듈러 플랜트 건설사업 1곳을 사례로 선정하여 위험요인의 영향을 평가하고 예비비를 예측한다. 상기와 같은 목적과 방법에 따라 도출된 결과는 다음과 같다. 위험요인의 발생확률과 영향점수를 평가하여 중요 위험요인 15개를 선정하였다. 그리고 모듈러 플랜트의 특성을 고려하기 위하여 설계(E), 구매(P), 제작(F), 운송(T), 시공(C)단계로 업무를 분류하여 예측된 예비비는 기초사업비(610,503,596 천원) 대비 약 6.739%이며, 설계(E) 2.850%, 구매(P) 6.225%, 제작(F) 6.211%, 운송(T) 4.165%, 시공(C) 8.168%로 도출되었다. 본 모델은 위험관리를 위한 의사결정 과정에서 정량적인 결과를 도출하는 방법으로 활용된다.

플랜트 건설 리스크 분석 및 리스크 정량화 모델 개발에 관한 연구 (Risk Factors Analysis and Quantitative Risk Assessment Model for Plant Construction Project)

  • 안성진;김태희;남경용;김지명
    • 한국건축시공학회지
    • /
    • 제19권1호
    • /
    • pp.77-86
    • /
    • 2019
  • 플랜트 건설 프로젝트에 대한 수요가 증가하고 복잡해짐에 따라 예기치 못한 위험 요소가 증가하고 있다. 이에 플랜트 건설 프로젝트에 대한 중점 리스크 요인을 바탕으로 정량적 리스크 분석 및 평가 모델 개발이 요구되고 있다. 본 연구는 보험 회사에서 수집 한 보험금 지급 데이터를 사용하여 플랜트 건설 프로젝트의 실제 재정적 손실을 위험 평가 모델의 종속 변수로 반영하였으며 문헌 검토 및 데이터 분석을 바탕으로, 지형, 시운전, 공정률, 총 공시비 및 총 공사기간을 독립변수로 채택하였다. 제안된 손실율 모델은 플랜트 프로젝트 리스크 분석과 시공/시운전 단계의 리스크 분석가이드라인으로 활용될 수 있다.

사용자 요구기반 공장기숙사 리모델링 프로세스 개선 (Improving Remodeling Process of Plant Dormitory Based on User Demand)

  • 구교진;박상헌;박형진;김철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.321-322
    • /
    • 2012
  • Since 1980, rapid social and economic development due to increased plant construction has led to a plant dormitory in a short period. In recent years, by the advent of the durability of dormitory remodeling is a critical need. However, user requirements due to the lack of owner's budget do not reflected. As a result, users have complained about the scope of construction, and construction stakeholder in accordance with the budget efficiency of the complaints have decreased. In this study the remodeling requirements in the planning stages is proposed for the remodeling process. In addition work type and element can select a range of construction worksheet are proposal.

  • PDF

플랜트 EPC 기업의 해외 원자력 발전 프로젝트 진출방안 (Penetration of Korean EPC Companies into International Market for Nuclear Power Plant)

  • 조찬형;문승재;유호선
    • 플랜트 저널
    • /
    • 제5권3호
    • /
    • pp.66-73
    • /
    • 2009
  • This study aims to develop a strategy for South Korean companies to penetrate into the global NPP(nuclear power plant) market with their strength as the sixth biggest nuclear power generator in the world. With 20 nuclear plants in commercial operation and 6 more in construction, South Korea has the best technology in construction and operation of NPP. Despite these capabilities as demonstrated on its domestic market, Korean companies' constraint to enter and play a key role in global NPP market would be the lack of experience in overseas NPP projects, original technologies, and diplomatic effectiveness. This study analyzes the competitiveness of Korean standardized nuclear power plant, construction management skills, construction technologies, manufacturing equipment and materials and operation skills. In this research the current status of existing NPP and the forecast of building NPP according to countries was analyzed in order to work out strategies with technology, cost-effectiveness, and diplomatic consideration.

  • PDF

Evaluation of Construction RCB Exterior Wall Formwork according to Placing Height on Nuclear Power Plant

  • Song, Hyo-Min;Sohn, Young-Jin;Shin, Yoonseok
    • 한국건축시공학회지
    • /
    • 제15권6호
    • /
    • pp.653-660
    • /
    • 2015
  • Technologies for reducing construction duration are key factors in nuclear power plant construction projects, as a reduction in construction duration at the construction phase leads to a reduction in construction cost and an increase in profits through the early operation of the nuclear power plant. To analyze the constructability of the height of single-layer placement of formwork for the Reactor Containment Building (RCB) exterior wall through lateral pressure according to the height of concrete placement, the deformation criteria for formwork, and a new form design, 'MIDAS GEN (hereinafter referred to as MIDAS)' is used in this study. The cost and workload of formwork are derived according to the unit of height of the RCB exterior wall. Based on the result, it was found that the higher the RCB exterior wall, the higher the material cost, and the less the construction duration and the less the total number of formwork layers. Based on this result, it is believed that the material cost and the construction duration can be appropriately determined according to the formwork height.

해외 플랜트 건설사업관리 업무기능별 역량분석 (Evaluation of CM Capability based on Business Functions for International Plant Construction)

  • 하지원;정영수
    • 한국건설관리학회논문집
    • /
    • 제15권6호
    • /
    • pp.3-15
    • /
    • 2014
  • 국내 건설기업들의 해외 건설시장 진출이 중요한 쟁점이 되고 있는 현 시점에서, 타산업에 비해 경쟁강도가 낮으며, 높은 파급효과를 지닌 플랜트건설 수주확대를 위한 전략모색이 무엇보다 필요하다. 이에 본 연구에서는, 종합적인 측면에서의 표준화된 플랜트건설 사업관리 14가지 업무기능과 4가지 관리기법의 단계적 정의를 바탕으로 플랜트건설 전문가를 대상으로 선진국 대비 현재(2013년)와 미래(2018년)의 사업관리 업무기능별 역량수준을 조사 및 GAP분석을 실시하였다. 그 결과, 과거 실적을 바탕으로 노하우가 축적된 시공관리와 같은 하드웨어적인 역량은 선진국에 비하여 크게 뒤처지지 않으나, 경쟁강도가 상대적으로 낮고 부가가치가 높은 기획, 설계관리, 계약관리, 리스크관리와 같은 소프트웨어적인 측면의 역량은 뒤처진 것으로 나타났다. 또한 국가 산업적 차원에서 전문인력 및 원천기술 확보, 체계적인 관리 지원시스템 구축을 위한 연구개발의 확대가 필요한 것으로 분석되었다.

LNG 공사의 건설사업관리 의사결정지원모델 개발 - 시공단계 중심 - (Development of a Decision Making Model for Construction Management in LNG Plant Construction - Focused on Construction Stage -)

  • 박환표;한재구;진경호
    • 한국건설관리학회논문집
    • /
    • 제15권3호
    • /
    • pp.47-57
    • /
    • 2014
  • LNG 플랜트사업은 그 특성상 해외에서 사업을 추진하기 때문에 사업관리도 일반적인 사업관리방식과는 차이점이 있다. LNG 플랜트 사업 프로세스는 가스탐사 및 생산, 물리적인 액화 및 화학적인 전환공정, 수송, 저장 등의 가치사슬로 구성되며, 주로 천연가스를 액체원료나 연료로 전환하는 장치를 중심으로 액화공정(초저온 액화) 및 FEED 패키지, 제어 운영, 건설수행 등 EPC 기술을 대상으로 하고 있다. 이러한 해외에서 수행되고 복잡한 LNG 플랜트공사의 성공은 사업관리 의사결정에 따른 사업의 성패가 달라질 수 있다. 따라서 본 연구는 LNG 플랜트공사의 시공단계 사업관리 의사결정지원 모델을 구축하기 위하여 EPC 단계별로 9개의 사업관리요소 항목을 도출하고, 각 항목별 중요도를 평가하였다. 중요도 평가결과, EPC 단계별로 사업관리와 리스크관리 항목이 공통적으로 중요한 것으로 도출되었다. 특히 본 연구는 사업관리 요소항목과 중요도 평가결과를 기반으로 LNG 플랜트공사의 시공단계의 의사결정지원모델을 개발하였다. 개발된 의사결정지원모델은 향후 시공단계의 사업관리 의사결정지원 시스템 구축의 기반이 될 것이다.

해외 발전플랜트 리스크 분류체계 및 관계형 데이터베이스 구축 방안 (Risk Classification and Relational Database Schema in Overseas Power Plant Construction)

  • 김민;정영수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.192-193
    • /
    • 2014
  • Due to the decreasing domestic construction market since 2007, Korean construction companies are expanding overseas market. As a result, the international market share by Korea has been continuously increased and achieved 65.2 billion dollars in 2013. Despite of such visible results, profitability concerns are constantly arising. It is pointed out that the low-priced bid competition between Korean construction companies and various unpredictable risks are the most crucial factors which aggravate the profitability in the overseas projects. From this point of view, predicting the risks in advance and controling them could be the most important tasks to improve the profitability. This research proposed 202 risk factors with a hierarchy and relational database schema for power plant construction, which is based on the 24 risk classifications in previous research (Kim & Jung 2013). Proposed risk classification and relational database schema could be utilized as the basic data in risk management system.

  • PDF