성과관리시스템(EVMS) 도입을 위한 원전 건설사업비 관리체계 세분화 방안에 관한 연구 (A Study on the Cost Hierarchical System of Nuclaer Power Plant Construction Project for Introcusting Earned Vaule Management System)

  • 이상현;김우중
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.230-231
    • /
    • 2019
  • The nuclear power plant construction project is large-scale, has various stakeholders and computer system, and is produced and managed a large amount of information. The domestic nuclear power plant construction project has accumulated data based on many years of experience in the system. It has the competitiveness to suggeest alternatives that meet the requirement of the client in the overseas nuclear power plant project. Earned value management, which integrates schedule and cost, is possible to risk management. It was developed the earned value management system considering the the actual data properties and types of the preceding nuclear power plant construction projects. It will be able to increase the nuclaer power plant export competieiveness. Therefore, it was palned to carry out future stuies so that it be able to complement the measure to integrate cost and schedule in consideration of actual data(quantity of activity, etc.).

  • PDF

A Brief Guide to Statistical Analysis and Presentation for the Plant Pathology Journal

  • Jeon, Junhyun
    • The Plant Pathology Journal
    • /
    • 제38권3호
    • /
    • pp.175-181
    • /
    • 2022
  • Statistical analysis of data is an integral part of research projects in all scientific disciplines including the plant pathology. Appropriate design, application and interpretation of statistical analysis are also, therefore, at the center of publishing and properly evaluating studies in plant pathology. A survey of research works published in the Plant Pathology Journal, however, cast doubt on high standard of statistical analysis required for scientific rigor and reproducibility in the journal. Here I first describe, based on the survey of published works, what mistakes are commonly made and what components are often lacking during statistical analysis and interpretation of its results. Next, I provide possible remedies and suggestions to help guide researchers in preparing manuscript and reviewers in evaluating manuscripts submitted to the Plant Pathology Journal. This is not aiming at delineating technical and practical details of particular statistical methods or approaches.

Challenges and Strategies for Commissioning of FLNG

  • Lee, Dong Hyun;Seo, Kwang Su;Yeo, Jong Su;Kim, Myung Ki
    • Journal of Advanced Research in Ocean Engineering
    • /
    • 제2권3호
    • /
    • pp.129-135
    • /
    • 2016
  • After the construction of offshore plants, the function and integrity of system in offshore plants should be commissioned. As the executor of many FLNG projects, Samsung Heavy Industries Co., Ltd has faced some challenges for commissioning which are not similar to those in other offshore project. This study shows the differences between the commissioning of typical offshore projects and the one of FLNG projects. By the characteristics of offshore, performing the commissioning activity of FLNG near shipyard as much as possible reduces the risk of malfunction. The possible solutions to achieve these strategies are introduced.

물량 산출 및 생산성 분석 기반의 거푸집공사 비용공정 통합 모델 (Integration Model of Cost and Schedule in Aluminum Form Work based on Quantity Take-offs and Daily Productivity Analysis)

  • 지성민;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.17-18
    • /
    • 2011
  • Over the past 20 years, Researchers have tried to develop "Integration Model of Cost and Schedule" in construction industry. They suggested various models and techniques, however, it is still required to develop new methodology for AL Form Work in Public Multi-Housing Projects. Accordingly, this research focused on measuring quantity take-offs of on-going projects and analysing the basic process of using the resources(Labor, Material, Plant) related to cost and time data. There are 3 steps of this research : 1) The literature review of previous studies about Integration Model of Cost and Schedule was conducted. 2) Model for integration between cost and schedule was developed. 3) the accuracy of developed model was verified. The results are expected to improve in integrated managing the cost and schedule data of AL form work.

  • PDF

TOC-CCPM과 EVM을 통합한 Synchro-EVM 시스템 개발 연구 (Development of Synchro-EVM System Integrating TOC-CPM and EVM)

  • 이도헌;장길상
    • 대한안전경영과학회지
    • /
    • 제19권4호
    • /
    • pp.291-299
    • /
    • 2017
  • Recently, many business and government organizations have benefitted by executing projects using TOC-CCPM(Theory of Constraints-Critical Chain Project Management). In parallel, Earned Value Management(EVM) metrics have also become popular. Many organizations like US government requires that all large projects measure and report project progress status using EVM. Thus, project management in business fields such as plant construction, IT development, ship building need to integrate TOC-CCPM and EVM in oder to keep and reduce the delivery date of projects for improvement of customer satisfaction and enlargement of business opportunity. This paper proposes the scheme and case of developing the Synchro-EVM system which TOC-CCPM and EVM are connected.

Development of Review Processes and Tools for Liquidated Damages for EPC/Turnkey Project: Contractor's Perspective

  • Hahn, Ki Jeong;Lee, Eul-Bum;Kim, Young Ho
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.718-719
    • /
    • 2015
  • As a recent global trend, the majority of plant projects are delivered through EPC or EPC-turnkey contracts, where a contractor's liability is more complicated because of the mega size scale and financing method. Previous researches have been lacking a practical usability for project members for liabilities of contracts. Those were focused on solving the claims or schedule calculation issues only. The objective of the present study was to develop a validation process for LDs (liquidated damages) in contractor's liabilities with various case studies and expert judgments. As summarized in this paper, the processes and tools were developed with project life cycle process. The project preparation phase includes 3 step check lists to determine the Go or No-go for projects. In progress phase, contractors should focus on the response strategies for claims with liabilities. The study concludes that those developed processes and tools will help to manage risk of LDs for the contractors in the overseas projects.

  • PDF

하천의 생태적 복원을 위한 식생학적 진단 - 남한강을 중심으로 - (Diagnosis of Vegetation for the Ecological Rehabilitation of Streams - The Case of the Namhan River -)

  • 명현;권상준;김창환
    • 한국조경학회지
    • /
    • 제30권5호
    • /
    • pp.98-106
    • /
    • 2002
  • This study was designed to present a river model with the aim of restoring the ecosystem and improving the landscape along the urban rivers on the basin of the Namhanl river, a core life channel for the National Capital regin. The revelation of botanical status, transition trend and correlation of plants might lead to providing the urban river restoration projects and ecological river formation projects with basic data for a model of ideal aquatic ecology and landscape. The outcomes of this study could be summed up as follows: 1. The plant communities of river flora found on the basin of the Namhan river could be categorized largely into 39 plant communities 2. Most diverse plants were distributed in the rivers lower reaches such as Unsim-ri where the protected zone of Paldang reservoir for city water borders the body of Jodae swamp where natural streams flow nearby. 3. One of the greatest threats to the biomass of the River Namhan is that the communities of such invasive alien plants as Panicum dichotomiflorum and Ambrosia artemisiifolia var. elatior dominate most parts of the area, a fact that has resulted in a reduced variety of plants and will, sooner or later, be likely to cause an ecological imbalance in the hitherto healthy Aquatic plant life. It is highly advisable to gradually diversify the species of trees and to return the plants bark to their original state since, besides the naturalized plants, plantations afforested with Erigeron canadensis and Erigeron annuus stocks in buckwheat field, Robinia Pseudo-accacia in riverside forest, Pinus rigida in terrestrial forest on the river basin and Larix leptolepis are anticipated to act as interceptors of normal migrations of the fluvial and terrestrial ecosystems. Finally, it seems also desirable to continue to explore the relationship between fluvial and terrestrial ecologies with the purpose of building up a model of natural streams in urban areas based on the surveyed factors for plant life, soil and landscape and, moreover, on the forecasting for overall influences derived from the rotation upon the ecosystem.

화력발전소 온배수열 활용 시설하우스 열공급에 대한 환경 및 사회적 가치 인식 비교 분석 (Evaluation on the Environmental and Social Value Awareness of the Heat Supply for the Horticultural Greenhouse using Thermal Effluents from Power Plant)

  • 김가희;안차수;엄병환
    • 한국농공학회논문집
    • /
    • 제60권5호
    • /
    • pp.125-134
    • /
    • 2018
  • Recently, interest in alternative energy has been increasing to reduce greenhouse gas emissions and fossil fuel consumption in accordance with the United Nations Framework Convention on Climate Change(UNFCCC). Accordingly, there is a need to use waste heat that unused throughout industrial systems for lowering the concentration of energy on fossil fuels. In particular, government support projects for the energy recycling of agriculture and fisheries such as cultivation of tropical crops and aquaculture are being actively carried out by utilizing waste heat and thermal effluents caused from large-scale industrial complexes including power plants. The study was conducted on supplier (power plant), consumer (farmer) and stakeholders (constructor and local governments) of domestic demonstration areas using waste heat that is abandoned from the power plant in the form of thermal effluents. It investigated the overall improvement and feasibility of government funded projects through field interviews and questionnaire-type surveys. The results of this study are expected to provide basic directions for the operation of the project in terms of nationwide expansion and diffusion of the heat source supply project at horticultural greenhouse by utilizing the thermal effluents from power plant.

Risk Ranking for Tunnelling Construction Projects in Malaysia

  • Ghazali, F.E. Mohamed;Wong, H.C.
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권1호
    • /
    • pp.29-36
    • /
    • 2014
  • Tunnelling has become a preferred method of construction for road and highway projects in countries with a lot of hilly slope geological conditions such as found in Malaysia. However the construction works of a tunnelling project are usually complicated and costly, which consequently impose great risks to the parties involved. This paper identifies the key significant risks and sub-risks for tunnelling construction projects in Malaysia through a case study. Interview has been used as the solitary means to determine the significant risks from contractor's eleven key project personnel who were directly involved in the tunnelling construction such as consultant, construction manager and tunnel engineers. The importance of the risks identified is then prioritised and ranked via the Analytic Hierarchy Process (AHP)'s pairwise comparison approach to determine their criticality towards a successful delivery of project. As a result, three key risks have been identified as significant for the tunnelling case study project, namely health and safety, cost overrun in construction and time overrun in construction. Two sub-risks each of the latter categories, which are cost underestimation and unforeseen events (cost overrun in construction) as well as plant and machinery failure and delay in material delivery (time overrun in construction), have occupied the top five overall risk ranking.

하수관거정비 BTL사업의 효과분석 및 방안 수립 연구 (Development of Evaluation Methodology on the Performance of BTL Sewer Rehabilitation Projects)

  • 송호면;조정일;안충희
    • 상하수도학회지
    • /
    • 제24권6호
    • /
    • pp.743-751
    • /
    • 2010
  • It requires an interim performance assessment for BTL business of the sewerage rehabilitation which continues from 2005 till now. Means, It is necessary to make an interim performance assessment and an analysis of an business effect of the sewerage rehabilitation BTL projects which still continues, and we presented an improvement method of the new sewerage rehabilitation project in future. This paper has conducted an analysis of the business effect for 3 local government BTL projects which are completed and under operation as of now in Jincheon-Gun, Cheongju-Si and Gangjin-Gun. As a method of business effect analysis, we conducted a business effect of the 3 places using the index set which we previously set for the business effect analysis. The index set in this research was sectionalized to an improvement effect of operating wastewater treatment plant, an benefit effect of the direct cost, an benefit effect of the indirect cost and an environment friendly effect. We, in this paper, conducted an business effect analysis for 3 sewerage rehabilitation BTL projects which are completed or under operation recently as a demonstration, however we judge that an business effect analysis shall be conducted in a stage that a significant time for operation has passed since the completion of the construction in order to induce an actual business effect of the sewerage rehabilitation BTL project.