• Title/Summary/Keyword: Plant Projects

Search Result 327, Processing Time 0.023 seconds

Analysis on Risk Factors of Reactor Containment Building Construction using Analytic Hierarchy Process (계층 분석 방법을 이용한 원자로 격납 건물 시공의 리스크 요인 분석)

  • Shin, Dae-Woong;Shin, Yoonseok;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.4
    • /
    • pp.425-431
    • /
    • 2015
  • Since the construction of Kori 1 was completed in 1978, the construction projects for nuclear power plant are increasingly expanded into domestic and foreign sites. However, some of construction sites of nuclear power plant have the problems of process delay and cost loss due to lack of ability of risk management. The construction of reactor containment building in nuclear power plant is especially dotted with many risk factors because it needs professional skills and large-scale resources due to long duration compared with different construction phase. Therefore, it needs the study that analyzes risk factors expected in construction of reactor containment building and suggests way of stable performance of projects. So, this study assesses risk factors of construction of reactor containment building. For the objectives, this study uses survey for group of minority specialists of 36 experts. The risks of 24 factors is classified by criterions of process, cost, safety, and quality and the results of assessment is analyzed by analytic hierarchy process. As the results, the importance and priority of risk factors classified by each criterion were calculated and the applicability of analytic hierarchy process was identified to analyze risk factors of nuclear power plant construction. These will be baseline data for risk management in construction phase of reactor containment building.

A Study on the Success Factors Related to the Performance of Power Plant Engineering Projects (발전플랜트 엔지니어링 프로젝트 성공요인 우선순위 도출 연구)

  • Suh, Jaeho;Lee, Dongmyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.2
    • /
    • pp.11-22
    • /
    • 2024
  • Power plant engineering industry obtains EPC plan project and delivers results about electricity, measurement, machinery, and piping and so on. Its works are taken by projects. Although power plant engineering composes 2~5% of whole EPC project cost, it's one of the fundamentals because it affects process after planning step a lot. However, domestic power plant engineering companies' project performance ability is insufficient and there's a need for systematic performance. Thus, this study defined related factors of successful performance and analyzed the priority among them through analytical hierarchy process. All respondents recognized experience, knowledge, and communication as important factors. Administrators considered knowledge, experience, and communication. But hands-on workers considered experience, knowledge, human resources. Those who have experience in oversea project considered process, experience, human resources. However those who don't have experience in oversea project considered knowledge, experience, and communication. Recognition of important factors varies by the position and work experience of members.

Evaluating and Suggesting Key Risk Factors according to Risk Hierarchy of Occurrence Field in the Overseas Development Projects (발생영역별 리스크 위계에 따른 투자개발형 해외건설사업의 핵심 리스크 인자 도출 및 평가)

  • Lee, Jeong-Seok;Ahn, Byung-Ju;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.70-79
    • /
    • 2012
  • The Korean Government recently has been focused on strengthening competitiveness of order and stimulating construction market in the international construction industry. It has planned to extend the ODPs (overseas development projects) in order to diversifying the international construction market of which is domestic construction companies, placing too much emphasis on plant projects of the Middle East. However, literature review of risk analysis in the ODPs shows that the number of case study is several. Therefore, Authors asserted the necessity of risk analysis in the ODPs. The purpose of this study is to suggest a methodology that find KRFs (key risk factors) in the ODPs and analyze them, using AHP and Fuzzy theory. As a result, the 37 KRFs are selected and explained characteristics of them. A future direction of this study is to suggest a risk management model in the ODPs and prove feasibility of it.

Improvements of the Bidding Process through Order Case Analysis of Specialty Construction (전문건설공사의 발주사례분석을 통한 입찰업무의 개선방안)

  • Kim, Daewon;Shin, Dae-Woong;Shin, Yoonseok;Kim, Gwang-Hee;Yoo, Sangrok;Park, Wonjun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.5
    • /
    • pp.507-514
    • /
    • 2015
  • In recent years, the number of construction projects carried out to repair and reinforce newly built structures and facilities has been on the rise compared to the number of new construction projects, accounting for more than 90 percents of all construction projects carried out by specialty construction companies. However, as some of the ordering parties fill out the required tasks incorrectly, the wrong information on construction bids is announced, and the specialty construction companies that hold a license and technology are unable to get the job at the right time. As such, it is critical to prevent unnecessary time and expense related to the correction of incorrect bid announcements by providing accurate information and definitions, because the tasks of each specialty construction work stipulated in the framework act of construction industry are vague. Therefore, the causes and problems were analyzed based on the correction cases of bid information, and a plan that can address the problem will be proposed. The result of this study can be utilized as fundamental data to achieve an institutional improvement in the bidding service for the specialty construction companies.

A Study on Environmental Impact Assessment Guidelines for Marine Environments in Construction Projects of Thermal Power Plant (화력발전소 건설사업의 해양환경 환경영향평가 가이드라인(안) 연구)

  • Maeng, Junho;Kim, Eunyoung;Kang, Taesoon;Son, Minho
    • Journal of Environmental Impact Assessment
    • /
    • v.26 no.1
    • /
    • pp.78-92
    • /
    • 2017
  • Environmental impact assessment(EIA) on the construction and operation of thermal power plant(TPP) is aimed at promoting sustainable coastal development by clearly identifying the marine physics and organisms effects of the project on the surrounding marine environment and minimizing its impact. The primary purpose of this study is to establish EIA guidelines for TPP in order to assess how TPP construction projects influence marine environment and to establish the mitigaion plans of environmental impacts. Through this study, scientific and efficient EIA guidelines for the marine environments were established by a specialist forum consisted of officials from the Ministry of Environment and the Ministry of Trade, Industry and Energy, personnel from five public corporations in charge of TPPs and marine environment experts. In the study, fifteen EIA reports (2009~2015) on TPPs submitted were analyzed to identify the shortcomings of current assessment items on marine environment and to collect a wide range of information including EIA report formulation regulations, domestic and overseas environmental survey guidelines and EIA review comments on TPPs. Based on the findings, a specialist forum put together EIA guidelines for TPP construction projects.

Improvement of the Code Classification Structure in Piping Material Management for Petrochemical Plant Projects (석유화학 플랜트의 효율적 배관자재 관리를 위한 코드분류체계 개선)

  • Lee, Jong-Pill;Moon, Yoon-Jae;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.11 no.1
    • /
    • pp.39-49
    • /
    • 2015
  • The objective of this study is to improve the classification structure of commodity code for piping material management which is considered as the fundamental of commodity code and piping material management system. It enhances the efficiency of piping material management directly or indirectly affecting the engineering, procurement and construction in a petrochemical plant projects. To establish an improved code classification structure, this study identifies the problems of former code classification structure in details, as well as the characteristics of other domestic and global EPC company's code classification structures and presents the improved direction considering the recently mega-sized and specialized projects. Accordingly, to efficiently enhance piping material management, the improved code classification structures have been derived from defining suitable code classification structure for specific piping component, adding more standard attribute, expanding the number of code digits and classifying code hierarchy. The results of applying the improved classification structure of commodity code to on-going project have led to reduce the rate of rework from 4.98% to 2.48% for developing purchase description and also have saved working time for executing piping design by 3D modeling from 6 months by two persons to 4 months by a person which is decreased 67% consequently. In addition, the structures of pyramid code management have resulted to accumulation and analysis of the various piping data for other disciplines such as procurement and estimation team which require commodity code information through the company's material control system.

  • PDF

EBS for BIM based maintenance management of Thermal Power Plant (BIM기반 화력발전시설 유지관리를 위한 EBS(Elements Breakdown Structure)개발)

  • Kim, Chang-Soo;Cha, Sang-Hoon;Ji, Soung-Min
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.81-82
    • /
    • 2015
  • BIM has been a reliable construction project management tool to handle various kinds of construction information generated in the facility life cycle. To take these advantages, researchers have been promoted numerous studies in a residential, a commercial, and an educational facilities with a large number of on-going projects. However, despite running as the role of essential energy supplier, power plant related BIM research is relatively insufficient than others. In particular, due to the extending of the facility service period and the requirement of the complicated construction project management for 'overhaul' and 'repowering' in the power plant maintenance phase, the needs for using BIM have been increased gradually. For using BIM based maintenance, it is needed to consider an information collecting methods and necessary to develop an appropriate breakdown structure to share information. Therefore, 'EBS' is produced by reviewing the previous research related to BIM and analyzing the repair activities in the maintenance phase. Proposed 'EBS' must be useful not only a judgment between capital expenditure versus revenue expenditure but also appropriate maintenance strategies development for property management.

  • PDF

Evaluation of Construction RCB Exterior Wall Formwork according to Placing Height on Nuclear Power Plant

  • Song, Hyo-Min;Sohn, Young-Jin;Shin, Yoonseok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.6
    • /
    • pp.653-660
    • /
    • 2015
  • Technologies for reducing construction duration are key factors in nuclear power plant construction projects, as a reduction in construction duration at the construction phase leads to a reduction in construction cost and an increase in profits through the early operation of the nuclear power plant. To analyze the constructability of the height of single-layer placement of formwork for the Reactor Containment Building (RCB) exterior wall through lateral pressure according to the height of concrete placement, the deformation criteria for formwork, and a new form design, 'MIDAS GEN (hereinafter referred to as MIDAS)' is used in this study. The cost and workload of formwork are derived according to the unit of height of the RCB exterior wall. Based on the result, it was found that the higher the RCB exterior wall, the higher the material cost, and the less the construction duration and the less the total number of formwork layers. Based on this result, it is believed that the material cost and the construction duration can be appropriately determined according to the formwork height.

한국의 IQUE 적용방향 제시 - 항공분야를 중심으로 -

  • Jang, Sang-Yong
    • Journal of Korean Society for Quality Management
    • /
    • v.21 no.2
    • /
    • pp.27-34
    • /
    • 1993
  • Quality Assurance Method of Defense Logistics Agency, U. S. A., was changed from Contract Quality Assurance Program to In-Plant Quality Evaluation in May, 1990. IQUE focuses on working with contractor in spirit of team work to measure and continuously improve processes and resulting product quality. The goals are to achieve customer satisfaction, improved product quality, and a reduction in the costs of items and ownership. It is suggested to adopt and apply the IQUE method to the effective accomplishment of Korean aircraft projects.

  • PDF

Waste Reduction Always Pays

  • Lee, B.M.
    • Applied Chemistry for Engineering
    • /
    • v.3 no.2
    • /
    • pp.194-200
    • /
    • 1992
  • Dow has made waste reduction a priority at its facilites around the world. In 1986, the company formalized its waste reduction under a program called WRAP-Waste Reduction Alwasy Pays. The objectives of WRAP are to seek out cost effective projects that reduce waste to the environment, measure and track performance, and recognize employee excellence. The successful examples of Dow's WRAP Program are introduced as follows : 1. By-Product Feedstock Optimization. 2. Plastics Reclamation. 3. Glucol II Plant Absorber Water Upgradele. 4. Loss Reduction Project.

  • PDF