Importance of pumped storage hydroelectric power plant in Turkey

  • Aras, Egemen
    • Advances in Energy Research
    • /
    • v.5 no.3
    • /
    • pp.239-254
    • /
    • 2017
  • The world began to search for new energy sources with increasing energy demand. Renewable energy sources are as hydropower important for alternative energy. Countries with high hydroelectric potentials continue to work to utilize hydroelectric power plants in the most efficient way. Pumped storage hydropower plants are an important investment to meet the growing energy needs at peak times and to store energy. Although it produces energy in many countries, pumped storage hydropower plants have not begun to be built in Turkey which has high hydroelectric potential. A new era will be opened for energy production in Turkey where a large number of pumped storage hydropower plants projects are in study phase with the construction of pumped storage hydropower plants and first nuclear power plant.

A Study on the Software Test Case Development using Systems Engineering Methodology (시스템엔지니어링 방법론을 적용한 소프트웨어 테스트 케이스 개발에 관한 연구)

  • Salim, Shelly;Shin, Junguk;Kim, Jinil
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.14 no.2
    • /
    • pp.83-88
    • /
    • 2018
  • Software has become an integral part of almost any system, triggered by the ever-growing demand for automation and artificial intelligent throughout engineering domains. The complexities of software-centric systems are also increasing, which make software test efforts become essential in software development projects. In this study, we applied systems engineering methodology in generating software test cases. We found out the similarities between requirements analysis and traceability concept of systems engineering and test specification contents of software test. In terms of acceptance test, software test cases could be considered as validation requirements. We also suggested a method to determine test order using a SysML modeling tool.

Methods of Reviewing Constructability of Nuclear Power Plants Utilizing a Data-based Technology

  • Kim, Woo Joong;Lim, Byung Ki;Byon, SuJin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.147-149
    • /
    • 2015
  • A nuclear power plant construction project normally involves a large construction work of which the total project cost is over 5 trillion Won, Such a large-scale construction project has the risks of schedule delay and quality degradation due to increase in project cost, because designs are changed due to design errors. The reasons for design changes during installation are 1) insufficient engineering capability of the owner, 2) information discontinuance due to the multiple package method, and 3) inefficient constructability review processes. Accordingly, this study proposes, through problem analysis, a method of developing a constructability review system that utilizes constructability review processes and a data-based technology (3D modeling) that are optimized for nuclear power plant construction projects. It also presents a method of establishing a system for reviewing constructability in which constructability review processes and a Database (3D model, Schedule, Design change Items) are linked each other.

  • PDF

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

RISK FRAMEWORK FOR NEXT GENERATION NUCLEAR POWER PLANT CONSTRUCTION

  • John Walewski ;Stuart Anderson;Jaeheum Yeon;Amy Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.451-458
    • /
    • 2013
  • This research documents the initial findings and recommendations for developing a risk management tool to assess and quantify the risks associated with the construction of the next generation of nuclear power plants. The proposed tool builds upon the Construction Industry Institute's International Project Risk Assessment (IPRA) Best Practice. This paper provides an overview of the investigation to assess the unique risk elements pertaining to nuclear power plant construction and documents the preliminary findings from historical project performance data to better understand the function and use of the IPRA's Relative Impact value.

  • PDF

Development of a Decision Making Model for Construction Management in LNG Plant Construction - Focused on Construction Stage - (LNG 공사의 건설사업관리 의사결정지원모델 개발 - 시공단계 중심 -)

  • Park, Hwan Pyo;Han, Jae Goo;Chin, Kyung Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.47-57
    • /
    • 2014
  • LNG plant projects tend to be implemented in overseas owing to its characteristics, so their project management scheme is somewhat different from those of general projects. Value chain in a LNG plant project includes exploration/production of gases, physical liquefaction/chemical conversion processes, transportation and storage. Key factors in the chain include liquefaction process (including ultra-low temperature liquefaction) to convert natural gas into liquid materials or fuel, and Front End Engineering Design (FEED) package, as well as Engineering, Procurement and Construction (EPC) technology comprising control, operation and construction. Success of a complex LNG plant project implemented in overseas depends on decision-making process in project management. Accordingly, to develop a decision-making model in of plant construction, the study extracted none factors in project management by EPC stage and assessed importance of each factor. The result showed that items in both project management and project risk management are important. Especially, the study developed a decision-making model in the construction stage of a LNG plant project based on the project management factors and importance assessment. The developed decision-making model would lay groundwork in building a decision-making system in construction stage of project management.

Problem Analysis and Improvement Strategy for Feasibility Analysis of Overseas Plant Construction Projects (해외 플랜트 건설사업의 타당성 분석 문제점 및 개선방안)

  • Lee, Won-Gyu;Park, Moon-Sun;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.3-14
    • /
    • 2010
  • This study investigated and analyzed feasibility analysis case studies, carried out by contractor of EPC LSTK projects in the planning stage to suggest the strategies to solve problems for project improvement. For this, five feasibility analysis case studies of gulf cooperation council (GCC) countries were reviewed and investigated. The results can be summarized as follows: 1) Those factors needed to be analyzed, including cost increase, project delay, quality decrease were insufficiently considered when assessing feasibility. 2) And improvement strategies for three problems mentioned above were suggested based on findings in feasibility analysis. 3) Lastly the process of the project feasibility analysis that can be applied to overseas plant construction project was suggested step by step.

A Study on Composition and Application of Risk Management Planning and Procedure for Successful Overseas Construction Projects - Based on the PRINCE2 Methodology in the UK - (성공적인 해외 건설 프로젝트 수행을 위한 리스크 관리 계획·절차 구축 및 활용 방안에 대한 연구 - 영국의 사업관리 기법인 PRINCE2를 기반으로 -)

  • Kang, Sinbong;Kim, Seungchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.48-55
    • /
    • 2016
  • Risk management is an important element for successful management of overseas construction projects. This study reports a case study in which we proposed a risk management planning and procedure for plant construction which can be applied throughout the project life cycle. We analyzed the risk management practices of Korean construction companies by applying the concept of the PRINCE2 method developed in the UK, and proposed a risk management planning and procedure with organizational structure and working process. The suggested risk management planning and procedure was applied to an overseas plant construction project, and produced good results. It is believed that the procedure suggested here can also be aplied to other companies to enhance the competency in the global construction market.

A Study for Selecting the Plant Project Risk Management Check List (플랜트 PRM (Project Risk Management) 체크리스트 항목 선정을 위한 연구)

  • Choi, Doo-hoi;Bang, Hong-soon;Lee, Tae-hyeong;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.54-64
    • /
    • 2018
  • Currently, as construction businesses develop and diversity, risk became one of the most crucial considerations. Risks are potential and difficult to predict by nature. Also, they are important as they influence delay in construction period and increase of project costs. In construction projects in South Korea and elsewhere, the importance of risk management widely recognized and relevant research is being conducted continuously. The companies use PRM checklist but apply different criteria and items. For efficient risk management in plants, plant PRM checklist is necessary. This study analyzed risk factors that are taken into account in construction projects and proposed a plant PRM checklist based on case analysis and opinions of experts. Also, it rated the frequency and importance of each risk.

Risk based Value Index Evaluation Model for Modular Design Alternatives in Plant Construction Projects (플랜트 건설사업의 모듈러 설계대안별 RVI 평가 모델)

  • Kang, Hyun Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.98-107
    • /
    • 2022
  • The purpose of this study is to suggest a model for evaluation of a risk based value index for modular design alternatives in plant construction projects. Accordingly, 1) Setting the basic project cost and the scope to apply the module, 2) Evaluating the importance, easiness, and effectiveness index for Engineering, Procurement, Fabrication, transportation, and construction work, 3) Estimating the total project cost by analyzing the risk reserve Step, 4) Comparing the effectiveness index and total project cost for each modular design alternative, it was composed of the steps of deriving RVI. To verify such a model, Plan-A, which applied a module to one process, and Plan-B, which applied a module to three processes, were composed to evaluate RVI.