Development of Integrated Cost-Schedule Management Guidelines for EPC Modular Projects (EPC 모듈러 프로젝트의 원가·공정 통합연계관리 지침서 개발)

  • Kim, Donghee;Ha, Minhui;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.76-84
    • /
    • 2020
  • The rate of application of the modular plant in the plant industry is increasing, and for the success of the modularization projects, it is essential to develop and implement a systemized methodology across all phases of the project. However, Korean EPC firms lack project management capability when it comes to apply standardized methodology. Therefore, it is important to establish and systematize the cost/schedule integrated management method which are the two core elements of project management technology. This study was conducted to develop a methodology and guidelines for integrated management process for modular plant projects. The researchers developed a methodology for planning and managing cost and schedule, and integrated by module unit. Integrated cost and schedule methodology and guidelines developed can be used for various EPC modular plant projects to enhance the efficiency of project management.

AGING ASSESSMENT OF CANDU PLANT MAJOR COMPONENTS

  • Jeong, Il-Seok;Lee, Kyoung-Soo;Kim, Tae-Ryong
    • Proceedings of the Korea Society for Energy Engineering kosee Conference
    • /
    • 2003.05a
    • /
    • pp.415-423
    • /
    • 2003
  • Korea Electric Power Research Institute(KEPRI) had worked a comprehensive Plant Lifetime Management (PLiM) project for a CANDU plant in corporation with Korea Hydro and Nuclear Power(KHNP). The project had been performed to understand the aging status of major components screened from the plant and to address provisions for the continued operation over its design life. A feasibility of the continued operation was reviewed in the aspects of technology, economics, and regulatory environments. This paper introduces general approach of aging assessment, screening of critical components and an experience of aging assessment for an example of fuel channel that is the most critical component in CANDU plant.

  • PDF

Project Risk Assessment Through Construction Sequence Analyses for Industrial Plant Construction Projects (산업플랜트 건설 프로젝트의 주요 공정 시퀀스 분석을 통한 리스크 평가)

  • Lee, Kyusung;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.140-151
    • /
    • 2013
  • In 2011 and 2012, Korean construction firms awarded around $ 64.5. Billion each year from the overseas market in 2011. This contract value accounted for overwhelming portion of total overseas construction contract values, and this growth is expected to continue for the next decade. However, contract scopes awarded to the Korean construction firms mainly involve detailed design and construction phases due to their competitiveness for the construction techniques. In other words, front-end-engineering-design and construction project management are not considered part of core business due to the lack of project management skills and experience. The researchers focused on development of construction sequence model required to improve construction planning and scheduling skills for the Korean construction firms. The model identifies critical work items and the sequence throughout project execution process. In addition, the researchers developed a risk evaluation method by applying fuzzy theory to the critical construction activities for the industrial plant construction projects. Developed methodology will help project practitioners to develop project schedule in a timely and effe ctive manner and evaluate project risks associated with scheduling process for the industrial plant construction projects.

공장공학(工場工學)(P. E)에서의 종합적(綜合的) 품질관리(品質管理) T. Q. C. in Plant-Engineering

  • Yun, Seok-Ho
    • Journal of Korean Society for Quality Management
    • /
    • v.8 no.2
    • /
    • pp.29-37
    • /
    • 1980
  • The purpose of this study is to define the role of a T. Q. C. engineer in the plant engineering activities. A "plant engineering" moves to complete a new project through a series of stages such as: 1. Research & Development stage. 2. Economic evaluation & engineering design stage. 3. Erection & start up stage. 4. Final production & control stage. This suggests that the plant engineering project should be carried out with a wide variety of tasks, as well as a central control. For a successful completion of the project, a T. Q. C. engineer is required, in practice, either as a central activity creator or as a key advisor in each task.

  • PDF

Development Of EPC Project Management Procedure Manual System For Plant Project Management (플랜트 프로젝트관리를 위한 EPC전자업무절차시스템 개발)

  • Park, Bum-Jin;Lee, Min-Jae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.487-491
    • /
    • 2006
  • As Korea has been industrialized high recently, the constructional plant part which is the major driving force to Korean economic growth is being developed. In spite of the great importance, there are many ill-prepared parts in EPC project management procedure, and working in practice of EPC project management procedure manual is not systematic. That is why the governmental progressive policy on the relevant technology and the establishment of EPC project management procedure are needed. This study was aimed to derive reform measures by analyzing problems of EPC project management procedure manuals which are in use at 13 large-sized construction companies currently. The reform measures which are based on the theory of PMI(Project Management Institute)'s PMBOK(Porjcet Management Body Of Knowledge) are about deriving administration factors to control the project, and EPC project administration factors are derived from the definition of CMAA(Construction Mangement Association of America). The reformed electronic EPC project management procedure manual system is set up by standardizing derived administration factors.

  • PDF

A study on the development direction for vendor management in plant construction (플랜트 건설공사의 벤더관리 발전방향 기초연구)

  • Park, Hwan-Pyo;Han, Jae-Goo;Chin, Kyung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.189-190
    • /
    • 2011
  • The purpose of this study is to suggest the development direction for vendor management in plant construction. Therefore this research has proposed the integration management of vendor and information standardization. This research has proposed that plant industry association manage the basic information of vendor. And each company manage the performance evaluation of vendor's firm. Expecially, vendor management system should be developed by ISO information system.

  • PDF

Assessment and Management System for Various Risks in Plant Projects (플랜트 프로젝트 리스크의 평가 및 관리시스템에 관한 연구)

  • An, Seung Kyoo;Cho, Dong-Hwan;Hur, Jin-Huek;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.6 no.1
    • /
    • pp.56-63
    • /
    • 2010
  • While the local plant market is reducing its volume, the plant market over the world since 2000s is rapidly expanding. The nation's construction companies, aggressively dedicated in launching out overseas plant market, increase the volume of orders in that sector, but there also are much difficulty in the project management as those projects ordered are gradually large scaled with more cutting-edge high-tech requirements along with comparatively higher risk. Though the local construction companies have developed their own types of measures to analyze the risk evaluation putting into practice, the specialized decision-making model for the overseas plant market or the risk measure understandable easily and applicable practically is not yet shown. This paper aims at providing the methodology to evaluate the risk by way of constructing the risk evaluation process in order to induce risk measuring elements through appropriate indexing system. Furthermore, through studying the risk management system, it aims to seek for a thorough risk management method from beginning of the project to the end.

  • PDF

Development of Synchro-EVM System Integrating TOC-CPM and EVM (TOC-CCPM과 EVM을 통합한 Synchro-EVM 시스템 개발 연구)

  • Lee, Do-Hern;Jang, Gil-Sang
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.4
    • /
    • pp.291-299
    • /
    • 2017
  • Recently, many business and government organizations have benefitted by executing projects using TOC-CCPM(Theory of Constraints-Critical Chain Project Management). In parallel, Earned Value Management(EVM) metrics have also become popular. Many organizations like US government requires that all large projects measure and report project progress status using EVM. Thus, project management in business fields such as plant construction, IT development, ship building need to integrate TOC-CCPM and EVM in oder to keep and reduce the delivery date of projects for improvement of customer satisfaction and enlargement of business opportunity. This paper proposes the scheme and case of developing the Synchro-EVM system which TOC-CCPM and EVM are connected.

Systems Engineer Program for Practical Nuclear Power Plant Engineering Education (실용적인 원전공학 교육을 위한 시스템즈 엔지니어 프로그램)

  • Chang, Choong-koo;Jung, Jae-cheon;DIA, Aminata
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.11 no.2
    • /
    • pp.31-40
    • /
    • 2015
  • KEPCO International Nuclear Graduate School (KINGS) is dedicated to nurturing leadership-level professionals in nuclear power plant (NPP) engineering. KINGS have designed curriculum based on two philosophies. First, we balance aspects of discipline engineering, specialty engineering, and management engineering in the framework of systems engineering. Second, KINGS have designed the curriculum so that students can learn and experience the know-what, know-how and know-why level knowledge of NPP engineering and management. The specialization programs are opened during the 2nd year for 3 trimesters and those are a process of learning through practical project courses. The objectives of the specialization programs are to help students to learn the NPP life cycle technologies in highly structured and systematic ways. The systems engineer program (SEP) is one of the specialization programs. A practical case of the SEP which was applied to the project course for the NPP electric power system design education will be elaborated in this paper.

Basic Research on Nuclear Power Plant Construction Claims and Dispute Management Processes Development

  • Son, HyeJin;Lee, SangHyun;Byon, SuJin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.710-711
    • /
    • 2015
  • A nuclear power plant construction is a complex form of construction which comprises various stakeholders and contractors. Therefore, contract disputes will occur due to conflicting interests of contracting parties and unpredictable factors which arise during construction work. Even if the contract is well prepared, it cannot fully prepare for future situations in actuality. Claims management is very important in carrying out construction management. This study intends to define claim, and delve into development of claims management processes from the viewpoint of owners and contractor through consideration on international contract terms on claims management and the details of the claims management of the Construction Extension to the PMBOK. In addition, it is needed to accumulate and manage data on claims that have occurred so that they can be referenced in the future. As information should be accumulated so that type classification can be carried out and that lessons can be learned on claims that have occurred in each business site, study on establishing data-based systems relating to claims processes will be needed in the future.