• Title/Summary/Keyword: Plant Project Management

Search Result 263, Processing Time 0.031 seconds

A study on the integrated data modeling for the plant design management system and the plant design system using relational database (관계형 데이터베이스를 이용한 PDMS/PDS의 통합 데이터 모델링에 관한 연구)

  • 양영태;김재균
    • Journal of Ocean Engineering and Technology
    • /
    • v.11 no.3
    • /
    • pp.200-211
    • /
    • 1997
  • Most recently, offshore Engineering & Construction field is concerned about integration management technology such as CIM(Computer Integrated Manufacturing), PDM(Product Data Management) and Enterprise Information Engineering in order to cope with the rapid change of engineering and manufacturer specification as per owner's requirement during construction stage of the project. System integration and integrated data modeling with relational database in integration management technology improve the quality of product and reduce the period of the construction project by reason of owing design information jointly. This paper represents the design methodology of system integration using Business Process Reengineering by the case study. The case study is about the offshore plant material information process from front end engineering design to detail engineering for the construction and the basis of monitoring system by integrating and sharing the design information between the 2D intelligent P&ID and 3D plant modeling using relational database. As a result of the integrated data modeling and system integration, it is possible to maintain the consistency of design process in point of view of the material balancing and reduce the design assumption/duration. Near future, this system will be expanded and connected with the MRP(Material Requirement Planing) and the POR (Purchase Order Requisition) system.

  • PDF

A Study for Selecting the Plant Project Risk Management Check List (플랜트 PRM (Project Risk Management) 체크리스트 항목 선정을 위한 연구)

  • Choi, Doo-hoi;Bang, Hong-soon;Lee, Tae-hyeong;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.54-64
    • /
    • 2018
  • Currently, as construction businesses develop and diversity, risk became one of the most crucial considerations. Risks are potential and difficult to predict by nature. Also, they are important as they influence delay in construction period and increase of project costs. In construction projects in South Korea and elsewhere, the importance of risk management widely recognized and relevant research is being conducted continuously. The companies use PRM checklist but apply different criteria and items. For efficient risk management in plants, plant PRM checklist is necessary. This study analyzed risk factors that are taken into account in construction projects and proposed a plant PRM checklist based on case analysis and opinions of experts. Also, it rated the frequency and importance of each risk.

A Study on Automatic Space Analysis for Plant Facilities Based on 3D Octree Argorithm by Using Laser Scanning Information

  • Kim, Donghyun;Kwon, Soonwook;Chung, Suwan;Ko, Hyunglyul
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.667-668
    • /
    • 2015
  • While the plant projects grow bigger and global attention to the plant is increasing, efficient space arrangement is not working in plant project because of the complex structure in installing the equipment unlike the construction project. In addition to this, presently, problem in installation process caused by the disagreement between floor plan and real spot is rising. Therefore the target of this research is to solve the problems and reaction differences, caused by changing the space arrangement in installing the equipment of plant construction. And this research suggests the equipment arrangement method for construction and related processes. To solve the problem, 3D cloud point data of space and equipment is collected by 3D laser scanning and the space matching is operated. In processing the space matching, data is simplified by applying the octree algorithm. This research simplifies the 3D configuration data acquired by 3D scanner equipment through the octree algorithm, and by comparing this data, identifies the space for target equipment, and finally suggests the algorithm that makes the auto space arrangement of equipment possible in construction site and also suggests the process to actualize this algorithm.

  • PDF

Risk-sharing Strategies on EPC Contracts: Lessons-learned from Sabine Pass Liquefaction Project

  • Yoon, Sang-Moon;Lee, Jung-Heon;Lee, Eul-Bum
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.629-630
    • /
    • 2015
  • 'Sabine Pass Liquefaction Project (SPL Project)', a case study in this report, is the first construction project of a U.S. liquefaction facility for shale gas export overseas. This study analyzes the SPL Project to give understanding and a guideline to Korean EPC companies by benchmarking about effective risk-sharing strategies on EPC contracts. This study consists of three parts. The first summarizes the liquefaction process adopted on the SPL Project, named the 'ConocoPhillips Optimized Cascade Process', and compares it with other competitive liquefaction processes. The second introduces the unique features of the SPL EPC contract by comparing it with two other EPC forms of contracts: a FIDIC Silver Book for onshore plant projects and a contract of an offshore oil production (FPSO) project. The third focuses on the complexity of project financing (PF), especially lenders control and impact on the EPC contract such as covenant provisions to constrain variations and changes on the EPC Contract. From these conclusions, it is anticipated that this case study can provide a guideline for successful performance of Korean EPC contractors overseas.

  • PDF

Research on the Methode of Construction Information Management Considering the Nuclear Power Plant Life Cycle (원자력발전소 생애주기를 고려한 시공정보 관리방안 연구)

  • Byon, Su-jin;Lee, Sang-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.229-230
    • /
    • 2016
  • The Nuclear Power Plant construction industry has the related to Information-integration field. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each life-cycle phase. Particularly this paper related to the construction information of component.

  • PDF

An Exploratory Study on Conceptual Framework for Project-based Supply Chain Management : Focusing on Plant Engineering Firms (프로젝트형 SCM의 개념적 틀에 관한 탐색적 연구 : 플랜트 엔지니어링 기업을 중심으로)

  • Kim, Tae Ung
    • Journal of Digital Convergence
    • /
    • v.16 no.12
    • /
    • pp.123-135
    • /
    • 2018
  • The objective of this paper is to investigate the issues related to the supply chain management in plant engineering industry, and propose the framework to improve the project efficiency. The preliminary case study shows that EPC's fragmented nature, lack of coordination and information sharing, and lack of proper risk and change management contribute to project delay and cost overrun. To examine the level of informatization and information sharing in supply chain, survey responses from the suppliers and subcontractors have been collected. The statistical results show that information sharing, early involvement in design process and awareness in SCM have influenced the level of collaboration, but supplier assessment and informatization have no impact on the collaboration. A conceptual model is proposed in order to facilitate the integration of design, procurement and construction functions. Implications from the study are also provided.

EBS for BIM based maintenance management of Thermal Power Plant (BIM기반 화력발전시설 유지관리를 위한 EBS(Elements Breakdown Structure)개발)

  • Kim, Chang-Soo;Cha, Sang-Hoon;Ji, Soung-Min
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.81-82
    • /
    • 2015
  • BIM has been a reliable construction project management tool to handle various kinds of construction information generated in the facility life cycle. To take these advantages, researchers have been promoted numerous studies in a residential, a commercial, and an educational facilities with a large number of on-going projects. However, despite running as the role of essential energy supplier, power plant related BIM research is relatively insufficient than others. In particular, due to the extending of the facility service period and the requirement of the complicated construction project management for 'overhaul' and 'repowering' in the power plant maintenance phase, the needs for using BIM have been increased gradually. For using BIM based maintenance, it is needed to consider an information collecting methods and necessary to develop an appropriate breakdown structure to share information. Therefore, 'EBS' is produced by reviewing the previous research related to BIM and analyzing the repair activities in the maintenance phase. Proposed 'EBS' must be useful not only a judgment between capital expenditure versus revenue expenditure but also appropriate maintenance strategies development for property management.

  • PDF

A Presentation of a Cost Classification System for Gas Plant Construction Projects

  • Park, Moonsun;Kim, Yongsu
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.625-626
    • /
    • 2015
  • The purpose of this study is to present a cost classification system that can be used in gas plant construction projects. Towards this end, it examined the detailed statements of the construction companies which had experience in carrying out plant construction projects. Based on the above, it also presented a life-cycle (i.e., EPCC) cost classification system for the gas plant construction projects by conducting the Delphi analysis through the expert opinions.

  • PDF

Fundamental Investigation of Knowledge Management System for a Plant

  • Seo-kyung Won;Ji-Yune Soh;Junbok Lee ;Choong-hee Han
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.375-380
    • /
    • 2009
  • Gas & Oil plant construction projects are increasing recently all over oil-producing countries. An EPC (Engineering, Procurement and Construction) company, which participates in the plant projects, should possess pertinent engineering licenses and EPC management skills to create high added-value. Nonetheless, there exist various risks involved in the EPC life cycle process due to such characteristics of construction projects as long duration of construction time and complicated processes along with the procured goods or services subjected to various logistics. The objective of this paper is to analyze the overall EPC life cycle for proper process and to examine various information and document. Additionally, the principal data for the analysis of the EPC process are derived from personal interviews with experts and specialty contractors of the plant projects. The results of this study would be widely used as a guide for efficient and effective management of overseas gas plant projects.

  • PDF

Development of Work Breakdown Structure for Nuclear Power Plant (원자력발전소 Work Breakdown Structure 개발)

  • Cho, Yeong-Heock;Yang, Myung-Duck
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.52-53
    • /
    • 2014
  • The Work Breakdown Structure (WBS) is a primary tool which provides a framework that defines clear scope of all deliverables throughout the project life cycle. Once the WBS is established in projects, it should allow project team members to measure and manage work performances by the WBS; further, it should provide a reference point when any work scope needs to be redefined. Based on the project information in the Progress and Performance Measurement System (PPMS) of UAE's Barakha Nuclear Power Plant (BNPP) projects, an attempt was made to develop a new WBS which provides hierarchical and systematical decomposition of the total work scope of NPP construction projects while avoiding from the preexistence concept in Korean NPP projects that the WBS is a combination of Physical Breakdown Structure (PBS) and Functional Breakdown Structure (FBS). The unique features of the new WBS are as follows: (1) defined the definition of each level of the WBS, (2) subdivided the WBS into 5 hierarchical levels, and (3) adopted globally used general coding structure. The new WBS provides a basic hierarchical structure for the project scope and can be used as a basic tool for schedule control, performance measurement, project status monitoring, and communication among project participants. In addition, by putting the Work Package (WP) under the WBS, the Earned Value Management System (EVMS) per WP can be utilized for the project.

  • PDF