PLM system has been widely used in whole industry. Specially, in case of the company that constructs the engineering plant, PLM can be a key success tool for the innovation with ERP and Enterprise IT Systems. This paper describes the innovation strategy for engineering plant PLM including Master Data management, EPC project management, full 3D modeling and quality management.
In Japan, the membrane filtration is becoming a common technology for municipal water supply system especially for small plant. 6 years before (1991), the national research project of membrane filtration for small plant has started. The project was named as "MAC 21", MEMBRANE AQUA CENTURY 21. In the project the Ministry of Health and Welfare, 8 universities and 18 water treatment plant companies have been involved. This was the first attempt to research a common theme in joint with government, universities and private companies. After three years, the guide line for membrane filtration application for small plant has been established. This has promoted to install some actual plant. And also, another joint research for "RESEARCH OF MEMBRANE FILTRATION FOR ADVANCED WATER TREATMENT" has started in 1994 and completed in March, 1997. The project was named as MAC21. In the former project the main objectives were removal of turbidity and bacteria from water. However, in new project the objective was establishment of the further advanced membrane filtration technology which would be applicable for trace chemical components removal such as tri-halo-methane pre-courser, agricultural chemicals removal, offensive smell and taste removal and virus removal. For the objectives, application of nanofiltration and hybrid-system, a combination of micro-filtration ultra-filtration with biological, ozone and activated carbon treatment process have been studied. In addition, application of membrane filtration for treatment of back-wash waste water originated from membrane filters and conventional sand filters has.been studied. At the end of March of this year, about 30 membrane filtration plants are actually supplying the water, the total treatment capacity is about 6,000 m$^{3}$/day and another 20 will be installed within one year.led within one year.
The systems engineering standard process is intended to be customized for a given project environment and system characteristics. This study describes the experience gained by applying systems engineering to government-funded projects. The characteristics of government funded project are lack of common development process among the participating organizations and mechanism to determine system requirements. This study describes the contents of the systems engineering activities, including development of operational concept, system requirements, verification requirements (test cases), test verification plan, and implementation of system test and lessons learned from these activities.
John Walewski ;Stuart Anderson;Jaeheum Yeon;Amy Kim
국제학술발표논문집
/
The 5th International Conference on Construction Engineering and Project Management
/
pp.451-458
/
2013
This research documents the initial findings and recommendations for developing a risk management tool to assess and quantify the risks associated with the construction of the next generation of nuclear power plants. The proposed tool builds upon the Construction Industry Institute's International Project Risk Assessment (IPRA) Best Practice. This paper provides an overview of the investigation to assess the unique risk elements pertaining to nuclear power plant construction and documents the preliminary findings from historical project performance data to better understand the function and use of the IPRA's Relative Impact value.
석탄화력발전소의 건설사업비를 국내 500 MW급 석탄화력발전소를 대상으로 확률적 모의실험 방법인 몬테카를로 시뮬레이션을 통해 추정하였다. 물가상승률을 적용한 실적 건설사업비에 확률적 모의실험 이론을 적용하였고, 전산 모사 소프트웨어를 통하여 건설사업비를 추정하였다. 확률적 모의실험을 통한 국내 500 MW급 석탄화력발전소의 총 건설사업비는 2011년 12월 불변가 기준, 신뢰수준 95%에서 인접발전소가 없는 경우 약 1조 8,700억 원에서 2조 3,300억 원이며 토목공사의 비중과 민감도가 높은 것으로 나타났고, 인접발전소가 있는 경우 약 1조 2,400억 원에서 1조 5,900억 원이며 기자재비의 비중과 민감도가 높으며, 건설사업비 추정시 물가상승률을 적용해야 적합한 결과가 도출되는 것으로 나타났다.
국내 건설업계는 자체 엔지니어링 기술 확보 및 높은 수준의 건설사업 관리기술의 보유와 더불어 사업초기 단계에서 해당 프로젝트의 경제적 타당성 평가를 수행할 수 있는 능력이 절실히 요구되어진다. 시설물의 설계 및 시공 기술은 최근의 국제 시장에서 수주를 위해서는 반드시 필요한 부분이며 수익을 창출할 수 있는 사업수행을 위해서는 사업초기단계부터 사후유지관리까지의 연속적인 건설사업 관리기술이 요구되어진다. 건설사업 관리기술은 프로젝트 시작단계에서부터 운영 유지관리 단계까지 단계별로 발생하는 비용에 대해 얼마나 경제적이고 효율적으로 관리하느냐에 따라 프로젝트의 성공여부를 결정짓는 역할을 한다. 이러한 단계별 비용항목의 체계적인 분석을 위해 본 연구에서는 국내 하수처리장을 대상으로 프로젝트 전반에 걸친 비용흐름 및 요소를 조사하였다. 특히 국내 하수처리시설의 유지관리비 DB를 조사하여 데이터 모델링을 수행하였고, 실적 DB의 불확실성을 고려하여 불확실성 해소를 위해 몬테카를로 시뮬레이션 방법을 이용하여 타당성 평가를 위한 평가 목적별(처리공법, 운영 주체 등) 유지관리비 예측 추세선을 제시하고자 하였다.
The supply chain in plant construction project can be defined as a network combined between elements which is engineering, procurement, construction, start-up. For successfully leading construction project, close relation and mutual cooperation should be preceded and Supply Chain Management(SCM) system is needed to improve the relation. In particular, because safety is a top priority for the companies work in the construction of Nuclear Power Plant(NPP), it is necessary to control all parties realated with NPP construction systematically. In this situation, it is important to purchase high-quality equipment in timely manner by developing Integrated cooperative systems. Therefore, this study aimed to propose developing solutions of SCM such as JIT and Envelop Design system, which can reduces difficulties of decision making between the parties involved in the project and will increase the efficiency of the engineering process in NPP.
EVM(Earned Value Management) is a management methodology for integrating scope, schedule and resources, and for objectively measuring project performance and progress. EVMS(Earned Value Management System) has been used for the performance measurement of R&D and construction projects in developed countries such as United States, United Kingdom and Australia. The nuclear power plant (NPP) projects in Korea have not applied EVMS. However, EVMS has come into request for overall schedule and cost risk management and performance measurement in overseas project of the nuclear power plant as a contractor. In this paper, based on the global EVMS guidelines, EVMS per unit processes have been developed for NPP projects. Moreover, using Business Process Management (BPM), it proposes an integrated process model with tasks, roles, and procedures for EVMS for NPP construction projects.
The purpose of this study is to define the role of a T. Q. C. engineer in the plant engineering activities. A "plant engineering" moves to complete a new project through a series of stages such as: 1. Research & Development stage. 2. Economic evaluation & engineering design stage. 3. Erection & start up stage. 4. Final production & control stage. This suggests that the plant engineering project should be carried out with a wide variety of tasks, as well as a central control. For a successful completion of the project, a T. Q. C. engineer is required, in practice, either as a central activity creator or as a key advisor in each task.
The construction project can be defined as a network combined between elements which are engineering, procurement, construction, start-up, and has a plenty of subjects and partners. For the successful project management in construction industry, it is necessary to adopt various management methods, such as lean production, information network system, SCM(Supply Chain Management), which can increase the efficiency of project management. During recent years, even though various management techniques have been applied, the SCM system has not formulated in construction industry. Especially, the Nuclear Power Plant Construction which requires high regulations of the safety and security has not applied SCM. Therefore, this study aimed to propose technology area of SCM in Korean Nuclear Power Plant Construction.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.