• Title/Summary/Keyword: Plant Management

검색결과 3,495건 처리시간 0.029초

원자력발전소 생애주기를 고려한 시공정보 관리방안 연구 (Research on the Methode of Construction Information Management Considering the Nuclear Power Plant Life Cycle)

  • 변수진;이상현
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.229-230
    • /
    • 2016
  • The Nuclear Power Plant construction industry has the related to Information-integration field. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each life-cycle phase. Particularly this paper related to the construction information of component.

  • PDF

PX 공장에서의 공정위험성 재평가에 의한 위험관리 (Risk Management for PX Plant Through Revalidation of Process Hazard Analysis)

  • 임종우;우인성
    • 대한안전경영과학회지
    • /
    • 제19권3호
    • /
    • pp.35-42
    • /
    • 2017
  • Process Hazard Analysis(PHA) have been performed for a risk management of process (petrochemical) industry for nearly 50 years. There are many PHA methods for application in the process industry, Hazop Study method has been recognized as a good method used typically in most of phase of process plant. And also there was inconvenient opinion that Hazop Study is too resource (man power, time etc.) consuming comparing its result performance (a quality of recommendations) for a good operating and existing plant. In this study, two types of PHA method - checklist and K-PSR - were performed respectively for a new para-xylene(PX)plant and 30 year old PX plant. Past history and experience of incident, operation, maintenance and so on are very important in PHA by those two methods. The higher effectiveness were realized in PHA by a checklist and K-PSR Method than prior Hazop study. And also some suggestions including PHA cycle determination, RBPS application, Follow-up plan of PHA result etc. were proposed about PHA improvement measures for a best risk management.

플랜트 프로젝트 관리체계 표준화 기술 개발;연구단 소개 (Management Research in Plant Construction;Introduction of research center)

  • 이영남;김찬수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.213-220
    • /
    • 2006
  • 플랜트건설 산업은 엔지니어링과 기계설비의 조달, 시공이 융합된 복합산업(EPC)으로 건설업체의 수주에 따라 기계 ${\cdot}$ 설비 등 타 분야의 성장을 함께 도모할 수 있는 높은 고부가가치 산업이다. 따라서 플랜트건설 수주의 증대는 향후 건설업체뿐만 아니라 국가경제 전반의 성장에 지대한 영향을 끼치는 중요한 이슈이다. 특히, 근래에 중동지역의 경우 고유가에 자극 받은 국가들의 가스와 석유화학 등의 시설에 대한 지속적인 투자로 플랜트 분야의 수요가 급증하는 등 해외 건설시장에서의 플랜트 분야의 시장이 매우 성장하고 있다. 하지만 국내의 해외플랜트 건설업체들이 미국, 유럽 및 일본의 선진기업들과의 경쟁에서 우의를 점하여, 매출과 이윤을 늘리고 꾸준히 사업을 영위하기 위해서는 플랜트 건설산업의 국제 경쟁력을 조속히 확보하는 것이 필요하다. 따라서 본 연구는 해외 건설시장에서 국내 플랜트 관련 업체들의 프로젝트 수행기술 전반을 향상시켜 지속적인 경쟁력을 확보하기 위하여 플랜트 건설사업의 각종 표준과 프로젝트 관리 및 정보관리체계 등 플랜트 프로젝트 관리의 선진화된 기술을 개발하고자 한다.

  • PDF

BSC를 이용한 설비관리 업무의 성과평가시스템 개발 (Development of Performance Evaluation System for Plant Management Appling BSC Concept)

  • 김광만
    • 한국컴퓨터정보학회논문지
    • /
    • 제17권2호
    • /
    • pp.231-239
    • /
    • 2012
  • 기업의 생산 및 서비스 영역에서 설비의 의존도가 심화되고 있다. 이에 따라 설비를 효율적으로 관리하기 위한 설비관리 업무의 중요도도 증가하고 있다. 효과적인 설비관리 업무는 설비의 수명을 연장시키고 설비운영 효율을 증가시킨다. 체계적인 성과평가시스템은 작업자의 업무의욕을 증대시켜 설비관리 업무의 수준을 높일 수 있다. 설비관리 업무의 성과평가를 위한 다양한 연구가 이루어져 왔으나 전략을 중심으로 한 체계적인 성과평가 연구는 다소 부족한 상황이다. BSC는 비전을 달성하기 위한 전략을 중심으로 균형있고 체계적인 성과평가 방법으로 많이 활용되고 있다. 이에 본 연구에서는 BSC 개념을 적용하여 설비관리 업무에 대한 성과평가시스템을 개발하였다.

플랜트 유틸리티 시공에서 리스크 관리에 관한 연구 (On the Analysis of Risk Management for a Utility Construction Work in Plant Projects)

  • 한기돈;허진혁;문승재;유호선
    • 플랜트 저널
    • /
    • 제6권1호
    • /
    • pp.64-70
    • /
    • 2010
  • From 2000, the world plant market, especially plant developing business related to oil and gas, has been increasing. Domestic construction companies advance to overseas plant construction market actively, and proportioning to this, an importance of utility construction is increasing. However, the project becomes large and high-tech, and many companies experience difficulty of project management due to relatively high risk of overseas construction. In this study, we built the standard process with which domestic company can evaluate the risk of overseas plant utility construction. Primary factors for risk evaluation is derived, classification system is made out, primary factor is analyzed, and counter plan is suggested. And thorough management of risk is performed by risk management organization that manages the risks, risk control methods, reports and monitors through risk sheet and risk action log from the start of project to the end.

  • PDF

Trends of Market and Approval Management System for in vitro Diagnostic Veterinary Medical Reagents in Korea

  • Kang, Kyoung-Mook;Kang, Min-Hee;Suh, Tae-Young;Kang, Hwan-Goo;Moon, Jin-San
    • 한국임상수의학회지
    • /
    • 제35권4호
    • /
    • pp.119-125
    • /
    • 2018
  • In vitro diagnostic veterinary medical reagents (IVDVMRs) were diverted the medical devices from medicine by the revision of the pharmaceutical affairs act enforcement regulations in 2015 in Korea. It classified into class I-IV according to risks of individual and public health. However, good manufacturing practices requirements on IVDVMRs were exempted from the current system. The registration of IVDVMRs by the Animal and Plant Quarantine Agency has gradually increased since 2012, and total of 584 products from 68 companies were registered from 1978 to 2017. Most of these items are clinical immunochemistry (infection disease), clinical immunochemistry (non-infection disease), molecular genetics, endocrinology, blood gas analysis, clinical microbiology, toxin, heavy metal and drug of abuse, other etc. The market size of IVDVMRs reported from the Korea Animal Health Products Association was estimated to be approximately 51.9 billion won in 2017. The domestic consumption and the export sales were approximately 31.2 and 20.7 billion won, respectively. They are increasing 23.9% (CAGR) in domestic consumption and 40.4% (CAGR) in export from 2011 to 2017.

옥상녹화 기술의 특허출원 동향분석 (Analysis of Trends in Patent Applications for Rooftop Greening Techniques)

  • 이은희;강규이;나은정
    • 한국환경복원기술학회지
    • /
    • 제8권1호
    • /
    • pp.88-99
    • /
    • 2005
  • This research aimed to investigate the current trends of rooftop greening techniques of frequent use within and without Korea. It is also expected that this research will help developing new rooftop greening techniques appropriate for Korean environment. Data for this study have been collected from patent applications for rooftop greening techniques; the web sites of the Korean Intellectual Property Office as well as patent offices in Germany and Japan, where active researches on rooftop greening techniques are in progress. 168 applications within a period from the year of 1984 to December of 2004 were examined, among which Japan excelled with its 81 applications followed by Germany(54), Korea(31)and USA(2). In case of Japan, where more patent applications were found than in any other countries, applications for Plant Base(38) excelled others - System(36), Management(4) and Plant(3) in the number of applications. As for Germany, 25 cases were on Plant Base, 25 cases on System, and 4 cases on Plant; in Korea, 15 cases were on Plant Base, 11 cases on System, 3 cases on Plant and 2 cases on Management; in USA, 1 cases were on System and 1 cases on Plant. Overall, the total number of patent applications in three countries reaches 168 cases; among which Plant Base topped in all four countries, followed by 73 cases on System. Applications concerning Plant and Management totalled to 11 and 6 for each. In conclusion, most patents were concentrated on Plant Base and System while researches on Plant and Management still do not get as much attention as they deserve. Research and development of various techniques on Plant must be a precondition for the formation of diverse Bio-tops suitable for the environments of specific areas. Concrete researches on rooftop greening techniques will contribute to the improvement of urban ecosystem by developing more convenient and easily applicable techniques during the time of actual construction.

A REAL-TIME PMIS BASED INDUSTRIAL CONSTRUCTION PROJECT MANAGEMENT SYSTEM

  • Kyusung Lee;Hojeong Song;Jaehyun Choi
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.352-358
    • /
    • 2013
  • As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner

  • PDF

가압중수로형원전의 중대사고 대응능력 연구 (A Study on Severe Accident Management Capabilities and Strategies for CANDU Reactor)

  • 최영;박종호
    • 한국안전학회지
    • /
    • 제29권5호
    • /
    • pp.160-165
    • /
    • 2014
  • The realistic cases causing severe core damage should be analyzed and arranged systematically for preparing an accident management of the specific nuclear power plant. The objective of this paper is to establish basic technical information for reactor safety and reactor building integrity management strategies in CANDU reactor severe accident. For the development of severe accident management strategies, plant specific features and behaviors must be studied by detailed analysis works. This analysis scope will serve to cover overall methods and analyzing results to understand the reactor building integrity status in the most likely severe accident sequences that could occur at CANDU reactor. Also analysis results could help prevent or mitigate severe accidents for the identification of any plant specific vulnerabilities to severe accidents using the probabilistic safety assessment (PSA) quantified results.

원전건설 성과관리시스템(EVMS) 개발을 위한 프로세스 모델 연구 (Process Model for development of EVMS in Nuclear Power Plant Project)

  • 김윤명;원서경;신일섭
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.58-59
    • /
    • 2014
  • EVM(Earned Value Management) is a management methodology for integrating scope, schedule and resources, and for objectively measuring project performance and progress. EVMS(Earned Value Management System) has been used for the performance measurement of R&D and construction projects in developed countries such as United States, United Kingdom and Australia. The nuclear power plant (NPP) projects in Korea have not applied EVMS. However, EVMS has come into request for overall schedule and cost risk management and performance measurement in overseas project of the nuclear power plant as a contractor. In this paper, based on the global EVMS guidelines, EVMS per unit processes have been developed for NPP projects. Moreover, using Business Process Management (BPM), it proposes an integrated process model with tasks, roles, and procedures for EVMS for NPP construction projects.

  • PDF