• Title/Summary/Keyword: Plant Equipment

Search Result 914, Processing Time 0.035 seconds

Survey Study of Optimal Cooling Equipment Capacity of the Large Hospitals in Busan City (부산지역 대형병원 냉방장비의 용량설정 실태조사)

  • Lee, Ji-Weon;Chin, Kyung-Il;Kim, Se-Hwan
    • KIEAE Journal
    • /
    • v.14 no.6
    • /
    • pp.105-110
    • /
    • 2014
  • The basic factors determining the amount of energy used in hospital buildings are weather conditions and building factors. But the real energy consumer is central plant equipment such as boilers and chillers that produce thermal energy for heating and cooling. Inaccurate decision of the primary equipment's size can cause a high initial-cost, an excessive equipment space, a wasted energy by low operation-efficiency and shortening of the machine's life. In this reason, the decision of optimal size for central plant equipment is very important. There are several factors for the decision such as an operation factor, a factor (equipment factor), piping losses and a simultaneous usage factor applied in the sizing process except a basic cooling load. But there is no standard method for applying those factors. Usually, factors are applied individually by an experience or custom of each engineer. In this study, the authors emphasize the meaning and the problem of those factors, examine them by analyzing factors which were applied to actual practices, and propose the recommendation value of safety, load, operation factors and application methods.

Experimental Quality Characteristics for Water Removal in Inner Flushing Oil in Process Piping of Offshore Plant (해양플랜트 프로세스 배관 내경 플러싱 오일속에서 수분제거를 위한 실험적 품질 특성)

  • Park, Chang-Soo;Sung, Ki-Young;Han, Seong Jong
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.22 no.6
    • /
    • pp.797-805
    • /
    • 2019
  • An important problem of offshore plant process piping is equipment accidents due to the removal of fine metal debris and foreign substances in the pipes that deliver fluids such as hydraulic oil, lubricating oil and thermal oil. Temporary flushing equipment to remove debris uses fluid equipment of centrifugal pump and gear pump to prevent equipment accident of offshore platform. The equipment manufacturer requires the shipyard to have a cleanliness rating inside the pipe to meet the international standards ISO4406 and NAS1638 quality levels to prevent damage to the equipment sold. The quality of the internal flushing of pipes conforms to the regulations suggested by the equipment manufacturer. In this paper, three types of electric heater capacity, which is a method of evaporating and removing water inside a pipe during an oil flushing process, were compared. In addition, the study was conducted to remove the flushing oil in the pipe and to improve oil quality.

Code Requirements for Fuel Handling Equipment at Nuclear Power Plant

  • Chang, Sang-Gyoon;Kang, Tae-Kyo;Kim, Jong-Min;Jung, Jong-Pil
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.20 no.1
    • /
    • pp.119-126
    • /
    • 2022
  • This study provides technical information about the nuclear fuel handling process, which consists of various subprocesses starting from new fuel receipt to spent fuel shipment at a nuclear power plant and the design requirements of fuel handling equipment. The fuel handling system is an integrated system of equipment, tools, and procedures that allow refueling, handling and storage of fuel assemblies, which comprise the fuel handling process. The understanding and reaffirming of detailed code requirements are requested for application to the design of the fuel handling and storage facility. We reviewed the design requirements of the fuel handling equipment for its adequate cooling, prevention of criticality, its operability and maintainability, and for the prevention of fuel damage and radiological release. Furthermore, we discussed additional technical issues related to upgrading the current code requirements based on the modification of the fuel handling equipment. The suggested information provided in this paper would be beneficial to enhance the safety and the reliability of the fuel handling equipment during the handling of new and spent fuel.

Development of monitoring system of static frequency converter in pumped storage power plant (양수발전소 SFC 감시시스템 개발)

  • Lee, Joo-Hyun;Lim, Ick-Hun;Ryu, Ho-Sun;Sin, Man-Soo;Kim, Bong-Suk
    • Proceedings of the KIEE Conference
    • /
    • 2006.04a
    • /
    • pp.213-215
    • /
    • 2006
  • A static frequency converter(SFC) in a pumped storage power plant is important equipment for converting electric motor kinetic energy into electric Bower. A SFC monitoring system consists of high voltage thyristor firing equipment, fault detection module, data gathering module, real time data processing equipment and man machine Interface system. This paper describes SFC system overview, developed SFC monitoring system configuration including system characteristics. and successful application result to San-Cheong pumped storage power plant.

  • PDF

Development of CMMS for the real-time CBMS (CMMS(Computerized Maintenance Management System)의 실 시간적인 CBMS(Condition Based Maintenance System) 연구)

  • 박주식;박재현;강경식;이광배
    • Journal of the Korea Safety Management & Science
    • /
    • v.2 no.4
    • /
    • pp.1-8
    • /
    • 2000
  • Equipment and machine of industrial plant are give effect to mechanical-stress of many working-stop or long time operating. Therefore, to be old and decrepit of every king of equipment. As long time operating equipment period into increase conservation and of repair equipment time is efficacious necessity of utility factor gradually that of productivity of diminution and complete equipment expense of increase. Conservation at special skill working and necessity is that will effectually and complete a period prevention management diagnosis can conservation point at issues at in advance.

  • PDF

A Study on the Diagnostic Algorithm for Arc Flash of Power Equipment (전력기기의 아크 플래시 진단 알고리즘에 관한 연구)

  • Lee, Deok-Jin
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.29 no.7
    • /
    • pp.449-453
    • /
    • 2016
  • The amount of electrical energy has been increased with the rapid development of the industrial society. Accordingly, operating voltage of the power equipment and facility capacity are continuously increasing. Development trends of recent high-voltage electrical equipment are ultra high-voltage, large-capacity and compact. Early diagnosis of a failure of the power plant has been emerging as an important task as to supply high quality power to users. In this study, we have tried to develope an algorithm for distinguishing an arc fault signal generated in the power plant by using UV sensor.

Development of firing equipment and monitoring system for electric power conversion system for high voltage and large current (고압 대전류용 전력변환 점호장치 및 감시시스템 개발)

  • Lee Joo-Hyun;Lim Ick-Hun;Ryu Ho-Sun
    • Proceedings of the KIPE Conference
    • /
    • 2006.06a
    • /
    • pp.481-484
    • /
    • 2006
  • A electric power conversion system in a pumped storage power plant is important equipment for converting electric motor kinetic energy into electric power. A electric power conversion monitoring system consists of high voltage thyristor firing equipment, fault detection module, data gathering module, real time data processing equipment and man machine interface system. This paper describes electric power conversion system overview, the developed SFC monitoring system configuration including system characteristics, and successful application result to San-Cheong pumped storage power plant.

  • PDF

ATWS Frequency Quantification Focusing on Digital I&C Failures

  • Kang Hyun Gook;Jang Seung-Cheol;Lim Ho-Gon
    • Nuclear Engineering and Technology
    • /
    • v.36 no.2
    • /
    • pp.184-195
    • /
    • 2004
  • The multi-tasking feature of digital I&C equipment could increase risk concentration because the I&C equipment affects the actuation of the safety functions in several ways. Anticipated Transient without Scram (ATWS) is a typical case of safety function failure in nuclear power plants. In a conventional analysis, mechanical failures are treated as the main contributors of the ATWS. This paper quantitatively presents the probability of the ATWS based on a fault tree analysis of a Korea Standard Nuclear Power Plant is also presented. An analysis of the digital equipment in the digital plant protection system. The results show that the digital system severely affects the ATWS frequency. We also present the results of a sensitivity study, which show the effects of the important factors, and discuss the dependency between human operator failure and digital equipment failure.

A basic Study on Establishment Plan of Design Information Traceability through Design Information Flow Identification for Controlled Equipment during the NPP Lifecycle (원전 생애주기 관리대상 기기의 정보 흐름 규명을 통한 설계정보 추적성 구현방안에 대한 기초 연구)

  • Lim, Byung-Ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.183-184
    • /
    • 2017
  • Some of the information created during the design phase of an New NPP life cycle is useful only for the execution of the construction phase; however, much of the information greatly impacts the longer-term operational phase. To most make use of design and construction information produced by data based design system during the construction and operation phase, This research is identified controlled data and drawn design information of controlled equipment from documents generated during the life-cycle stages. This study aimed to analyze related documents to assure traceability of controlled equipment from design phase through O&M and then suggested DB(Data Base) based control method on technical information of major equipment throughout nuclear power plant lifecycle.

  • PDF