Code Requirements for Fuel Handling Equipment at Nuclear Power Plant |
Chang, Sang-Gyoon
(KEPCO Engineering & Construction Company Inc.)
Kang, Tae-Kyo (KEPCO Engineering & Construction Company Inc.) Kim, Jong-Min (KEPCO Engineering & Construction Company Inc.) Jung, Jong-Pil (Korea Hydro & Nuclear Power Co., Ltd) |
1 | American Nuclear Society, Design Requirements for Light Water Reactor Fuel Handling Systems: an American National Standard, ANSI/ANS-57.1-1992, Re-affirmed 2005, Illinois (2005). |
2 | U.S. Nuclear Regulatory Commission. Control of Heavy Loads at Nuclear Power Plants: Resolution of Generic Technical Activity A-36, Nuclear Regulatory Commission Technical Report, NUREG-0612 (1980). |
3 | U.S. Nuclear Regulatory Commission, Spent Fuel Storage Facility Design Basis, Regulatory Guide 1.13 (2007). |
4 | U.S. Nuclear Regulatory Commission, Light Load Handling System and Refueling Cavity Design, Standard Review Plan 9.1.4 (2014). |
5 | American Society of Mechanical Engineers, Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder), ASME NOG-1, American National Standards, New York (2015). |