• Title/Summary/Keyword: Planning power

Search Result 1,165, Processing Time 0.033 seconds

The Best Line Choice for Transmission System Expansion Planning on the Side of the Highest Reliability Level

  • Sungrok Kang;Trungtinh Tran;Park, Jaeseok;Junmin Cha;Park, Daeseok;Roy Billinton
    • KIEE International Transactions on Power Engineering
    • /
    • v.4A no.2
    • /
    • pp.84-90
    • /
    • 2004
  • This paper presents a new method for choosing the best line for transmission system expansion planning considering the highest reliability level of the transmission system. Conventional methodologies for transmission system expansion planning have been mainly focused on economics, which is the minimization of construction costs. However, quantitative evaluation of transmission system reliability is important because successful operation and planning of an electric power system under the deregulated electricity market depends on transmission system reliability management. Therefore, it is expected that the development of methodology for choosing the best lines considering the highest transmission system reliability level while taking into account uncertainties of transmission system equipment is useful for the future. The characteristics and effectiveness of the proposed methodology are illustrated by the case study using a MRBTS.

Ordinal Optimization Theory Based Planning for Clustered Wind Farms Considering the Capacity Credit

  • Wang, Yi;Zhang, Ning;Kang, Chongqing;Xu, Qianyao;Li, Hui;Xiao, Jinyu;Wang, Zhidong;Shi, Rui;Wang, Shuai
    • Journal of Electrical Engineering and Technology
    • /
    • v.10 no.5
    • /
    • pp.1930-1939
    • /
    • 2015
  • Wind power planning aims to locate and size wind farms optimally. Traditionally, wind power planners tend to choose the wind farms with the richest wind resources to maximize the energy benefit. However, the capacity benefit of wind power should also be considered in large-scale clustered wind farm planning because the correlation among the wind farms exerts an obvious influence on the capacity benefit brought about by the combined wind power. This paper proposes a planning model considering both the energy and the capacity benefit of the wind farms. The capacity benefit is evaluated by the wind power capacity credit. The Ordinal Optimization (OO) Theory, capable of handling problems with non-analytical forms, is applied to address the model. To verify the feasibility and advantages of the model, the proposed model is compared with a widely used genetic algorithm (GA) via a modified IEEE RTS-79 system and the real world case of Ningxia, China. The results show that the diversity of the wind farm enhances the capacity credit of wind power.

The Development of Distribution Planning System and Distribution Line Planning System (배전계획 시스템(DISPLAN) 및 배전계통 운영계획 시스템(DLPLAN)의 개발)

  • Chae Woo Kyu;Park Chang Ho;Jeong Jong Man;Jeong Young Ho
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.73-75
    • /
    • 2004
  • This paper presents the ability and the application of software packages for distribution planning which are DISPLAN(Distribution Planning System) and DLPLAN(Distribution Line Planning System) developed in KEPCO. After calculating size and position of maximum load by administration section for distribution, it forecasts the demand of distribution load considering growth location, increment, new load plan, etc of load by annual. Also it calculates distribution loss, voltage drop using modeled distribution line by you, and support for establishment and enlargement plan of substation and distribution line, decision of most optimal path. And it presents the abstract of used algorithm to develop this system.

  • PDF

Effects of the move towards Gen IV reactors in capacity expansion planning by total generation cost and environmental impact optimization

  • Bamshad, Ali;Safarzadeh, Omid
    • Nuclear Engineering and Technology
    • /
    • v.53 no.4
    • /
    • pp.1369-1377
    • /
    • 2021
  • Nowadays, it is necessary to accelerate the construction of new power plant in face of rising energy demand in such a way that the electricity will be generated at the lowest cost while reducing emissions caused by that generation. The expansion planning is one of the most important issues in electricity management. Nuclear energy comes forward with the low-carbon technology and increasing competitiveness to expand the share of generated energy by introducing Gen IV reactors. In this paper, the generation expansion planning of these new Gen reactors is investigated using the WASP software. Iran power grid is selected as a case of study. We present a comparison of the twenty-one year perspective on the future with the development of (1) traditional thermal power plants and Gen II reactors, (2) Gen III + reactors with traditional thermal power plants, (3) Gen IV reactors and traditional thermal power plants, (4) Gen III + reactors and the new generation of the thermal power plant, (5) the new generation of thermal power plants and the Gen IV reactors. The results show that the Gen IV reactors have the most developing among other types of power plants leading to reduce the operating costs and emissions. The obtained results show that the use of new Gen of combined cycle power plant and Gen IV reactors make the emissions and cost to be reduced to 16% and 72% of Gen II NPPs and traditional thermal power plants, respectively.

The development of expansion planning algorithm considering environmental constraints (환경 제약을 고려한 설비계획 방법론 개발)

  • Kim, Yang-Il;Chung, Koo-Hyung;Shin, Hye-Kyeong;Kim, Bal-Ho H.
    • Proceedings of the KIEE Conference
    • /
    • 2006.11a
    • /
    • pp.164-166
    • /
    • 2006
  • Wien Automatic System Planning Package (WASP) which is used to draw out generation expansion planning applies Dynamic Programming in Korea power system panning. While this package has an advantage that computes annual capacity, it has a disadvantage that can't consider environmental constraints. With the effectuation of the Kyoto Protocol in February, 2005, it is expected that CO2 emission has a severe effect on Korean power system. Therefore, as the most important issue, the generation expansion planning considering environmental constraints is rising in power system. This paper develops a mathematic model including not only generation expansion planning but transmission planning and considering regional supply-demand and environmental constraints, especially CO2 emission, and verifies propriety through the case study.

  • PDF

Probabilistic Technique for Power System Transmission Planning Using Cross-Entropy Method (Cross-Entropy를 이용한 전력계통계획의 확률적 기법 연구)

  • Lee, Jae-Hee;Joo, Sung-Kwan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.11
    • /
    • pp.2136-2141
    • /
    • 2009
  • Transmission planning is an important part of power system planning to meet an increasing demand for electricity. The objective of transmission expansion is to minimize operational and construction costs subject to system constraints. There is inherent uncertainty in transmission planning due to errors in forecasted demand and fuel costs. Therefore, transmission planning process is not reliable if the uncertainty is not taken into account. The paper presents a systematic method to find the optimal location and amount of transmission expansion using Cross-Entropy (CE) incorporating uncertainties about future power system conditions. Numerical results are presented to demonstrate the performance of the proposed method.

Reactive Power Planning Using Linear Programming (선형계획법을 이용한 무효전력 설비 계획)

  • 김정부;박영문
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.38 no.10
    • /
    • pp.805-810
    • /
    • 1989
  • This paper presents a method for planning reactive power compensation such as shunt capacitors and reacters so as to maintain bus voltage in acceptable range during steady state operation in power system. The algorithm in this paper decomposes the problem into reactive power planning module for the compensation of bus voltage and load flow module for adjusting the error resulted from the linear approximation. A planning technique is based on linear programming to minimize the amount of added reactive power compensation in each case. Transformer tap settings and generator voltages are adjusted to minimize the compensation. The constraints are the operation limits of the control variables and bus voltages. The result of one sample system is presented to confirm the practical use of the proposed algorithm.

  • PDF

Integrated Optimization of Combined Generation and Transmission Expansion Planning Considering Bus Voltage Limits

  • Kim, Hyoungtae;Kim, Wook
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.4
    • /
    • pp.1202-1209
    • /
    • 2014
  • A novel integrated optimization method is proposed to combine both generation and transmission line expansion problem considering bus voltage limit. Most of the existing researches on the combined generation and transmission expansion planning cannot consider bus voltages and reactive power flow limits because they are mostly based on the DC power flow model. In this paper the AC power flow model and nonlinear constraints related to reactive power are simplified and modified to improve the computation time and convergence. The proposed method has been successfully applied to Garver's six-bus system which is one of the most frequently used small scale sample systems to verify the transmission expansion method.

An Analysis on Price Limits of Imported Power via Northeast Asian Power System Ties

  • Chung, Koo-Hyung;Kim, Balho H.
    • Journal of Electrical Engineering and Technology
    • /
    • v.2 no.3
    • /
    • pp.342-345
    • /
    • 2007
  • This paper presents an engineering approach to derive the optimum price levels of transacted power. In this paper, with the assumption that power import is possible through the system connection in Northeast Asia regions, the upper price limit of imported power deserving economic efficiency was derived with respect to the time and amount of power import. The proposed approach was demonstrated based on the data from the National Power Development Planning in 2004 with the WASP model.

Regional Electricity Planning Using Open Source-Based Optimization Model (오픈 소스 최적화모형을 이용한 지역단위 전력계획)

  • Chung, Yong Joo
    • The Journal of Information Systems
    • /
    • v.28 no.1
    • /
    • pp.133-153
    • /
    • 2019
  • Purpose The purpose of this study is to design a regional electricity planning model rather than the existing single region ones and verify its usefulness. The regional electricity planning model is to determine both electricity distribution among regions and power plant planning at the same time satisfying regional demands and distribution networks. Design/methodology/approach This study made a regional electricity planning model by integrating power plant planning and electricity distribution among regions. The regional electricity planning model is formulated into a linear programming problem, and coded and run using the OSeMOSYS, one of open source energy systems. Findings According to the empirical analysis result, this study confirmed that the regional electricity planning model proposed in this study deducts the unfairness among regions in view of electricity and green house gas. In addition, the model is expected to be used in evaluating and developing the national policies concerning fine dust and/or green house gas.