• Title/Summary/Keyword: Planning and Management

Search Result 6,075, Processing Time 0.033 seconds

A Studyon Implementation of TPBS (Transportation-planning Programming Budgeting System) (교통기획예산제도(TPBS) 도입방안에 관한 연구)

  • 김종민
    • Journal of Korean Society of Transportation
    • /
    • v.13 no.1
    • /
    • pp.153-165
    • /
    • 1995
  • The budget management in Korea is one-year budget system which is just following int he steps of last years budget plan. This system towards traditional item-by-item and restriction-centered budget system. The budget distribution without establishing and considering rational policy goals and directions have brought inefficient resource allocations. In order to promote the implementation of transportation planning, there are some alternatives like introduction of top-down planning system preparing for the provincial self-government era. In this study, the most efficient alternatives to promote the existing management system is referring by foreign countries transportation planning examples(BVWP system in Germany). First of all, mid-long term transportation and budget planning should be established and then make decisions of resource availability and allocation. In order to provide ration budget planning, introduction of Transportation Planning Programming Budget System(TPBS) has been judged as one of the method of unifying the sysematic transportation improvement planning and budgeting. All transporation planning and related activites can not be expressed in quantity and due to the limitation of excessive cost of analyzing transportation planning and ranking priority, here after, the continuous study to minimize the evaluation cost and introduction of TPBS should be done.

  • PDF

Planning the Korea Information Infrastructure : Models and a Case Example (초고속정보통신망 구축을 위한 기획분석 모형의 개발 및 분석)

  • 전용수;장석권
    • Korean Management Science Review
    • /
    • v.19 no.2
    • /
    • pp.91-124
    • /
    • 2002
  • The use of network planning models and tools is essential for effective KII (Korea Information Infrastructure) planning and analysis in that it will significantly reduce the risk and uncertainty embeded in the development and the provision of future broadband services. The purpose of this study is to develop a theoretical framework and a computer tool for modeling the various aspects of the KII topology and architecture and evaluating the techno-economic feasibility of the KII implementation strategy.

A Study on Project Management Scheduling Module Development using the Rule and CBR (규칙(Rule) 과 CBR 기법을 활용한 프로젝트 일정관리 모듈 구현에 관한 연구)

  • Sin, Ho-Gyun;Kim, Yeong-Jun;Jeon, Seung-Ho
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2004.05a
    • /
    • pp.343-354
    • /
    • 2004
  • A Project planning is one of the most important processes that determines success and failure of the project. Scope management for project planning is also essential job in system integration project. However project planning is very difficult because lots of factor and their relationships should be considered. Therefore project planning of SI project has been done by project manager s own knowledge and experiences. It is necessary to develop an algorithm of WBS(Work Breakdown Structure) identification & document selection along to project's specificity in project management system using AI technique. This study also present method (ODW model) to cope with the limitations of the existing study that has uniformly customizing the methodology by only project complexity. We propose PPSM(Project planning support module) that apply Rule for determination of route map and document level, and CBR for WBS identification.

  • PDF

Development of production planning system for shipbuilding using component-based development framework

  • Cho, Sungwon;Lee, Jong Moo;Woo, Jong Hun
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.13 no.1
    • /
    • pp.405-430
    • /
    • 2021
  • Production planning is a key part of production management of manufacturing enterprises. Since computerization began, modern production planning has been developed starting with Material Requirement Planning (MRP), and today Enterprise Resource Planning (ERP), Advanced Planning and Scheduling (APS), Supply Chain Management (SCM) has been spreading and advanced. However, in the shipbuilding field, rather than applying these general-purpose production planning methodologies, in most cases, each shipyard has developed its own production planning system. This is because the applications of general-purpose production planning methods are limited due to the order-taking industry such as shipbuilding with highly complicated construction process consisting of millions of parts per ship. This study introduces the design and development of the production planning system reflecting the production environment of heavy shipyards in Korea. Since Korean shipyards such as Hyundai, Daewoo and Samsung build more than 10 ships per year (50-70 ships in the case of large shipyards), a planning system for the mixed production with complex construction processes is required. This study draws requirements using PI/BPR (process innovation and business process reengineering) methodology to develop a production planning system for shipyards that simultaneously build several ships. Then, CBD software development methodology was applied for the design and implementation of planning system with drawn requirements. It is expected that the systematic development procedure as well as the requirements and functional elements for the development of the shipyard production planning system introduced in this study will be able to present important guidelines in the related research field of shipbuilding management.

Unit Mission Based Mission Planning and Automatic Mission Management for Robots (단위임무 기반 로봇의 임무 계획 및 자동화 임무 관리 방법론)

  • Lee, Ho-Joo;Park, Won-Ik;Kim, Do-Jong
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.17 no.1
    • /
    • pp.1-7
    • /
    • 2014
  • In this paper, it is suggested a method of mission planning and management for robots based on the unit mission. In order to make robots execute given missions continuously as time goes by, a new concept for planning the mission which is composed of one or more unit missions and an automatic mission management scheme are developed. For managing robot's missions in real time, six management methods are devised as well in order to cope with the mismatches, which occur frequently during the mission execution, as to the initial plan. Without the operator's involvement, any mismatch can be adjusted automatically by applying one of the mission management methods. The suggested concept of mission planning and mission management methods based on the unit mission are partially realized in the Dog-Horse robot system and it is checked that it can be a viable one for developing effective robot operation systems.

ACTIVITY-BASED STRATEGIC WORK PLANNING AND CREW MANAGEMENT IN CONSTRUCTION: UTILIZATION OF CREWS WITH MULTIPLE SKILL LEVELS

  • Sungjoo Hwang;Moonseo Park;Hyun-Soo Lee;SangHyun Lee;Hyunsoo Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.359-366
    • /
    • 2013
  • Although many research efforts have been conducted to address the effect of crew members' work skills (e.g., technical and planning skills) on work performance (e.g., work duration and quality) in construction projects, the relationship between skill and performance has generated a great deal of controversy in the field of management (Inkpen and Crossan 1995). This controversy can lead to under- or over-estimations of the overall project schedule, and can make it difficult for project managers to implement appropriate managerial policies for enhancing project performance. To address this issue, the following aspects need to be considered: (a) work performances are determined not only by individual-level work skill but also by the group-level work skill affected by work team members, each member's role, and any working behavior pattern; (b) work planning has significant effects on to what extent work skill enhances performance; and (c) different types of activities in construction require different types of work, skill, and team composition. This research, therefore, develops a system dynamics (SD) model to analyze the effects of both individual-and group-level (i.e., multi-level) skill on performances by utilizing the advantages of SD in capturing a feedback process and state changes, especially in human factors (e.g., attitude, ability, and behavior). The model incorporates: (a) a multi-level skill evolution and relevant behavior development mechanism within a work group; (b) the interaction among work planning, a crew's skill-learning, skill manifestation, and performances; and (c) the different work characteristics of each activity. This model can be utilized to implement appropriate work planning (e.g., work scope and work schedule) and crew management policies (e.g., work team composition and decision of each worker's role) with an awareness of crew's skill and work performance. Understanding the different characteristics of each activity can also support project managers in applying strategic work planning and crew management for a corresponding activity, which may enhance each activity's performance, as well as the overall project performance.

  • PDF

The Optimal Operating Planning of Convention Systems for Service Quality (컨벤션시스템의 서비스 품질제고를 위한 최적운영계획 수립)

  • Kim, Chang-Dae;Moon, Jae-Young
    • Journal of Korean Society for Quality Management
    • /
    • v.36 no.1
    • /
    • pp.40-48
    • /
    • 2008
  • The purpose of this study is to rationally manage service facilities of convention center. This study is to develop the algorithm to consider optimal assignment and optimal operation system planning for convention center. The scheduling algorithm of this study develops through constructing the mathematical model and analyzing the mathematical structure of variables and constraints in model. The scheduling algorithm develops to consist eight stage of optimal operation planning and five stage of optimal assignment planning. Especially, this study indicates that optimum answer through mathematical model and results of algorithm is nondiscrimination.

Using Fuzzy Set Theory in Project Planning Problem

  • Park, Seung-Hun;Chang, In seong
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.20 no.1
    • /
    • pp.131-145
    • /
    • 1995
  • This paper presents a method for solving project planning problem which the opinions of experts greatly disagree in each activity processing time. Triangular fuzzy numbers (TFNs) are used to represent activity times of experts. And we introduce a pessimistic project planning with major TFNs and an optimistic project planning with minor. TFNs, and illustrate the approach using a combination of the existing composite and the comparison methods, which is used to solve the complex project planning problem.

  • PDF

A study on the development on project scope management module using rule and case-based reasoning (규칙과 사례기반추론 기법을 이용한 프로젝트 범위관리 모듈 개발에 관한 연구)

  • Shin, Ho-Kun;Jeon, Sung-Ho;Kim, Chang-Ho
    • The Journal of Information Technology
    • /
    • v.7 no.3
    • /
    • pp.127-137
    • /
    • 2004
  • A Project planning is one of the most important processes that determines success and failure of a project. Scope management for a project planning is also essential job in system integration project. However project planning is very difficult because lots of factors and their relationships should be considered. Therefore project planning of system integration project has been done by project manager's own knowledge and experience. It is necessary to develop an algorithm of WBS(Work Breakdown Structure) identification & document selection along to project's specificity in project management system using AI technique. This study presents a methodology to cope with the limitations of the existing studies that have uniformly been customizing the methodology by only project complexity. We propose PPSM(Project planning support module) based on determination rules regarding route maps and document levels, and CBR(Case-Based Reasoning) for WBS identification.

  • PDF

Design and Implementation of Model Manager for Flexible Supply Network Planning Model (유연한 공급망 계획 모형 작성을 위한 모형관리자의 설계 및 구현)

  • Yang, Young-Chul;Jang, Yang-Ja;Park, Chan-Kwon;Park, Jin-Woo
    • IE interfaces
    • /
    • v.15 no.1
    • /
    • pp.40-48
    • /
    • 2002
  • Recently, in the competitive environments, every company recognizes the importance of supply network planning models. However, there are so many problems in correctly applying mathematical model to the real world. Because mathematical modeling packages charge planning managers with understanding the models and responsibility for generating plans, fast and accurate model cannot be generated with ease. In this paper, we design the model management system that helps planning managers flexibly create and modify mathematical models and manage model versions. We implement the system with model base concept.