Browse > Article

The Optimal Operating Planning of Convention Systems for Service Quality  

Kim, Chang-Dae (Dept. of Management Information Management System, Dongseo University)
Moon, Jae-Young (Dept. of Management Information Management System, Dongseo University)
Publication Information
Abstract
The purpose of this study is to rationally manage service facilities of convention center. This study is to develop the algorithm to consider optimal assignment and optimal operation system planning for convention center. The scheduling algorithm of this study develops through constructing the mathematical model and analyzing the mathematical structure of variables and constraints in model. The scheduling algorithm develops to consist eight stage of optimal operation planning and five stage of optimal assignment planning. Especially, this study indicates that optimum answer through mathematical model and results of algorithm is nondiscrimination.
Keywords
heuristic algorithm; mathematical model of scheduling; service quality;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Drexl, A. and Kimms, A.(1997), "Lot Sizing and Scheduling - Survey and Extension", European Journal of Operational Research, Vol. 110, No. 3, pp. 525-547   DOI   ScienceOn
2 남정태(2007), "서비스사이언스의 진전현황과 IBM의 서비스사이언스 전략," IE 매거진, 14권, 1호, pp. 22-25
3 Baker, K. R.(1995), Elements of Sequencing and Scheduling, Hanover, Baker Press, New Hampshire
4 Belvaux, G. and Wolsey, L.A.(2000), "A Specialized Branch-and-cut System for Lot-Sizing Problems", Management Science, Vol. 46, No. 5, pp. 724-738   DOI   ScienceOn
5 Florian, M., Lenstra, J. K. and Rinnooy Kan, A. H. G.(1980), "Deterministic Production Planning : Algorithms and Complexity," Management Science, Vol. 26, No. 7, pp. 669-679   DOI   ScienceOn
6 Crouch, G. L. and Ritchie, J. R. B.(1998), "Convention Site Selection Research : A Review, Conceptual Model and Propositional Framework", Journal of Convention and Exhibition Management, Vol. 1, No. 1, pp. 50-64
7 Metters, R. and Vicente, V.(1999), "Yield Management for the Nonprofit Sector", Journal of Service Research, Vol. 1, No. 3, pp. 215-226   DOI
8 Abbey, J. R. and Luck, C. K.(1999), The Convention and Meetings Sector: Its Operation and Research Needs, Waterbury Press, Cranbury, New York
9 Montgomery, R. J. and Strick, S. K.(1995), Meetings Conventions and Exposition, An Introduction to the Industry, Kendal/Hunt Publishing
10 Morton and Pentico(1993), Heuristic Scheduling System, John Wile and Sons, New York
11 Fred, L.(2000), Congress, Convention and Exhibition Facilities : Planning, Design and Management, Architectural Press
12 백승익(2007), "서비스사이언스 소개," IE 매거진, 14권, 1호, pp. 10-14
13 정종인, 김진용, 황문우(2006), 우리나라 지식기반서비스업의 현황 및 발전방향, 한국은행 조사보고서
14 Shemwell, D. J. and Cronin, J. J.(1994), "Service Marketing Strategy for Coping with Demand/Supply Imbalance", Journal of Service Marketing, Vol. 8, No. 4, pp. 14-24
15 Bitran, G. R. and Mondshein, S. V.(1995), "An Application of Yield Management to the Hotel Industry Considering Multiple Day Stays", Operations Research, Vol. 43, No. 3, pp. 427-443   DOI   ScienceOn
16 김창대, 주원식(2006), "전시.컨벤션 시설의 합리적 운영을 위한 스케줄링 개발," IE Interface, 19권, 2호, pp. 153-159
17 김광재,민대기,육진범,박정석,이지형,최재경,류경석(2006), "고객 중심의 컨버전스 서비스 컨셉 개발 : 절차 체계 및 통신 컨버전스 서비스 사례 연구", IE Interface, 19권, 2호, pp. 140-152
18 Xie, J. and Dong, J.(2002), "Heuristic Genetic Algorithms for General Capacitated Lot-Sizing Problems", Computers and Mathematics with Applications, Vol. 44, No. 1, pp. 263-276   DOI   ScienceOn