• Title/Summary/Keyword: Planning Costs

Search Result 551, Processing Time 0.031 seconds

Consistency in the Basic Plan on Electricity Demand and Supply and Social Costs (전력수급기본계획의 정합성과 사회적 비용)

  • LEE, Suil
    • KDI Journal of Economic Policy
    • /
    • v.34 no.2
    • /
    • pp.55-93
    • /
    • 2012
  • In Korea, energy policies are actualized through various energy-related plans. Recently, however, as high-ranking plans, which are very vision-oriented, continually set higher sector-by-sector goals, subordinate action plans, which require consistency, encounter distortions in their establishment process. Also, each subordinate action plan reveals limitations in terms of securing flexibility of the plan in responding to uncertainties of the future. These problems pose potential risks such as causing huge social costs. In this regard, with an aim to provide empirical evidence for discussions on improving the procedure for developing and executing Korea's energy plans, this study mainly analyzes the Basic Plan on Electricity Demand and Supply-one of the most important subordinate action plans-in order to explain the problems of the Basic Plan in a logical manner, and potential problems that could occur in the process of sustaining consistency between the Basic Plan and its higher-ranking plans. Further, this paper estimates the scale of social costs caused by those problems assuming realistic conditions. According to the result, in the case of where maximum electric power is estimated to be 7% (15%) less than the actual amount in the Basic Plan on Electricity Demand and Supply, the annual generation cost will rise by 286 billion won and (1.2 trillion won) in 2020. Such social costs are found to occur even when establishing and executing the Basic plan according to the target goal set by its higher-ranking plan, the National Energy Master Plan. In addition, when another higher-ranking GHG reduction master plan requires the electricity sector to reduce emissions by additional 5% in the GHG emissions from the right mix in electricity generation with 'zero' cost of carbon emission, the annual generation cost will rise by approximately 915 billion won in 2020. On the other hand, the analysis finds that since economic feasibility of electric powers in Korea varies significantly depending on their type, Korea is expected to face very small potential social costs caused by uncertainties over the future price of carbon dioxide in the process of establishing the Basic Plan.

  • PDF

Characteristics and Policy Implications of Private Development Parks in Japan (일본 민설공원 제도의 특성과 시사점)

  • Kim, Hyun
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.44 no.1
    • /
    • pp.119-128
    • /
    • 2016
  • Urban park planning has become difficult due to the lack of municipal funds. Thereupon, a special scheme was imposed for city park planning. Since then, a legal amendment was made for economical improvement and more active participation. However, there are a lot of questions about whether it was a suitable direction for parks and where it should be emphasized for public interest. Base on these concerns, this study examined the basis and characteristics of location, creation, and maintenance of private development parks in Japan, which was the policy model of Korean private parks. Location and space planning of private development parks was made up considering an effective green network and disaster prevention function, and a minimum area was about 1.42ha. The minimum area, 1ha, was established on the basis of considering realistic possibilities, disaster protection, and universal validity. It was also amended to consider the standard of type two mid- to high-rise exclusive residential areas and consultation with regional governance. Finally, it was built on the lowest limit of ordinance of the relevant city; for example, 100% of the floor area ratio, 30% of the building coverage ratio, and the maximum height of 11 stories, etc. For maintenance, private and public sectors were working together. Maintenance fees for 35 years (based on $300yen/m^2$ per month) were paid en bloc by the licensee. However, the city was paid for facilities that accompanied excessive maintenance costs. Meanwhile, it seemed difficult to introduce attractive profit facilities because of the limitations in location, usage permission, and introduction equipment; furthermore, there were problems with management authority, and the burden of expenses was deducted. For creating private Korean parks, this study suggested that we should build priority of creating city parks and select appropriate locations first; also, we need to make criteria for location, creation, and standard management rules that are relevant to the whole nation of Korea.

Distal-extension removable partial denture with anterior implant supported fixed prostheses in a maxillary edentulous patient: Case report (상악 완전 무치악 환자에서 임플란트 고정성 보철물을 지대치로 한 후방 연장 국소의치 수복 증례)

  • Gwon, Bora;Jeon, Young-Chan;Jeong, Chang-Mo;Yun, Mi-Jung;Lee, So-Hyoun;Huh, Jung-Bo
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.56 no.4
    • /
    • pp.375-383
    • /
    • 2018
  • Clinicians are faced with many difficulties when planning prosthodontic restorations with implants in a complete edentulous patient. When planning fixed implant prosthetics, it is often necessary to have additional surgery due to highly reduced alveolar bone, as well as high treatment costs and long-term treatment durations can be required. In addition, lack of interocclusal space can be a problem when planning implant supported overdentures. In this study, we planned to place a small number of implants on the anterior maxilla and used them as the abutments for distal-extension removable partial dentures on the posterior side in a maxillary fully edentulous patient. This would reduce the possibility of additional invasive operations such as alveolar bone graft, shorten the treatment time, and be relatively easy for elderly patients to burden. In this case, the patient was provided with a distal-extension removable partial denture and anterior implant fixed prostheses, which was similar to the previous one, and showed good adaptation, and chewing efficiency and esthetics was recovered.

Cost Prediction Models in the Early Stage of the Roadway Planning and Designbased on Limited Available Information (가용정보를 활용한 기획 및 설계초기 단계의 도로 공사비 예측모델)

  • Kwak, Soo-Nam;Kim, Du-Yon;Kim, Byoung-Il;Choi, Seok-Jin;Han, Seung-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.87-100
    • /
    • 2009
  • The quality of early cost estimates is critical to the feasibility analysis and budget allocation decisions for public capital projects. Various researches have been attempted to develop cost prediction models in the early stage of a construction project. However, existing studies are limited on its applicability to actual projects because they focus primarily on a specific phase as well as utilize restricted information while the amount of information collectable differs from one another along with the project stages. This research aims to develop two-staged cost estimation model for the schematic planning and preliminary design process of a construction projects, considering the available information of each phase. In the schematic planning stage where outlined information of a project is only available, the Case-Based Reasoning model is used for easy and rapid elicitation of a project cost based on the extensive database of more than 90 actual highway construction projects. Then, the representing quantity-based model is proposed for the preliminary design stage where more information on the quantities and unit costs are collectable based on the alternative routes and cross-sections of a highway project. Real case studies are used to demonstrate and validate the benefits of the proposed approach. Through the two-stage cost estimation system, users are able to hold a timely prospect to presume the final cost within the budge such that feasibility study as well as budget allocation decisions are made on effectively and competitively.

An SAO-based Text Mining Approach for Technology Roadmapping Using Patent Information (기술로드맵핑을 위한 특허정보의 SAO기반 텍스트 마이닝 접근 방법)

  • Choi, Sung-Chul;Kim, Hong-Bin;Yoon, Jang-Hyeok
    • Journal of Technology Innovation
    • /
    • v.20 no.1
    • /
    • pp.199-234
    • /
    • 2012
  • Technology roadmaps (TRMs) are considered to be the essential tool for strategic technology planning and management. Recently, rapidly evolving technological trends and severe technological competition are making TRM more important than ever before. That is because TRM plays a role of "map" that align organizational objectives with their relevant technologies. However, constructing and managing TRMs are costly and time-consuming because they rely on the qualitative and intuitive knowledge of human experts. Therefore, enhancing the productivity of developing TRMs is one of the major concerns in technology planning. In this regard, this paper proposes a technology roadmapping approach based on function of which concept includes objectives, structures and effects of a technology and which are represented as Subject-Action-Object structures extractable by exploiting natural language processing of patent text. We expect that the proposed method will broaden experts' technological horizons in the technology planning process and will help to construct TRMs efficiently with the reduced time and costs.

  • PDF

Cost-Benefit Analysis of The National Land Census Project and Its Policy Implications (국토센서스 사업의 비용 및 편익분석과 시사점)

  • Lee, Young-Sung;Kim, Kab-Sung;Lee, Choon-Won;Kwon, Dae-Jung;Yu, Hyeon-Ji;Yun, Hyung-Seok;Kim, Jin
    • Journal of Cadastre & Land InformatiX
    • /
    • v.49 no.2
    • /
    • pp.23-38
    • /
    • 2019
  • The National Land Census Project aims to survey the national land regularly to resolve the land category disagreement and reflect the actual land use. The objective of this study is to investigate whether not only the National Land Census Project but also related land and housing surveys bring about the improvement of social welfare in light of the invested budget, and to measure the project feasibility. The potential benefit after the National Land Census Project is not traded in the market. To determine the economic value of this potential benefit, the Contingent Valuation Method was used. This study utilized the single-bounded and double-bounded dichotomous choice models simultaneously to estimate the project feasibility of the cadastral system improvement. According to this study, cost-benefit ratio of the project was estimated larger than 1, which means that social benefits are larger than social costs.

Optimal Supply Calculation of Electric Vehicle Slow Chargers Considering Charging Demand Based on Driving Distance (주행거리 기반 충전 수요를 고려한 전기자동차 완속 충전기 최적 공급량 산출)

  • Gimin Roh;Sujae Kim;Sangho Choo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.23 no.2
    • /
    • pp.142-156
    • /
    • 2024
  • The transition to electric vehicles is a crucial step toward achieving carbon neutrality in the transportation sector. Adequate charging infrastructure at residential locations is essential. In South Korea, the predominant form of housing is multifamily dwellings, necessitating the provision of public charging stations for numerous residents. Although the government mandates the availability of charging facilities and designated parking areas for electric vehicles, it bases the supply of charging stations solely on the number of parking spaces. Slow chargers, mainly 3.5kW charging outlets and 7kW slow chargers, are commonly used. While the former is advantageous for installation and use, its slower charging speed necessitates the coexistence of both types of chargers. This study presents an optimization model that allocates chargers capable of meeting charging demands based on daily driving distances. Furthermore, using the metaheuristic algorithm Tabu Search, this model satisfies the optimization requirements and minimizes the costs associated with charger supply and usage. To conduct a case study, data from personal travel surveys were used to estimate the driving distances, and a hypothetical charging scenario and environment were set up to determine the optimal supply of 22 units of 3.5kW charging outlets for the charging demands of 100 BEVs.

The Role of New Information and Communication Technologies in the Internationalization of Firms: A Case Study of Haier (기업의 국제화와 신 정보통신기술의 역할: 중국 Haier 기업을 사례로)

  • Liu, Shuguang;Liu, Weidong
    • Journal of the Korean Geographical Society
    • /
    • v.38 no.3
    • /
    • pp.400-412
    • /
    • 2003
  • It is now widely recognized that new Information and Communication Technologies (ICTs) have been changing the way tv which firms conduct their businesses. Examples are the application of enterprise resources planning (ERP) and business process reengineering (BPR) to increase the efficiency of internal resources management, adoption of Business-to-Business e-commerce (B2B e-com) to integrate supply chain, and invention of new marketing channels such as Business-to-Customer (B2C) e-com. These new ways of conducting businesses are believed to help firms to reduce transaction costs and increase productivity. As a result, new ICTs have played an important role in recent growth of many small firms into multi-functional and multi-product corporations and in their spatial expansion towards internationalization as well. This paper takes Haier in China as a case to study the role of new ICTs in the growth of firms and reveal how the new technologies have facilitated the expansion of Haier into a transnational corporation (TNC) by examining the internationalization process of the firm in relation to its adoption of new ICTs in the period from 1990 to 2002. The study reveals that the adoption of new Ins has helped Haier to integrate its functional units located in dozens of places across the world, which is essential to the internationalization of a firm, and to link closely together its worldwide suppliers and customers to achieve just-in-time (JIT) production and delivery. As such, the authors of the paper argue that, without the facilitation of new ICTS, Haier could not have developed into a TNC in less than ten years.It is now widely recognized that new Information and Communication Technologies (ICTs) have been changing the way tv which firms conduct their businesses. Examples are the application of enterprise resources planning (ERP) and business process reengineering (BPR) to increase the efficiency of internal resources management, adoption of Business-to-Business e-commerce (B2B e-com) to integrate supply chain, and invention of new marketing channels such as Business-to-Customer (B2C) e-com. These new ways of conducting businesses are believed to help firms to reduce transaction costs and increase productivity. As a result, new ICTs have played an important role in recent growth of many small firms into multi-functional and multi-product corporations and in their spatial expansion towards internationalization as well. This paper takes Haier in China as a case to study the role of new ICTs in the growth of firms and reveal how the new technologies have facilitated the expansion of Haier into a transnational corporation (TNC) by examining the internationalization process of the firm in relation to its adoption of new ICTs in the period from 1990 to 2002. The study reveals that the adoption of new Ins has helped Haier to integrate its functional units located in dozens of places across the world, which is essential to the internationalization of a firm, and to link closely together its worldwide suppliers and customers to achieve just-in-time (JIT) production and delivery. As such, the authors of the paper argue that, without the facilitation of new ICTS, Haier could not have developed into a TNC in less than ten years.

National hospital discharge survey for the hospitals with fewer than 100 beds: A pilot project and evaluation (100병상미만 의료기관대상 퇴원환자조사 시범운영 및 평가)

  • Choi, Haeng-Jeong;Kim, Kwang-Hwan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.9
    • /
    • pp.3336-3340
    • /
    • 2010
  • This study has been carried out against hospitals with less than 100 beds, which were excluded from the previous study on the discharged patients from January 1 to December 31, 2007. To analyze the discharged patients, the general characteristics of discharged patients, means of payment for medical costs, type of disease and surgery and current status of the use of medical services have been investigated based on the medical records. During the year of 2007, the number of discharged patients from the hospitals with less than 100 beds reached 4,697,095 (9.7% of total population). In other words, 9,693 people were discharged from a hospital per 100,000 populations with 9.8 days in terms of annual mean length of hospitalization. The number of patients who returned home after hospitalization reached 4,538,861 (male: 1,784,041, female: 2,754,821) while 119,378 patients were evacuated to other hospitals. Among them, 8,970 patients were returned back to the original hospital. Based on the results of this study, they could be used in could be used in planning a project which is aimed to reduce public health costs by investigating high-risk groups with particular injuries and preventing damage. In addition, the injury monitoring data which are continuously collected could be useful in monitoring and evaluating the efficiency of an injury prevention program.

An Analysis on the Effects of Demand Response in Electricity Markets (수요반응자원의 전력시장 도입효과 분석)

  • Yoo, Young-Gon;Song, Byung-Gun;Kang, Seung-Jin
    • Environmental and Resource Economics Review
    • /
    • v.16 no.1
    • /
    • pp.99-127
    • /
    • 2007
  • When the margin between available capacity and demand is thin in a liberalized electricity market, prices rise steeply and system reliability is threatened. The principal response to these circumstances is often an assumption that price spikes and electricity shortages are the result of a failure to build sufficient new supplying facilities. It is, of course, often the case that additional investments in generation and network facilities would improve reliability, and such investments are often needed. But focusing on additional generation and transmission facilities for restoring balance to the grid overlooks the essential fact that reliability is a function of the relationship between supply and demand, imposing unnecessary costs on electric system. When the relationship is out of balance, the search for solutions must consider not only investments supply-side resources but also cost-effective demand-side resources such as accelerated load management, efficiency measures, and price-responsive load programs. Integrating demand resources into electricity markets can add enormous value to the electric system, widening the capacity margin, lowering costs and enhancing system reliability at the same time. This paper studies several challenges now facing electricity markets: demand-side management-especially, economic effects of demand response, potential reliability problems, market and system operation, CBP market improvements and so on. The paper concludes with a series of policy recommendations in five areas: (i) The Effects of efficient improvement to incorporate demand responses and demand-side resources into modem electricity markets, (ii) Fosteing price based demand response and (iii) improving incentive based demand response, (iv) strengthen demand response analysis and valuation, (v) integrating demand response into resource planning and adopting enabling technologies.

  • PDF