• Title/Summary/Keyword: Piping Material

Search Result 222, Processing Time 0.028 seconds

Design of type 316L stainless steel 700 ℃ high-temperature piping

  • Hyeong-Yeon Lee;Hyeonil Kim;Jaehyuk Eoh
    • Nuclear Engineering and Technology
    • /
    • v.55 no.10
    • /
    • pp.3581-3590
    • /
    • 2023
  • High-temperature design evaluations were conducted on Type 316L stainless steel piping for a 700 ℃ large-capacity thermal energy storage verification test loop (TESET) under construction at KAERI. The hot leg piping with sodium coolant at 700 ℃ connects the main components of the loop heater, hot storage tank, and air-to-sodium heat exchanger. Currently, the design rules of ASME B31.1 and RCC-MRx provide design procedures for high-temperature piping in the creep range for Type 316L stainless steel. However, the design material properties around 700 ℃ are not available in those rules. Therefore, a number of material tests, including creep tests at various temperatures, were conducted to determine the insufficient material properties and relevant design coefficients so that high-temperature design on the 700 ℃ piping may be possible. It was shown that Type 316L stainless steel can be used in a 700 ℃ high-temperature piping system of Generation IV reactor systems or a renewable energy systems, such as thermal energy storage systems, for a limited operation time.

Improvement of the Code Classification Structure in Piping Material Management for Petrochemical Plant Projects (석유화학 플랜트의 효율적 배관자재 관리를 위한 코드분류체계 개선)

  • Lee, Jong-Pill;Moon, Yoon-Jae;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.11 no.1
    • /
    • pp.39-49
    • /
    • 2015
  • The objective of this study is to improve the classification structure of commodity code for piping material management which is considered as the fundamental of commodity code and piping material management system. It enhances the efficiency of piping material management directly or indirectly affecting the engineering, procurement and construction in a petrochemical plant projects. To establish an improved code classification structure, this study identifies the problems of former code classification structure in details, as well as the characteristics of other domestic and global EPC company's code classification structures and presents the improved direction considering the recently mega-sized and specialized projects. Accordingly, to efficiently enhance piping material management, the improved code classification structures have been derived from defining suitable code classification structure for specific piping component, adding more standard attribute, expanding the number of code digits and classifying code hierarchy. The results of applying the improved classification structure of commodity code to on-going project have led to reduce the rate of rework from 4.98% to 2.48% for developing purchase description and also have saved working time for executing piping design by 3D modeling from 6 months by two persons to 4 months by a person which is decreased 67% consequently. In addition, the structures of pyramid code management have resulted to accumulation and analysis of the various piping data for other disciplines such as procurement and estimation team which require commodity code information through the company's material control system.

  • PDF

A Study on Seismic Design Method Considering Physical Properties of Piping Material (배관 재료의 물성을 고려한 내진설계 방법에 관한 연구)

  • Bang, Dae-Suk;Lee, Jae-Ou
    • Fire Science and Engineering
    • /
    • v.32 no.2
    • /
    • pp.38-47
    • /
    • 2018
  • In this study, we compare the engineering seismic design method considering the physical properties of piping materials and the specification-oriented design method according to the seismic design standards of fire fighting equipment. In the case of the seismic design method considering the physical properties of piping materials, the safety of the piping will be analyzed through the combined value of the torsional stress and the bending stress generated in the piping. However, in the case of the design-centered design method, instead of the safety of the piping material, it calculates the moving force of the pipe and interprets whether or not the shaking prevention strut can bear. Fire extinguishing equipment piping is possible through safety analysis of stress and displacement of piping material because piping safety can not be secured via unstable force generated in a certain section with one connected structure is there. Therefore, it is necessary to apply analytical method considering seismic performance of building structure and material properties of piping for seismic design of safe fire extinguishing system piping.

Calculation of the Attached-Piping-Material Rate for the Building Mechanical-Service System in Office Buildings (사무소 건축물의 건축기계설비 배관 부속자재 요율 산출)

  • Park, Yool
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.29 no.4
    • /
    • pp.185-194
    • /
    • 2017
  • Currently, in comparison with other architectural estimations, the estimation work regarding building mechanical-service systems is time-consuming, and the process is continuously becoming more difficult because of the increased usage of the attached piping materials such as fittings and hangings in addition to their complicated construction processes. To improve this problem, the Korean authority provides a simple estimation method for the attached-material rate regarding the main piping material, which is the most time-consuming work in the architectural-mechanical estimation. However, to be an applicable method on construction sites, a proper conversion rate of the attached-piping material is still required for the proposed method regarding building usage and working types. Therefore, the purpose of this research is the calculation of the rate of the attached-piping materials such as the fittings and supports through the building of the mechanical-service work types of mechanical rooms, air conditioning, domestic water and hot-water supplies, and the drain-, vent-, and gas-piping work in office buildings that have been designed after 2010.

Estimation of Material Requirement of Piping Materials in an Offshore Structure using Big Data Analysis (빅데이터 분석을 이용한 해양 구조물 배관 자재의 소요량 예측)

  • Oh, Min-Jae;Roh, Myung-Il;Park, Sung-Woo;Kim, Seong-Hoon
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.55 no.3
    • /
    • pp.243-251
    • /
    • 2018
  • In the shipyard, a lot of data is generated, stored, and managed during design, construction, and operation phases to build ships and offshore structures. However, it is difficult to handle such big data efficiently using existing data-handling technologies. As the big data technology is developed, the ship and offshore industries start to focus on the existing big data to find valuable information from it. In this paper, the material requirement estimation method of offshore structure piping materials using big data analysis is proposed. A big data platform for the data analysis in the shipyard is introduced and it is applied to the analysis of material requirement estimation to solve the problems in piping design by a designer. The regression model is developed from the big data of piping materials and verified using the existing data. This analysis can help a piping designer to estimate the exact amount of material requirement and schedule the purchase time.

Suggestion of the Attached Piping Material Rate for the Mechanical Fire Protection Facilities in Office Buildings (업무용 건축물의 기계소방시설 배관 부속자재 요율 제시)

  • Park, Lyool;Park, Kyung-Soon;Yoon, Hang-Mook
    • Journal of the Regional Association of Architectural Institute of Korea
    • /
    • v.20 no.6
    • /
    • pp.1-8
    • /
    • 2018
  • In generally, the estimation work regarding building mechanical service system in comparison with other architectural estimations is time-consuming, and the process is continuously getting more difficult because of the increased usage of the attached piping materials such as fittings and supports in addition to their complicated construction processes. In order to improve this problem, the Korean authority provides a simple method to estimate the attached material rate regarding the main piping material, which is the most time-consuming work in the architectural mechanical estimation. However, to be an applicable method on construction site, a proper conversion rate of the attached piping material is still required for the proposed method regarding building usage and working types. Therefore, the purpose of this research is the suggestion of the material and labor cost rate of the attached piping materials such as the fittings and supports by work types and fitting methods of indoor fire, sprinkler, and extinguishing gas piping work of mechanical fire protection facilities in office buildings that have been designed after 2010.

Experiment on Piping in Pervious Foundation (투수성(透水性) 기초지반(基礎地盤)의 Piping에 관(關)한 실험(實驗))

  • Kwon, Moo Nam;Lee, Sang Ho
    • Current Research on Agriculture and Life Sciences
    • /
    • v.3
    • /
    • pp.44-54
    • /
    • 1985
  • In order to determine the critical head values of boiling and piping, several experiments were performed for 3 cases of model dykes on 7 kinds of pervious foundations. The results obtained are as follows : 1. It appears that the coarser and the denser the foundation material, the higher the critical heads of boiling and piping, and that the lower the permeability of the foundation, the higher the critical heads of boiling and piping. 2. A difference in head between the moments of boiling and piping is greater in the case 2 or case 3 than in the case 1 because of the additional hydraulic resistance. And it is found that the coarser the foundation material, the greater the head difference. 3. The critical heads of boiling and piping is directly prortional to the seepage length. 4. The piezometric heads close to the singular point are of the same magnitude, provided that the geometry of the model dyke and foundation material are the same. 5. Variations of the weight of model dyke can not affect the critical head. According to the conclusions shown above, the critical head of piping can be more practically predicted for prototype using the results from laboratory tests on scale model.

  • PDF

Big data-based piping material analysis framework in offshore structure for contract design

  • Oh, Min-Jae;Roh, Myung-Il;Park, Sung-Woo;Chun, Do-Hyun;Myung, Sehyun
    • Ocean Systems Engineering
    • /
    • v.9 no.1
    • /
    • pp.79-95
    • /
    • 2019
  • The material analysis of an offshore structure is generally conducted in the contract design phase for the price quotation of a new offshore project. This analysis is conducted manually by an engineer, which is time-consuming and can lead to inaccurate results, because the data size from previous projects is too large, and there are so many materials to consider. In this study, the piping materials in an offshore structure are analyzed for contract design using a big data framework. The big data technologies used include HDFS (Hadoop Distributed File System) for data saving, Hive and HBase for the database to handle the saved data, Spark and Kylin for data processing, and Zeppelin for user interface and visualization. The analyzed results show that the proposed big data framework can reduce the efforts put toward contract design in the estimation of the piping material cost.

A Study on Process Management Method of Offshore Plant Piping Material (해양플랜트 배관재 공정관리 방법에 관한 연구)

  • Park, JungGoo;Woo, JongHun
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.55 no.2
    • /
    • pp.124-135
    • /
    • 2018
  • In order to secure manufacturing competitiveness of offshore plants, piping process is one of the most important processes. This study is about the design of management system for piping materials manufacturing of the offshore plant. As a result of the study, we analyzed the system and algorithms needed for the processing of piping material products and designed the structure of the entire management system. We conducted a process analysis of the design, manufacturing and installation processes. And also we proposed a system structure to improve the various problems that have come out. We also proposed an algorithm to determine the delivery order of the pipe spools, and proposed a raw material management system for the manufacturing of the pipe spools. And we designed a manufacturing process management system to manage the risk of pipe materials delivery. And finally we proposed a data structure for the installation process management system. The data structures and algorithms were actually implemented, and applied the actual process data to verify the effect of the system.

Effect of Side Groove on the Elastic Plastic Fracture Toughness of Gas Piping Material (가스배관재의 탄소성파괴인성에 미치는 측면홈 영향)

  • 임만배;차귀준;윤한기;공유식;김정호
    • Journal of Ocean Engineering and Technology
    • /
    • v.15 no.3
    • /
    • pp.63-68
    • /
    • 2001
  • SG-365 steel is an important material and used for manufacturing a pressure vessel which the gas piping. In this investigation, the elastic plastic fracture toughness of this material is evaluated by the an unloading compliance method according to the ATM E813-97 method on the smooth and side groove 1CT specimens. The effect of smooth and side groove is studied on the elastic plastic fracture toughness. The side grooved specimen is very useful in estimation of the $J_IC. Because it is much easier than the smooth specimen to the onset of the ductile tearing by the R curve method. Besides, it improves the accuracy of toughness values, decreases the scattering of them and tunneling and shear lip by the side groove.

  • PDF