• Title/Summary/Keyword: Pilot scale system

Search Result 358, Processing Time 0.023 seconds

A Semi-Pilot Test of Bio-barrier for the Removal of Nitrate in Bank Filtrate (강변여과수의 질산성질소 제거를 위한 생물학적 반응벽체의 준파일럿 실험에 관한 연구)

  • Moon, Hee-Sun;Chang, Sun-Woo;Nam, Kyoung-Phile;Kim, Jae-Young
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.27 no.3
    • /
    • pp.302-308
    • /
    • 2005
  • Nitrate is one of common contaminants frequently found in the bank filtrate. Biological autotrophic denitrification into permeable reactive barrier(PRB) system to reduce nitrate concentration in bank filtrate was implanted. The objectives of research are to investigate effect of inoculation, to evaluate alternative alkalinity sources, and to determine effect of hydraulic characteristics, such as retention time, flow rate on the performance of semi-pilot PRB system. Semi-pilot scale biological PRB system was installed using elemental sulfur and limestone/oyster shell as reactive materials near Nakdong River in Kyoungnam province, Korea. Nitrate concentration in bank filtrate was reduced by indigenous microorganisms in oyster shell as welt as by inoculating microorganisms isolated from the sludge of an anaerobic digester in a wastewater treatment plant. Oyster shell as well as limestone can be used as an alkalinity source. However, oyster shell resulted in suspended solids of effluent. As the flow rate in the system increased from 66 to 132 mL/min and accordingly the residence time decreased from 15 to 7.5 hours, nitrate concentration in effluent increased and nitrate removal efficiencies decreased from 75 to 58% at the fixed thickness of 80 cm of PRB.

Comparition of Submerged / Pressurized Type Membrane System by DRF and Long-Term Results in MF Drinking Water Treatment (MF막여과 정수처리에서 장기운전 결과 및 DRF를 이용한 침지식 / 가압식 시스템의 비교 평가)

  • Ha, Keum Ryul;Kim, Kwan Yeop;Kim, Hyo-Sang;Lee, Yong Soo;Song, June Sup;Kim, Chung Hwan;Yeom, Ick Tae;Lee, Yong Hoon;Kim, Hyung Soo
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.22 no.1
    • /
    • pp.79-86
    • /
    • 2008
  • In Korea, most of the drinking water treatment relied upon the availability of the surface water, of which the raw water quality varied significantly by season and location. Therefore, the comparison of two operation modes (Pressurized type and Submerged type membrane system) must be estimated before the long-term establishment of two systems. In this study, two pilot-scale microfiltration systems with the capacity of $50m^3/day$ were installed and operated in two different modes, and the applicability of the system was determined based on the results such as the TMP (Trans-Membrane Pressure) and flux. For quantitatively comparing the two systems, a new concept, DRF (Differential Resistance Fraction) was introduced. The accumulated sum of the permeate after each cycle of chemical cleaning was also used as a tool for the system comparison.

The Design Conditions and the Initial Operation Results of 1 Ton/Day Class Dry Feeding Coal-Gasification System (건식 석탄공급형 1 Ton/Day급 가스화시스템 설계조건 및 시운전결과)

  • Seo, Hai-Kyung;Chung, Jae-Hwa;Ju, Ji-Sun
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.20 no.4
    • /
    • pp.352-359
    • /
    • 2009
  • KEPRI is developing a Korean type coal-gasification system and the scale is 20 ton/day. Prior to this pilot plant, a 1 ton/day class gasification system will be used for pre-testing of several coal types. This paper introduces the configuration and design conditions of this 1 ton/day class system, presenting the gas/coal ratio, oxygen/coal ratio, cold gas efficiency, CFD analysis of gasifier, and others. The existing combustion furnace for residual oil was retrofitted as a coal gasifier and a vertical and down-flow type burner was manufactured. Ash removal is carried out through a water quencher and a scrubber following the quencher, and the sulfur is removed by adsorption in the activated carbon tower. The gas produced from the gasifier is burned at the flare stack. In this paper, the results of design conditions and initial operation conditions of I ton/day gasification system are compared together.

An experimental study on screw conveyor system of EPB shield TBM (EPB Shield TBM의 스크루 컨베이어 시스템에 관한 실험적 연구)

  • Kim, Sang-Hwan;Kim, Jin-Dae;Park, Inn-Joon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.6
    • /
    • pp.519-530
    • /
    • 2011
  • The screw conveyor system installed in EPB Shield TBM chamber was manufactured in small scale for pilot test to investigate the tunnel muck hauling system that could control the earth pressure and support face thrust force. In this experimental study, there were three different test conditions that include screw angles, screw pitch, and screw RPM. Through analysis on test results based on the muck hauling amount per unit time from screw conveyor, the optimum conditions of screw conveyor were proposed to be efficiently performed by the muck processing system. Finally, this study provided the meaningful results such as optimum screw angle, screw RPM, and screw pitch for anti-reverse flow of muck hauling.

Cost Analysis of Electrokinetic Process for Desalination of Saline Agricultural Land (염류집적 농경지 탈염을 위한 전기역학적 처리공정의 비용산출)

  • Kim, Do-Hyung;Choi, Jeong-Hee;Jo, Sung-Ung;Baek, Ki-Tae
    • Journal of Soil and Groundwater Environment
    • /
    • v.17 no.4
    • /
    • pp.91-97
    • /
    • 2012
  • In this study, cost analysis of electrokinetic (EK) restoration process for desalination of saline agricultural land was performed for field application based on a pilot scale field application. For reasonable cost analysis, EK process was classified into three major parts: system design, installation and operation. Cost of system installation consists of materials and installation for electrode/electric wire, power supply and data monitoring, drainage system, etc. Operation cost was calculated based on electrical consumption and water charges for EK process. Total cost for EK process was 2,943,013 won for $1000m^2$ in greenhouse area. Cost for system installation was 2,553,786 won, that is, 87% of total cost, while cost for system operation was 389,229 won, that is, 13% of total cost.

Determination of Boil-Off gas Ratio for the Design of Underground LNG Storage System in Rock Cavern (암반동굴식 지하 LNG 저장 시스템 설계를 위한 기화율의 산정)

  • Chung, So-Keul;Lee, Hee-Suk;Jeong, Woo-Cheol;Park, Eui-Seob
    • Tunnel and Underground Space
    • /
    • v.17 no.1 s.66
    • /
    • pp.56-65
    • /
    • 2007
  • A new underground LNG storage concept in the rock mass has been developed by combining underground cavern construction and new ice-ring harrier technologies with the conventional cryogenic insulation system. Technical feasibility of the storage system has been verified through construction and operation of the pilot storage cavern and a full-scale project is expected to start in the near future. One of the most important issues in the LNG storage system is the operational efficiency of the storage to minimize heat loss during a long period of operation due to the cryogenic heat transfer. This paper presents several important results of heat transfer and coupled hydro-thermal analyses by a finite element code Temp/W and Seep/W. A series of heat transfer analyses for full-scale caverns were performed to determine design parameters such as boil-off gas ratio (BOR), insulation thickness and pillar width. The result of the coupled hydro-mechanical analysis showed that BOR for underground storage system remains at about 0.04 %/day during the early stage of the operation. This value could be even much lower when the discontinuities in the rock masses are taken into consideration.

A study on the improvement of cleaning performance in bag-filter (여과집진기의 탈진 거동 개선에 관한 연구)

  • Hong, Sung-Gil;Kum, Young-Ho;Shon, Byung-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.2
    • /
    • pp.1571-1578
    • /
    • 2015
  • The cleaning characteristics of pulse air jet type cleaning system which is widely applied in the industries were identified by utilizing the computational fluid dynamics (CFD) and the cleaning performance in modified shape of dedusting unit was compared in this study. The review on each shape of cleaning part showed that the case of installing the nozzle on the blow tube (Case-3) and the case of installing the double intaking tube to the venturi (Case-4 and Case-5) were more excellent than the structure (Case-1). Also, the optimal venturi shape was designed and examined its applicability to the site in a pilot scale plant. A combined system of a blow tube and a venturi proposed by this study turned out to be very effective for concentrating an cleaning air compared to existing systems, such as using only blow tube and combines the blow tube and venturi. In addition, as a result of installing and testing a venturi proposed by this study, the cleaning frequency and cleaning time were much improved compared to a case of using a commercial venturi that is under use at the industrial sites.

Logistical Simulation for On-site Concrete Waste Management in Decommissioning

  • Lee, Eui-Taek;Kessel, David S.;Kim, Chang-Lak
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.17 no.4
    • /
    • pp.389-403
    • /
    • 2019
  • Large amounts of concrete waste are likely to arise from the decommissioning of a Kori-1 nuclear power plant. Several studies have been conducted on decommissioning concrete waste in recent decades, however, they have been limited to contaminated concrete issues or were small pilot-scale experiments. This study constructed two industrial-scale models of on-site concrete waste management for clean as well as contaminated concrete. To evaluate the performance of both the models, simulations were conducted using the Flexsim software. The concrete particle size distribution of Kori-1 and concrete processor properties based on widely used construction equipment were used as sources of input data for the simulations. It was observed that it may take over two years to complete the on-site concrete management processes owing to the performance of existing processors. In addition, it was demonstrated that it is essential to identify bottlenecks in the system and enhance the performance of the relevant processors to avoid delays of the decommissioning schedule. Our results suggest that this novel approach can contribute to developing schedules or expediting delayed activities in the Kori-1 decommissioning project.

Development of a Thermal Model for Discharge Behavior of MH Hydrogen Storage Vessels (MH 수소저장 장치의 방출시 열거동 모사 수치 모델 개발)

  • O, Sang-Kun;Cho, Sung-Wook;Yi, Kyung-Woo
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.22 no.2
    • /
    • pp.178-183
    • /
    • 2011
  • Metal hydride alloys are a promising type of material in hydrogen storage applications, allowing for low-pressure, high-density storage. However, while many studies are being performed on enhancing the hydrogen storage properties of such alloys, there has been little research on large-scale storage vessels which make use of the alloys. In particular, large-scale, high-density storage devices must make allowances for the inevitable generation or absorption of heat during use, which may negatively impact functioning properties of the alloys. In this study, we develop a numerical model of the discharge properties of a high-density MH hydrogen storage device. Discharge behavior for a pilot system is observed in terms of temperature and hydrogen flow rates. These results are then used to build a numerical model and verify its calculated predictions. The proposed model may be applied to scaled-up applications of the device, as well as for analyses to enhance future device designs.

Performance Characteristics and Efficiencies of Micro-Hydro Pelton Turbine with Nozzle Diameter Variation (노즐 구경에 따른 초소수력 펠턴 터빈의 효율 및 성능 특성)

  • Jo, In Chan;Park, Joo Hoon;Shin, Youhwan;Kim, Kwang Ho;Chung, Jin Taek;Kim, Dong Ik
    • The KSFM Journal of Fluid Machinery
    • /
    • v.18 no.3
    • /
    • pp.60-65
    • /
    • 2015
  • This paper deals with performance characteristics and efficiencies of Pelton turbine can be applied as one of ERDs (Energy Recovery Devices) of PRO (Pressure Retarded Osmosis) system for desalination. The objective of this study is experimentally estimating the performance of micro-scale Pelton turbine for PRO pilot plant. Especially the performance characteristics with variations of jet nozzle diameter of Pelton turbine are discussed in detail. In order to do this, lab scale test rig of Pelton turbine was made for performance test, which includes water tank, Pelton wheel with buckets, jet nozzle and torque brake and so on. The parameter effects related on Pelton turbine's efficiency were investigated and discussed on the influence of the variations of load and speed ratio.