Building Information Modeling, which was applied mainly in the construction sector, is expanding to the road sector, and the government recently recommends preparing individual application guidelines considering the characteristics of detailed fields such as railways, ports, and complexes through BIM implementation guidelines. Compared to general construction projects, a lot of the works such as signals, electricity, and power, and the railway BIM 2030 roadmap has been presented to apply BIM to railway construction projects that require business consultation and work environment review with various local governments, and pilot projects are in operation. Unlike a general building, in which the construction begins after the detailed design is completed, in the railway project, the detailed design of other works proceeds along with the roadbed construction. Because construction and design work together, railways need to coordinate detailed engineering interfaces such as trajectories, signals, and power, and the application of BIM in design interface coordination has the advantage of maximizing the effectiveness of pre-review. Overseas railway construction projects actively used BIM to adjust design interfaces and had a collaboration process to modify BIM models and create construction details from the revised models through regular meetings with suppliers. Therefore, this study aims to derive the factors necessary for establishing a BIM collaboration environment based on a survey of practitioners as a preliminary step for establishing the BIM collaboration process of the railway construction project.
Kim, Inchie;Chin, Sangyoon;Kim, Seongah;Kim, Yeasang;Lee, Sangjun;Park, Soohun
Korean Journal of Construction Engineering and Management
/
v.19
no.4
/
pp.3-11
/
2018
The Construction Workers Mutual Aid Association is carrying out a number of strategic tasks with the goal of "contributing to improving employment and stabilizing the return of workers to construction workers through employment welfare and retirement deduction services." One of them is the retirement deduction system. The retirement allowance system is a system for the retirement income and livelihood security of construction workers who are not adequately protected by the Labor Standards Act, such as retirement allowances due to the nature of day labor. The Construction Workers Mutual Aid Association has promoted the introduction of electronic manpower management. For the efficient management of the pilot sites and the plans for the future, comprehensive evaluation of the pilot sites as well as the evaluation of the status and operation results of each pilot project site are needed. Therefore, in this study, we will develop performance indicators to evaluate the current state of electronic manpower pilot projects and analyze the actual situation of pilot project sites through actual application, and try to derive future implementation strategies.
Journal of the Korean Institute of Rural Architecture
/
v.17
no.1
/
pp.121-128
/
2015
The elderly rate in South Korea in 2013 is over 12%. Especially, the elderly rate in rural area is 36%, i.e., in rural area, one of three is people aged 65 and over. Senior community project in rural that is being promoted by the government. This project is to improve the quality of life health and welfare services for the elderly in rural Area. This paper investigates cases used as living space by interview and remodeling senior centers (village community center) for the elders living alone in rural areas. In Gimje two the nation's first senior centers were remodeled in 2006 (for both the village community center) and were begun to use these as group homes. Evaluation was a success. Since then, these were increased by approximately 20 centers per year by year and are currently 108 centers at the end of 2011. In Chungcheongnam-do, a pilot project has been begun for communal living by remodeling the senior center (for both the village community center) and elderly housing. Municipalities are similar in their business (is mostly). Senior community center projects can proceed smoothly in the direction of some of the following tips and suggestions to promote. Senior community center should be expanded for 'private room type'. Government must support the operating costs. It will increase employment in rural areas. Senior community center should be 'Home Atmosphere'.
Stream Pilot Project, which began in May 2003 and finished in December 2003, was selected to develop effective methods applicable to nature-like streams. Stream restoration projects aim to maintain or increase ecosystem goods and services while protecting downstream and coastal ecosystems. Fields environmental monitoring such as flow discharge and precipitation were conducted along the Idong stream for amount of channel zone change in 2007. This study selected three monitoring positions to measure the water level and discharge of flowing water. A stage-discharge relation is obtained from direct discharge measurements for three stations by fitting an empirical relationship to the data set. Since discharge measures are made only for low flow conditions, a curve of discharge against stage can then be built by fitting these data with a power curve. And this study used data obtained from floodmark checkup as well as HEC-RAS model to analyze the hydrodynamic characteristics of monitoring sites. Reach-averaged hydraulic parameters for the supply reach were calculated from the small area's HEC-RAS model for Idong stream, and a HEC-RAS model used to analyze hydraulics for a period in 2007, after the stream was considered bank stabilization.
Purpose : This study develop a Video Recording-Based Standardized Handoff (VRSH) program at shift change for ward nurses. Methods : The study was conducted in five medical, three surgical, and one comprehensive nursing care service wards affiliated with a secondary general hospital. In this methodological study, the VRSH program was developed between April and December, 2017. It is noted that 65 nurses who were involved in the VRSH program participated in this study. Results : In line with the modified Situation, Background, Assessment, Recommendation tool, the VRSH program consisted of three phases. In the VRSH program, the average time for handoff duration was 3-5 minutes per patient. More than 90% of the ward nurses were satisfied with the VRSH program since it benefited them by reducing overtime work and improving the performance, as well as effective communication, of nurses. The content analysis of nurses' VRSH program experience, revealed three categories and eight sub-categories. Conclusions : This study provides evidence that the VRSH program improves effective nursing performance and, the handoff communication and relationships between nurses. Future studies on large sample sizes and multiple settings are required to substantially evaluate the impact of the VRSH program on clinical outcomes.
International conference on construction engineering and project management
/
2005.10a
/
pp.845-848
/
2005
Technology transfer (TT) has been defined as the shared responsibility between the source and the destination for ensuring that technology is accepted and at least understood by someone with the knowledge and resources to apply and/or use the technology. The adoption of TT in construction industries is necessary for economic growth to occur in developing countries such as Thailand. This process should provide numerous benefits for the host sector in areas such as increased productivity, enhancement of product quality, cost savings, improvements in market share and entry to new markets. However, there are many factors, which may impact on the TT process and its subsequent outcomes for Thai construction firms and individuals, including, the transfer environment, learning environment, transferor characteristics and transferee characteristics. The performance and interaction of these enablers will influence the degree of value added to the local construction sectors in areas such as economic advancement, knowledge advancement and project performance. This paper presents a conceptual framework for international TT that accommodates the numerous factors believed to impact on the processes effectiveness. Through a Pilot Study, where 27 industry professionals from Thailand were interviewed, the significant factors which impact on the TT process have been identified along with the strength of interrelationship between individual and groups of factors. Future research seeks to target a greater sample of respondents with the view to validate the conceptual model and apply it on a number of large Thai projects where international TT was incorporated into the project agreement.
Journal of the Korea Academia-Industrial cooperation Society
/
v.21
no.1
/
pp.448-456
/
2020
This study found that it is critical to consider farmers' intention to adopt new technology in order to facilitate the spread of new technology. Based on this assumption, the research team analyzed the following: factors that influence intention of adoption and marginal effects on those factors. The data were collected from 99 farmers who did not participate in the pilot projects on dissemination of new technologies developed by the Rural Development Administration (RDA). A total of 19 observed variables were set to measure seven latent variables: educational support; technical support; funding support; compatibility; trialability; observability; and antipathy. The intention to adopt new technology was established as the dependent variable. According to the ordered logit analysis, educational support, observability, and antipathy were found to have significantly affected the intention to adopt new technology; their odds ratio were 6.938, 2.716, and 0.501, respectively. According to the marginal analysis, educational support, observability, and antipathy were found to have significantly affected the intention to adopt new technology; their marginal effects were 20.2 %, 10.4 %, and -7.2 %, respectively. Therefore, this study suggests the following to facilitate the spread of new technology: first, provide quality support services through effective deduction; second, increase the visibility of new technology; and third, enhance the credibility of agricultural institutions by developing continuous relations with farmers to reduce their antipathy.
Ubiquitous application is in need of high-level technology to meet various requests for ubiquitous service. In order to adopt ubiquitous technology in not only pilot projects but also regional services, many projects like u-City are implemented in and outside the country. RFID has been known as one of the important technology to provide with core benefits of Ubiquitous services. Because each band of RFID technology has merits and demerits concurrently, single-band RFID system has limitations for various RFID services. Thus, we developed dual-band RFID system enable to provide with 13.56MHz and 2.45GHz RFID service at the same time to compensate the shortage of single-band RFID system. Also we have considered the way that the firmware would control signals without collision, studied battery life and range for tag, and made hardware for dual-band RFID service.
The core infra-technology in the ubiquitous era, RFID which has taken action from the public institution with the pilot projects as well as the practical projects is gradually extending its spectrum to the private enterprises. Along with its expansion, the audit required on the RFID-based information system is also growing in the industry. Especially, since RFID-based information systems, especially compared to other information systems, are likely to be exposed to many threats, the security audit for them is being emphasized. This paper suggests security audit checking items for the RFID-based information system, which can be used to perform the efficient security audit. The security audit checking items consist of eight basic checking items, each of which consists of detailed review items and can be applied for each building steps of the system(analysis, design, implementation, testing, and development). Finally, this paper confirmed the efficiency of the security audit checking items proposed in this paper through survey by the experienced auditors and analysis of practical audit cases.
International conference on construction engineering and project management
/
2005.10a
/
pp.1181-1186
/
2005
In many construction projects, progress and efficiency are hampered by poor communication of discipline-specific models. For example, architects use 2D or 3D CAD models and builders use CPM diagrams, Gantt charts, and spreadsheets to show their view of the project. Nowadays, advanced computer visualization tools, 4D CAD or VR, can show these disparate models to understand cross-disciplinary impacts of design and construction decisions. In Korea, several leading companies have tried to apply these tools to their pilot projects from the design phase to the maintenance phase. These companies have expected that more project stakeholders could understand a construction schedule more quickly and completely with 4D visualization than with the traditional construction management tools. However, modeling of the 4D CAD or VR can be quite time-consuming and expensive to generate manually and has therefore limited the spread and use of these models. In order to adopt widely those models in construction industry, the areas that those tools could support to take large benefits in diverse functional areas of construction management need to be analyzed. In this study, researchers analyze the usefulness and limitations of the 4D models and VR in the construction industry, develop the strategy of application priority, and improve the 4D modeling method.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.