Browse > Article
http://dx.doi.org/10.6106/KJCEM.2018.19.4.003

Proposal Strategy and Performance Analysis of Electronic Human Resources Management Pilot Project  

Kim, Inchie (Department of Convergence Engineering for Future City, Sungkyunkwan University)
Chin, Sangyoon (Sungkyunkwan University)
Kim, Seongah (School of Civil, Architectural and Environmental Engineering, Sungkyunkwan University)
Kim, Yeasang (School of Civil, Architectural and Environmental Engineering, Sungkyunkwan University)
Lee, Sangjun (Busan branch, Construction Workers Mutual Aid Association)
Park, Soohun (Smart Card Team, Construction Workers Mutual Aid Association)
Publication Information
Korean Journal of Construction Engineering and Management / v.19, no.4, 2018 , pp. 3-11 More about this Journal
Abstract
The Construction Workers Mutual Aid Association is carrying out a number of strategic tasks with the goal of "contributing to improving employment and stabilizing the return of workers to construction workers through employment welfare and retirement deduction services." One of them is the retirement deduction system. The retirement allowance system is a system for the retirement income and livelihood security of construction workers who are not adequately protected by the Labor Standards Act, such as retirement allowances due to the nature of day labor. The Construction Workers Mutual Aid Association has promoted the introduction of electronic manpower management. For the efficient management of the pilot sites and the plans for the future, comprehensive evaluation of the pilot sites as well as the evaluation of the status and operation results of each pilot project site are needed. Therefore, in this study, we will develop performance indicators to evaluate the current state of electronic manpower pilot projects and analyze the actual situation of pilot project sites through actual application, and try to derive future implementation strategies.
Keywords
Electronic Human Resources Management; Retirement Mutual Aid Program; Performance Evaluation;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Sim, G. B. (2016). "Mid-term evaluation and future improvement plan on the electronic-card pilot project for construction workers." Construction & Economy Research Institute of Korea.
2 Sim, G. B. (2006). "Record of discussion on the development plan for the electronic-card system and fostering settlement environment." Korea Employment Information Service.
3 Sim, G. C. (2014). "Analysis on the current status and improvement plan of welfare system for construction workers-focused on the Retirement deduction service, Graduate School of Labor Studies." Korea University, Thesis paper for Master's degree.
4 Choi, Y. G., Yoon, S. W., and Chin, S. Y. (2011). "Integrated Manpower Information Systems on Construction Site-Using RFID and QR code." Korean Journal of Construction Engineering and Management, KICEM, 12(4), pp. 106-116.   DOI
5 Kim, S. A., Chin, S. Y., Jang, M. S., Jung, C. W., and Choi, C. H. (2015). "A Development of Framework for Selecting Labor Attendance Management System Considering Condition of Construction Site." Korean Journal of Construction Engineering and Management, KICEM, 16(4), pp. 60-69.   DOI
6 Yu, I., Kim, K., Jung, Y., and Chin, S. (2007). "Comparable performance measurement system for construction companies." Journal of Management in Engineering, 23(3), pp. 131-139.   DOI
7 Chin, S., Kim, I., and Choi, C. (2017). "What authentication Technology Should Be Chosen for Construction Manpower Management?" Creative Construction Conference 2017, Primosten, Croatia.