• Title/Summary/Keyword: Pile Cutting Work

Search Result 19, Processing Time 0.02 seconds

GNSS-Based PHC Pile Cutting Position Sensing Methodology (GNSS 기반 PHC 파일 절단위치 센싱 방법론에 관한 연구)

  • Cho, Se-Hyun;Yoou, Geon-Hee;Kim, Jun-Sang;Lee, Jun Ho;Hur, Je;Kim, Young Suk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.387-388
    • /
    • 2023
  • PHC pile head cutting is an essential work in pile foundation construction. However, since the work has labor-intensive characteristics, there are problems such as productivity and safety. So in previous study PHC pile one-cutting head cutting automation equipment was developed to solve this problem. However, it has been investigated as a limitation that checking the cutting position of the PHC pile can be challenging in place where a rotary laser leveler cannot irradiate cutting position, as the sensing unit of the developed automated equipment utilizes an optical method. Therefore, the objective of this study is to delvelop a GNSS-based methodology for sensing the cutting position of PHC piles to overcome the limitations of the optical method and to examine its feasibility for field application. If the proposed methodology is applied to the construction site, it is expected that the convenience and productivity of the PHC pile cutting position sensing work will be improved.

  • PDF

Cutting-Line Sensing Methods for an Automated Concrete Pile Cutter (파일 두부정리 자동화 장비를 위한 두부정리선 센싱 방법)

  • Kim, Sung-Keun;Kim, Young-Suk;Lee, Junbok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.6D
    • /
    • pp.985-993
    • /
    • 2006
  • The use of prefabricated concrete piles have been gradually increased in many construction sites. One of main works for building a concrete pile foundation is to crush a part of pile head which is compressed with more than $800kg/cm^2$. A pile cutting work is usually performed by a crusher and three to four skilled workers. Recent reports on the pile cutting work reveal that a lot of cracks which significantly reduce the strength of the pile and are frequently made during pile cutting operations and it is very repetitive and labor intensive work. To improve productivity, safety, and quality of the conventional concrete pile cutting work, the research on developing an automated concrete pile cutter has been performed. In this paper, sensing methods for detecting a pile cutting line are suggested with operation process algorithms. The suggested methods are very important to develop the automated pile cutter. A pilot-type of the automated pile cutter that adopt one of the suggested sensing methods, is developed and tested in a construction site.

Development of the Pilot Type Machine for Automation of PHC Pile Cutting Work (PHC 파일 두부정리 자동화를 위한 파일롯타입 장비의 개발)

  • Lee Jeong-Ho;Park Sang-Jun;Jeong Myung-Hoon;Kim Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.173-181
    • /
    • 2003
  • During the last few years, the use of Pre-tensioned spun high strength concrete piles(PHC pile) has been gradually increased in many construction sites. Cutting work of the concrete pile is an important task to crush a part of pile head which is compressed with more than 800$\cal{kg}f/cm^2$. It is usually performed by a crusher and three to four skilled workers. Recent analysis results of the pile cutting work reveal that it frequently makes a lot of cracks which significantly reduce the strength of the pile and is labor-intensive work. The primary objective of this study is to propose conceptual designs for developing an automated pile cutting machine. It is anticipated that the development of the automated pile cutting machine would be able to bring improvements in safety, productivity, quality as well as cost saving.

Experimental Study for the Improvement of an Automated PHC Pile Head Cutter (PHC 파일 두부정리 자동화 장비 개선에 관한 실험적 연구)

  • Lee Jeong-Ho;Kim Myoung-Ho;Kim Young-Suk;Cho Moon-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.142-151
    • /
    • 2005
  • Several advanced countries have been continually developed PHC pile cutting automation machines for improving productivity, safety and quality of the conventional PHC pile cutting work. However, the target work of the previously developed PHC pile cutting automation machines is only crushing the head of PHC pile. Dangerous grinding work is still performed by workers with seven inch hand grinder. In domestic construction industry, the PHC pile cutting work is usually performed by a crusher and three to four skilled workers. Recent analysis results of the PHC pile cutting work reveal that it frequently makes a lot of cracks which significantly reduce the strength of the pile and is labor-intensive work. The primary objective of this study is to propose the end-effector which can effectively break PHC pile without any longitudinal cracks and to develop an automated pile cutting machine having unified grinder and crusher parts through a wide variety of laboratory and field tests. It is anticipated that the development of the automated pile cutting machine would be able to bring improvements in safety, productivity, quality as well as cost saving.

Development of the End-effector for Developing a PHC Pile Cutting and Crushing Machine (PHC 파일 두부정리 자동화 장비의 말단장치 개발)

  • Lee Jeong-ho;Kim Young-suk;Cho Moon-young;Kim Sung-keun;Sung Nak-won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.531-534
    • /
    • 2004
  • Cutting work of the concrete pile is an important task to chsh a part of pile head which is compressed with more than $800kgf/cm^{2}$. It is usually performed by a crusher and three to four skilled workers. llecent analysis results of the pile cutting work reveal that it frequently makes a lot of cracks which significantly reduce the strength of the pile and is labor-intensive work. The primary objective of this study is to propose the end-effector which can effectively break PHC Pile without any longitudinal cracks before developing an automated pile cutting machine having unified grinder and crusher parts. It is anticipated that the development of the automated pile cutting machine would be able to bring improvements in safety, productivity, quality as well as cost saving.

  • PDF

Conceptual Design and Technical Feasibility Analysis of an All-in-one Attachment Based Steel Pipe Pile Cutting Robot (굴삭기 기반 강관말뚝 두부정리 및 절단 부위 핸들링 로봇의 개념디자인 및 기술적 타당성 분석)

  • Yeom, Dong Jun;Han, Jae Hyun;Jung, Eui Hyun;Kim, Young Suk
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.11
    • /
    • pp.45-54
    • /
    • 2018
  • The primary objective of this study is to develop a conceptual design of all-in-one attachment based steel pipe pile cutting robot that improves the conventional work in safety, quality, convenience and productivity. For this, the following research works are conducted sequentially; 1)literature review, 2)field investigation, 3)selection of element technology for conceptual design, 4)deduction of conceptual design and its work process, 5)technical feasibility analysis of the conceptual design and its work process. As a result, leveling laser and laser detector, plasma cutter, rotary grapple are selected as core technologies. Futhermore, a conceptual design and work process of an all-in-one attachment based steel pipe pile cutting robot are developed based on the core technologies. According to the technical feasibility analysis result, at least 76.8% of the respondents are selected positive answer about each device of the all-in-one attachment based steel pipe cutting robot. It is expected that the application range and impact on the construction industry will be enormous due to the increasing trend of the steel pipe pile market.

Development of an All-in-one Attachment-based PHC Pile Head Cutting Robot Prototype (All-in-one 어태치먼트 기반 PHC 파일 원커팅 두부정리 자동화 로봇의 프로토타입 개발)

  • Yeom, Dong-Jun;Park, Ye seul;Kim, Jun Sang;Kim, Young Suk
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.2
    • /
    • pp.37-44
    • /
    • 2019
  • The primary objective of this study is to develop a prototype of all-in-one attachment-based PHC pile head cutting robot that improves the conventional work in safety, productivity, and quality. For this, the following research works are conducted sequentially; 1)literature review, 2)development of an all-in-one attachment-based PHC pile head cutting robot prototype, 3)performance evaluation of each device, 4)economic analysis of an automated method. As a result, PHC pile cutting level sensing device, PHC pile cutting device, PHC pile handling device are developed. Futhermore, working process of an automated method is developed based on result of performance evaluation. According to the economic analysis result, the cost of the automated method was 21.37% less than that of the conventional method, and the economic efficiency was also superior(ROR 215.44%, Break-even Point 5.52month). It is expected that conclusions for future improvements are used in the development of the all-in-one attachment-based PHC pile head cutting robot to practical use.

Slip Failure Strength of Infilled Concrete with Reinforced PHC Pile by One-Cutting Method (원커팅 철근보강 PHC 말뚝의 속채움 콘크리트 부착파괴 성능)

  • Chun, Young-Soo;Sim, Young-Jong;Park, Jong-Bae
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.553-558
    • /
    • 2011
  • Existing method protruding strands that are embedded in PHC pile to connect pile head and foundation slab shows poor constructibility. As this causes crack and damage in pile head and casualties often occurs in construction site during the work, alternative method called one-cutting method, in which pile above the ground surface and strands embedded in pile are completely cut and pile head is reinforced with rebar for connection with foundation slab, is currently adopted. However, the capacity of details for these methods are not mechanically proved. In this study, in order to suggest proper details of reinforcement for one-cutting method, failures due to lack of shear resistance between infilled concrete and PHC pile are analyzed through experiments and embedded depth with infilled concrete inside PHC pile is suggested. Assuming that slip failure strength is 0.4MPa, which is obtained from experiment conservatively, to have rebar yielded before slip failure, minimum depth of infilled concrete for PHC 450 and PHC 500, need to be 600mm above, and for PHC 600, 1,000mm above.

Technical Feasibility and Field Applicability Analysis of an All-in-one Attachment-based PHC Pile Head Cutting Robot (PHC 파일 원커팅 두부정리 자동화 로봇의 기술적 타당성 및 현장 적용성 분석)

  • Yeom, Dong-Jun;Kim, Jun-Sang;Kim, Young Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.98-106
    • /
    • 2020
  • Conventional method of PHC pile head cutting work has several challenges with regard to safety, convenience, productivity, and quality. To address such problems, a prototype of the all-in-one attachment-based PHC pile cutting robot is developed(Yeom, 2018). The Primary objective of this study are to develop a final prototype of all-in-one attachment-based PHC pile cutting robot and to analyze technical feasibility and field applicability of final prototype. According to the technical feasibility and field applicability analysis result, at least 74.2% of the respondents are selected positive answer about technical feasibility of the final prototype, at least 66.6% of the respondents are selected positive answer about field applicability of the final prototype. It is expected that when deployed onsite, the final prototype can not only increase the practical use but also improvement the work safety and productivity of work at the PHC pile head cutting job site.

A study on the effect of the pile tip deformations on the pile behaviour to shield TBM tunnelling (Shield TBM 터널시공으로 유발된 말뚝선단의 변형이 말뚝거동에 미치는 영향에 대한 연구)

  • Young-Jin Jeon;Byung-Soo Park;Young-Nam Choi;Cheol-Ju Lee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.26 no.3
    • /
    • pp.169-189
    • /
    • 2024
  • In the current work, a series of three-dimensional finite element analyses have been carried out to understand the behaviour of pre-existing single piles and pile groups to adjacent Shield TBM tunnelling by considering various reinforcement conditions. The numerical modelling has analysed the effect of the pile cutting, ground reinforcement and pile cap reinforcement. The analyses concentrate on the ground settlements, the pile head settlements, the axial pile forces and the shear stress transfer mechanism at the pile-soil interface. In all cases of the pile tips supported by weathered rock, the distributions of shear stresses presented a similar trend. Also, when the pile tips were cut, tensile forces or compressive forces were induced on the piles depending on the relative positions of the piles. Furthermore, when the pile tips are supported by weathered rock, approximately 70% of the load is supported by surface friction, and only the remaining 30% is supported by the pile tip. Furthermore the final settlement of the piles without reinforcement showed approximately 70% more settlement than the piles for which ground reinforcement is considered. It has been found that the ground settlements and the pile settlements are heavily affected by the pile cutting and reinforcement conditions. The behaviour of the single pile and group piles, depending on the pile cutting, conditions of ground and pile cap reinforcement, has been extensively examined and analysed by considering the key features in great details.