The Cost Saving Method on Each Building Phase by Analyzing the Cost Structure (비용구조분석에 의한 건축단계별 공사비용 절감방법)

  • Park, Keun-Joon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.1 s.15
    • /
    • pp.97-103
    • /
    • 2005
  • Building costs means capital costs which include cost of land, costs of acquiring and preparing the site, construction costs, professional fees, furnishings, cost of financing the project. and cost of management required to run and maintenance the building for use. There are several phases that determine the building costs : design phase, construction phase, and operation & maintenance phase. So, the cost of work could be set against the examining the full range of complexities that a building program might contain. To solve this problem, it needs to compute building cost systematically. This is still in the development stage, awaiting the organization of rational cost data base. The method of cost saving by cost control could be constituted by detailed knowledge of building costs for all possible combinations of components and subsystems that can be assembled into integration model of cost factor on each phase of project development. The model of cost saving in each building phase is available for procedures of cost control of building systems.

Application Period and Participants for Construction Engineering at the Design Phase in Tall Building Construction (초고층 건축공사 설계단계에서의 시공엔지니어링 업무 적용시기 및 수행주체 분석)

  • Lee, Jin Woong;Cho, Kyuman;Kim, Taehoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.179-180
    • /
    • 2017
  • In order to improve the constructability of tall building construction, there is increasing needs to derive the design output by performing construction engineering at the design phase. It contributes to minimizing wastes such as design changes and reworks as well as improving project performance. Therefore, in this study, we analyzed the application period and participants for engineering tasks derived from a previous study, and then regrouped to efficiently reflect them at the design phase. Considering similarity of application period and attributes, the existing 22 engineering tasks, which were classified into 5 factors, were reclassified into 13 groups. The results of this study can be used as basic data for efficient construction engineering execution at the design phase.

  • PDF

Applicability Analysis of Photovoltaic System in the Construction Phase of High-rise Buildings (초고층 건축물 시공단계를 위한 태양광시스템의 적용성 분석)

  • Kang, Go-Une;Kim, Tae-Hoon;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.21-22
    • /
    • 2011
  • Recently, the development of alternative energy technologies has been actively conducted for energy conservation and CO2 emission reduction. Especially, photovoltaic energy has been applied practically in construction industry, and research on the building-integrated photovoltaic system (BIPV) that can replace fossil fuel for building operation and maintenance has been performed. However, this vibrant research has been limited to the use phase of buildings, and few studies have been carried out in the construction phase. The construction duration and the scale of the sites have increased along with the high-rise trend of buildings, and it is forecasted that the temporary electricity use and CO2 emission in the construction phase is increasing. In sight of these developments, this research analyzed applicability of the photovoltaic system for the construction phase that can replace the electricity used on the high-rise construction site.

  • PDF

Design Criteria for Effective Public Building Construction Process (공공청사의 효율적 조성을 위한 건축디자인 기준 설정 연구)

  • Kim, Chang-Shin;Dong, Jae-Uk;Lee, Hwa-Ryong
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.13 no.1
    • /
    • pp.43-53
    • /
    • 2013
  • The purpose of this study is to propose the reasonable method for effective public building construction process. Public building service administration is necessary to make efficient public building supply and demand program. As a result, current public building precess need four steps(organize public assets, various process, establish public building service administration, design criteria). 1. Planning phase : Participation of Private Experts is guaranteed to enhance public building's function such as welfare, entertainment. 2. Design Phase : Detailed design review makes efficient and user oriented public building. 3. Construction Phase : Public Architect solve various problems among the participator especially in case of government local building construction. In conclusion, well formulated design criteria and Public building service administration make public building efficient in various field.

A Study on the Expression Level of BIM Model for utilizing in Construction Phase (시공단계 활용을 위한 BIM모델의 표현수준에 관한 연구)

  • Noh, Hae-Ra;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.253-254
    • /
    • 2016
  • In the trend of building enlargement, high-rise and irregular shaped building, domestic application of BIM in construction phase is increasing in recent years. BIM that is based on a three-dimensional, requires a specific building expression. Model expression level required for each phase such as design, construction, and maintenance of the construction project can be different. BIM model to apply in practice is difficult because it is not clear to set up the criteria for the expression level of construction BIM model. And it has a limit that is lower productivity in construction project. Therefore, this study considers the way of the improvement and analyzes the application for representation level of construction BIM model through the survey. By analyzing of the survey results, this study will be to present a basis for an appropriate expression level setting of construction BIM model.

  • PDF

Identifying Potential Opportunities of BIM for Construction Risk Management (BIM을 이용한 건설리스크 해결 가능성 도출)

  • Won, Jongsung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.201-202
    • /
    • 2019
  • This paper aimed to identify potential opportunities of building information modeling (BIM) utilization for construction risk management. Construction risk factors and BIM functions were derived through conducting in-depth literature review. Nineteen construction risk factors could be resolved by various BIM functions. Phase planning, site analysis, design authoring, and 3D design coordination were identified as the most efficient BIM functions for construction risk management.

  • PDF

A Study on Client's Decision-Making in Construction Phase of Building Projects in Japan

  • Tamura, Atsushi;Kaneta, Takashi;Furusaka, Shuzo
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.183-191
    • /
    • 2017
  • In building project, client needs to decide many things, and clients cooperate with architects, supervisors, general contractors and other consultants. Especially in construction phase, clients often make a decision. However, client's decision-making in construction phase often makes some kinds of risk. This paper aims to clarify the reality of client's decision-making in construction phase. First, client's decision-making is defined by laws and standards. Second, the questionnaire revealed the current status of client's decision-making in 4 works. Third, Fishbone diagram shows the factors of client's decision-making in four works. Finally, it was modeled how client's decision-making in construction phase affects the post-process of 4 works.

  • PDF

Factor Deduction of the Checklist for Environmental Management in Construction Phase (시공단계 환경관리를 위한 체크리스트 항목 도출)

  • Kim, Chang-Won;Lee, Myungdo;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.139-141
    • /
    • 2013
  • Construction industry has been participated in the effort for the reduction of environmental pollution such as introduction of green building certification, enactment of environment related regulation. However these efforts are focused on the design and maintenance phases of entire life cycle, construction phase that can occur intensive environmental impact in a short period is insufficient. Therefore this study aim to derive environmental management factors in construction phase and assess them using reliability analysis and factor analysis. As a results, the 20 factors was classified into 4 superordinate such as 'plan and supervision', 'environmental factor management', 'licensing management', 'surrounding environment management'.Based on result of this study, further study should be developed the checklist for effective environmental management in construction phase.

  • PDF

A Study on Obstacle Reasons of BIM in Construction Phase (시공단계에서의 BIM 도입 저해요인에 관한 기초연구)

  • Kim, Ji-Sun;Yoo, Seung-Kyu;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.61-62
    • /
    • 2011
  • Construction plans for large construction projects are problems such as Incompatibility of information, omissions due to technical limitations of 2D CAD. In addition to, Plan established for the validation such as process, cost and construction technology plan is difficult. By occurring Frequent changes in the course of business, Inefficiency of management has occurred. In the construction process, there is occurred costs and construction delays due to reconstruction or communication error. In this study, It was deemed BIM will complement Existing 2D CAD problem. And, BIM case studies in the construction phase of domestic construction were analyzed, How to apply BIM in the construction phase investigated.

  • PDF

Deduction of Critical Components for establishing the Environmental Load Reduction Guideline in Construction Phase (시공단계 환경부하 저감 가이드라인 구축을 위한 주요 구성항목 도출)

  • Kim, Chang-Won;Kim, Chun-Hak;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.127-128
    • /
    • 2012
  • Recently, Construction industry has been trying to reduce environmental loads reflecting the global trend 'Green Growth'. Internal and External countries are provided 'green building certification', 'relevant law/regulations', 'guideline to life cycle', however, construction phase has been overlooked though environmental loads occurred intensively in this phase. Therefore, this study intend to deduct components reflected the guideline in construction phase and assess them quantitatively. The basis data is collected through survey targeting construction managers and related researchers and analyze these data using Analytic Hierarchy Process.

  • PDF