Journal of Korean Society of Industrial and Systems Engineering
/
v.43
no.4
/
pp.150-160
/
2020
In this paper, we introduce a pilot's scheduling model which is able to maintain and balance their capabilities for each relevant skill level in military helicopter squadron. Flight scheduler has to consider many factors related pilot's flight information and spends a lot of times and efforts for flight planning without scientific process depending on his/her own capability and experience. This model reflected overall characteristics that include pilot's progression by basis monthly and cumulative flight hours, operational recent flight data and quickly find out a pinpoint areas of concern with respect to their mission subjects etc. There also include essential several constraints, such as personnel qualifications, and Army helicopter training policy's constraints such as regulations and guidelines. We presented binary Integer Programming (IP) mathematical formulation for optimization and demonstrated its effectiveness by comparisons of real schedule versus model's solution to several cases experimental scenarios and greedy random simulation model. The model made the schedule in less than 30 minutes, including the data preprocessing process, and the results of the allocation were more equal than the actual one. This makes it possible to reduce the workload of the scheduler and effectively manages the pilot's skills. We expect to set up and improve better flight planning and combat readiness in Korea Army aviation.
Journal of Institute of Control, Robotics and Systems
/
v.8
no.5
/
pp.363-372
/
2002
In ship operation, the roll motions can seriously degrade the performance of mechanical and personnel effectiveness. So many studies for the roll stabilization system design have been performed and good results have been achieved. In many studies, the stabilizing fins are used. Recently rudders, which have been extensively modified, have been used exclusively to stabilize the roll. But, in the roll stabilization control system, the control performance is very sensitive to the ship speed. So, we can see that it is important to consider the ship speed in the rudder roll control system design. The gain-scheduling control technique is very useful in the control problem incorporating time varying parameters which can be measured in real time. Based on this fact, in this paper we examine the;$H_{\infty}$-Gain Scheduling control design technique. Therefore, we assume that a parameter, the ship speed which can be estimated in real time, is varying and apply the gain-scheduling control technique to design the course keeping and anti-rolling control system far a ship. In this control system, the controller dynamics is adjusted in real-time according to time-varying plant parameters. The simulation result shows that the proposed control strategy is shown to be useful for cases when the ship speed is varying and robust to disturbances like wind and wave.
Journal of the Korea Institute of Military Science and Technology
/
v.17
no.4
/
pp.501-509
/
2014
In NCW(Network Centric Warfare) environment, mobile nodes communicate through wireless link. But wireless link provides limited networking performance due to signal interferences or mobility of nodes. So it is quite challenge to acquire enough networking resources and use the resources efficiently. In this paper, we have proposed a P2P based tactical information sharing system which provides satisfactory visual information playout for mobile nodes(i.e., military personnel, vehicle,..) in NCW environment. Our proposed system consists of two components. One is caching-enabled switch which stores tactical information segments at its internal storage and then transports them to mobile nodes when require. Another is centralized scheduling algorithm which exploits networking resources more efficiently. To validate performance of proposed system, we performed series of experiments in wireless network testbed. Results show improved performance in terms of segment-missing ratio, networking resources usage, sharing time, and number of simultaneous playout mobile nodes with acceptable playout continuity(i.e., over 95%).
Korean Journal of Construction Engineering and Management
/
v.23
no.6
/
pp.3-14
/
2022
Quantitative analysis of the number of construction workers and construction period can present a new standard for appropriate personnel. This study presents a Queueing model that predicts the execution time of work procedures, the most important factor among work efficiency indicators. During the working cycle of apartment frame construction the same process tends to be repeated the volume of contruction. Based on these characteristics, this study used a Queueing Model and analyzed reference layer cycle of the delayed frame construction. After adjusting the number of people and the construction period, the performance of the model was analyzed and suggested. This study aims to support the decision making of personnel distribution according to the volume of construction by performing a performance analysis of the Queueing Model.
Journal of Korean Society of Industrial and Systems Engineering
/
v.43
no.4
/
pp.116-122
/
2020
Human and material resource planning is one representative example of Operations Research. Resource planning is important not only in civilian settings but also in military ones. In the Air Force, flight scheduling is one of the primary issues that must be addressed by the personnel who are connected to flight missions. However, although the topic is of great importance, relatively few studies have attempted to resolve the problem on a scientific basis. Each flight squadron has its own scheduling officers who manually draw up the flight schedules each day. While mistakes may not occur while drafting schedules, officers may experience difficulties in systematically adjusting to them. To increase efficiency in this context, this study proposes a mathematical model based on a binary variable. This model automatically drafts flight schedules considering pilot's mission efficiency. Furthermore, it also recommends that schedules be drawn up monthly and updated weekly, rather than being drafted from scratch each day. This will enable easier control when taking the various relevant factors into account. The model incorporates several parameters, such as matching of the main pilots and co-pilots, turn around time, availability of pilots and aircraft, monthly requirements of each flight mission, and maximum/minimum number of sorties that would be flown per week. The optimal solution to this model demonstrated an average improvement of nearly 47% compared with other feasible solutions.
Journal of Korean Institute of Industrial Engineers
/
v.21
no.4
/
pp.463-477
/
1995
This paper presents a decision model that will estimate the expected number of failed units in a repair facility in accordance with the varying demand, and determine the required number of personnel for repairing components. The demand is related to the failure process which follows a reliability growth phenomenon in service. The information in this paper is useful for selecting appropriate scheduling rules and spares stocking policies. SIMAN and FORTRAN were used for computing the time dependent performance measures in the repair facility. The numerical integration method that is presented in this paper will provide accurate performance measures with any dynamic pattern of demand, service rates, and any number of servers.
Purpose: This study investigates the best appointment pattern which can enhance customer's satisfaction and hospital's efficient management reflecting plastic surgery clinic's service characteristics. Methodology: The data of this study is obtained from Plastic surgery Clinic which is located in the civic center. By collecting and analyzing the data, we build the simulation model using ARENA. Based on 5 appointment patterns that was suggested in formal appointment scheduling studies, we experiment 3 simulation models; 'Basic Appointment Pattern' that has no restriction, 'Restriction on Second Customer' that restricts the number of second customer's in each slot, 'Restriction on Process Time' that restricts the number of second customer who has long process time in each slot. We can check robustness of the appointment patterns by experimenting on off-peak day and peak day, during peak season. Findings: This study confirms that these 2 restrictions can give a better result than 'Basic Appointment Pattern' that just simply distributes customers by number. Especially, the performance of Triangle-like pattern which is the best appointment pattern in the formal study has been improved by adding restrictions. Based on 'DET', 'Restriction on Second Customer' shows a better result. Meanwhile, based on 'E(WT)', 'Restriction on Process Time' shows a better result. Overall, based on 'DET+E(WT)', 'Restriction on Second Customer' shows a better result. Practical Implications: The purpose of each hospital may alter as demand for plastic surgery grows increasingly. Thus, each hospital should be always prepared to introduce appointment pattern for changed purpose. In order to respond flexibly to these changes, it is necessary for medical personnel to improve the awareness or for hospital to create an environment by constructing appointment program so that medical personnel does not need to put more labor on work.
International Journal of Fuzzy Logic and Intelligent Systems
/
v.16
no.4
/
pp.225-237
/
2016
In conventional transportation problem (TP), all the parameters are always certain. But, many of the real life situations in industry or organization, the parameters (supply, demand and cost) of the TP are not precise which are imprecise in nature in different factors like the market condition, variations in rates of diesel, traffic jams, weather in hilly areas, capacity of men and machine, long power cut, labourer's over time work, unexpected failures in machine, seasonal changes and many more. To counter these problems, depending on the nature of the parameters, the TP is classified into two categories namely type-2 and type-4 fuzzy transportation problems (FTPs) under uncertain environment and formulates the problem and utilizes the trapezoidal fuzzy number (TrFN) to solve the TP. The existing ranking procedure of Liou and Wang (1992) is used to transform the type-2 and type-4 FTPs into a crisp one so that the conventional method may be applied to solve the TP. Moreover, the solution procedure differs from TP to type-2 and type-4 FTPs in allocation step only. Therefore a simple and efficient method denoted by PSK (P. Senthil Kumar) method is proposed to obtain an optimal solution in terms of TrFNs. From this fuzzy solution, the decision maker (DM) can decide the level of acceptance for the transportation cost or profit. Thus, the major applications of fuzzy set theory are widely used in areas such as inventory control, communication network, aggregate planning, employment scheduling, and personnel assignment and so on.
In a situation where competition becomes intense, health care organizations constantly strive to provide more services with given personnel and time. While not only the 'quantity' of the services but also the 'quality' becomes increasingly important, various problems that can occur during the 'process' of service provision can be effectively managed by applying the methods of management science. In this study, we introduce the cases where the methods of management science can be applied for the management of health care organizations in Korea and abroad. There are many cases where various scenarios for improving the patients' accessibility to the services and for maximizing the efficient use of limited resources are established, and simulation or basic statistical analysis methods are used to solve the problems more systematically or to develop improvement plans. In this study, several exemplary cases, such as no-show of patients, crowding in the emergency room, prediction of the number of available beds in the intensive care units, nurse scheduling, delay of arrival of patients, and ordering of the proper amount of therapeutic materials, are introduced and discussed. From the perspective of administrators or clinicians, however, it may not be easy to master the methodology that requires considerable mathematical background or apply the theories to practice directly. Therefore, it is suggested that more practical and relatively simple analytical methods should be applied. Also, having a more positive attitude toward improving the current performance (e.g., a belief that 'we can always be better than now'), and paying attention to improving the job satisfaction by addressing problems, with experimental spirit and data-driven decision management.
Journal of Korean Society of Industrial and Systems Engineering
/
v.47
no.3
/
pp.8-17
/
2024
There is a demand for introducing a challenging and innovative R&D system to develop new technologies to generate weapon system requirements. Despite the increasing trend in annual core technology development tasks, the infrastructure expansion, including personnel in research management institutions, is relatively insufficient. This situation continuously exposes difficulties in task planning, selection, execution, and management. Therefore, there is a pressing need for strategies to initiate timely research and development and enhance budget execution efficiency through the streamlining of task agreement schedules. In this study, we propose a strategic model utilizing a flexible workforce model, considering constraints and optimizing workload distribution through resource allocation to minimize bottlenecks for efficient task agreement schedules. Comparative analysis with the existing operational environment confirms that the proposed model can handle an average of 67 more core technology development tasks within the agreement period compared to the baseline. In addition, the risk management analysis, which considered the probabilistic uncertainty of the fluctuating number of core technology research and development projects, confirmed that up to 115 core technology development can be contracted within the year under risk avoidance.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.