Browse > Article
http://dx.doi.org/10.6106/KJCEM.2022.23.6.003

A Case Study on the Appropriate Construction Personnel of the Typical Floor of Apattment Frame Construction Using the Queueing Model  

Lee, JeongWon (Department of Architectural Engineering, Hanyang University)
Kim, BoHee (Department of Architectural Engineering, Hanyang University)
Ham, NamHyuk (Department of Digital Architectural and Urban Engineering, Hanyang Cyber University)
Kim, JaeJun (Department of Architectural Engineering, Hanyang University)
Publication Information
Korean Journal of Construction Engineering and Management / v.23, no.6, 2022 , pp. 3-14 More about this Journal
Abstract
Quantitative analysis of the number of construction workers and construction period can present a new standard for appropriate personnel. This study presents a Queueing model that predicts the execution time of work procedures, the most important factor among work efficiency indicators. During the working cycle of apartment frame construction the same process tends to be repeated the volume of contruction. Based on these characteristics, this study used a Queueing Model and analyzed reference layer cycle of the delayed frame construction. After adjusting the number of people and the construction period, the performance of the model was analyzed and suggested. This study aims to support the decision making of personnel distribution according to the volume of construction by performing a performance analysis of the Queueing Model.
Keywords
Queueing Model; Human Resource Management; Structural One Cycle Time Scheduling Mechnism of the Typical Floor Construction; Construction Productivity;
Citations & Related Records
Times Cited By KSCI : 6  (Citation Analysis)
연도 인용수 순위
1 Kim, K,H., Park, M.S., Lee, H.S., Park, S.W., and Joo, S.W. (2007). "An Assessment of Field Application of Elementary Technology for Reducing Construction Duration in the Apartment Housing Construction." Journal of the Architectural Institute of Korea structure & construction, 7(9), pp. 368-372.
2 Kim, K.T., and Cho, B.S. (2008). "A Study on the Relationships between HRM and Organizational Outcomes: Mediating Effects of Employee Attitude as an HRM Performance." Human Resources Organization Research, 16(1), pp. 115-157.
3 Kim, M.C., and Son, C.B. (2010). "A Status Analysis on the Organization and Service for Job Site Management of Specialty Contractors in Reinforced Concrete Work." Journal of the Korea Institute of Building Construction, 26(4), pp. 151-158.
4 Kim, J.W., Sohn, J.R., Song, S.h., and Bang, J.D. (2014). "A Study on the Basic Schedule Planning of Typical Floor in the Structural Framework of the High-rise Apartment Housing in Winter." Proceedings of the Korean Architectural Association Conference, South Korea.
5 Kim, W.G., Ham, N.H., and Kim, J.J. (2021). "Enhanced Subcontractors Allocation for Apartment Construction Project Applying Conceptual 4D Digital Twin Framework" Sustainability, 13(21), p. 11784.   DOI
6 Ko, S.H., and Yoon, B.K. (2020). "An Analysis on the Operation of R.O.K.A Mortar Company with Queuing Model." Management Science, 37(1), pp. 19-31.   DOI
7 Kwon, W.K., and Lee, Y.H. (2009). "Fair and Effcient Human Resource Allocation." Proceedings of the Fall Conference of the Korean Society of Industrial Engineers, South Korea.
8 Lee, G.R., Han, C.H., and Lee, J.B. (2019). "The Development of Productivity Prediction Model for Interior Finishes of Apartment using Deep Learning Techniques." Korean Journal of Construction Engineering and Management, KICEM, 20(2), pp. 3-12.   DOI
9 Truong, N.K.V., Choi, Y., Kim, L., Shin., S., and Hwang, W.J. (2010). "A probabilistic approach to workflow time analysis for business process management." International Journal of Human and Social Sciences, 5(12), pp. 811-815.
10 Wee, K.S., Noh, S.H., Ham, N.H., and Kim, J.J. (2021). "A study on the Improvement of the Large-scale Apartment Foundation Concrete Pouring Work in South Korea Resource Management using the Queing Model." Journal of the Architectural Institute of Korea, 37(9), pp. 227-235.   DOI
11 Woo, G.B., Oh, S.W., Kim, Y.S., and Kim, Y.S. (2008). "The Development of a Productivity Prediction System in the Structural Framework of Apartment Housing Projects Using Data Mining Techique." Journal of the Korea Institute of Building Construction, 24(9), pp. 113-122.
12 Yang, J.K., Lee, T.S., and Lee, J.M. (2019). "An Empirical Analysis on the Working Conditions of Construction Technician." Korean Journal of Construction Engineering and Management, KICEM, 20(1), pp. 14-21.   DOI
13 Shahtaheri, M., Hass, C.T., and Rashedi, R. (2017). "Applying very large scale integration reliability theory for understanding the impacts of type II risks on megaprojects." Journal of Management in Engineering, 33(4), 04017003.   DOI
14 Park, S.Y. (2022). "A study on measuring the level of inventory imbalance of Seoul's Bike Sharing System using Queuing Theory." Master dissertation, Ewha Womans Univ.
15 Park, Y.N. (2019). "A Study on the Influences of Schedule Uncertainty upon Construction Paths Introducing Social Network Analysis." Doctoral dissertation, Hanyang Univ.
16 Seong, D.Y., Baek, I.S., Kim, J.J., and Ham, N.H. (2021). "Analysis of 3D Laser Scanner Input Performance in Structual Safety Diagnosis." Journal of KIBIM, 11, pp. 34-44.   DOI
17 Kim, H.J., Yoo, M.Y., Kim, J.J., and Choi, C.S. (2017). "Performance Analysis of BIM Labor using Case Analysis." Journal of KIBIM, 7(3), pp. 31-39.   DOI
18 Bang, J.D., Han, C.H., and Kim, S.K. (2004). "Optimization of Estimating Duration of the Structural Frame for the High." Journal of the Architectural Institute of Korea structure & construction, 5(6), pp. 170-178.
19 Choi, J.S., and Lee, J.S. (2018). "A Study on Outsourcing Application of M.E.P. System for Manufacturing Process Improvement of the Modular Construction Method." Journal of Building Construction, 18(3), pp. 277-283.
20 Choi, G.H. (2011). "A study on the evaluation of technology for shortening the period of construction by construction type of reinforced concrete structure." Master dissertaition, Hanyang Univ.
21 Ha, B.H., Bae, J.S., and Gang, S.H. (2004). "Prediction of execution time of corporate business procedures using queue model." Proceedings of the Korean Operations and Management Science Society Conference, South Korea.
22 Yoon, S.W., Kim, D.K., Jang, Y.L., and Kho, S.Y. (2013). "Determination of Appropriate Number of Ticket Gates at Subway Stations Based on M/G/K Queuing Mod." Journal of the Korean Transportation Association, 69, pp. 454-459.
23 Yun, U.C. (2021). "A Study on the Effects of Human Resource Management System in Social Enterprises on Organizational Performance." Doctoral dissertation, Hanyang Univ.
24 Yang, J.W., and Lim, N.G. (2020). "TACT-based Optimization Process Model for Improving Work Continuity in Structural Work of Apartment." Proceedings of the Association of Korean Institute of Architects, 22(5), pp. 71-79.
25 Choi, M.Y. (2009). "An Evaluation on the Propriety Essential Technique for 4 day cycle in RC Structure Frame Construction." Master dissertation, Hanyang Univ.
26 Choi, Y.K. (2021). "A Study on the Changes of Landscape Architecture in Apartment Housing using Big Data." Master dissertation, Hanyang Univ.
27 An, S.H., Kim, G.H., Kim, J.Y., Park, H.I., and Jung, B.W. (2007). "A Study on 3-Day Cycle Time for Reducing the Duration of Structural Frame Work." Journal of the Korea Institute of Building Construction, 23(5), pp. 203-210.
28 Bae, J.S., and Sa, J.H. (2003). "The Effects of Human Resource Management Systems on Organizational Performance." Human Resources Organization Research, 11(2), pp. 133-169.
29 Chae, J.S., and Kim, C.J. (2019). "The Impact of Strategic Human Resource Management on Management Performance through Organizational Competence." Human Resource Management Research, 26(1), pp. 143-174.   DOI
30 Son, Y.S., and Jeong, J.M. (2022). "A method of adaptive control of air tanker ground latency using a multiserver queuing model." Proceedings of the Korean Telecommunications Society Conference , pp. 1047-1049.
31 Song, Y.W., and Choi, Y.K. (2003). "A Study on Material Requirement Planning by Integrating Schedule and Cost." Journal of the Architectural Institute of Korea structure & construction, 4(1), pp. 106-113.
32 Shin, J.H., and Lee, C.S. (2003). "A Proper Construction Planning System for the Reinforced Concrete Work of Apartment Buildings." Journal of the Korea Institute of Building Construction, 19(11), pp. 207-213.
33 Son, K.H., Kim, E.J., Han, D.W., and Kim, S.T. (2001). "Case study of queue system at bank teller: Simulation using Arena." Journal of the Korean Business Administration, 27, pp. 81-104.
34 Kim, B.Y. (2021). "Tasks of Basic Local Government Competence for Welfare Decentralization: Focusing on Human Resource Management." Journal of the Korean Social Policy, 28(1), pp. 65-102.   DOI
35 Kim, G.J. (2022). "Human resource management in the post-human era, how to do it?." Journal of the Logos Management Research, 20(2), pp. 25-42.
36 Ha, G.J., Ha, M.S., and Lee, D.R. (2019). "A study on the effective management plan of skilled manpower through analysis of work environment and productivity of construction skilled manpower." Proceedings of the Korean Institute of Architects and Engineers-Structural System, 35(12), pp. 173-180.
37 Son, B.S., and Kim G.U. (2020). "A plan to strengthen the expertise of overseas CM technicians and expand the professional workforce." Journal of the Construction Engineering and Management, 21(1), pp. 20-22.
38 Son, C.B. (2003). "A Status Analysis on the Selection and Evalution of Field Manager in Apartment Building Project." Journal of the Korea Institute of Building Construction, 19(9), pp. 147-154
39 Frederick, H., and Mark, H. (2010). Introduction to Management Science, A Modeling and Case Studies with Spreadsheets.
40 Ha, G.J., Choi, M.K., Ha, M.S., and Ha, J.H. (2012). "Comparative Analysis on the Labor Cost of Workers Frame work in Apartment House." Proceedings of the 2012 Korean Architectural Association Conference, South Korea.
41 Ham, N.H., Ahn, B.J., and Kim, J.J. (2018). "Specialty Contractor's Role and Performance Analysis for Digital Fabrication." Journal of KIBIM, 8(1), pp. 43-55.   DOI
42 Han, C.H., and Bang, J.D. (2004). "Development of an Effective Time Scheduling Mechanism of the Structural Framework for the High-rise Apartment Housing." Journal of the Architectural Institute of Korea structure & construction, 5(4), pp. 87-96.
43 Jang, W.B., and Kim, H.S. (2003). "Productivity Measurement Approach Based on Job Cycle Analysis." Journal of the Korea Institute of Building Construction, 23(2), pp. 619-622.
44 Jang, Y.H., Yu, H.C., and Lee, E.Y. (2022). "Reinforcement Learning-based Pod Autoscaling Technique Using the Queueing Mode." Journal of the Information Science Society, 49(2), pp. 106-119.
45 Kim, E.J., Kim, J.H., Lee J.H., and Huh, Y.K. (2016). "Analysis of Different Perception on the importance of Construction Schedule Delay Factors by Participants in Apartment Construction Projects." Journal of the Korea Institute of Building Construction, 18(3), pp. 165-172.
46 Huh, S.H., Shim, J.H., Ham, N.H., and Kim, J.J. (2021). "BIMbased Design Verification Performance Analysis with Priority Rules Applied." Journal of KIBIM, 11, pp. 1-11.
47 Jeon, S.H., and Koo, K.J. (2015). "Trend Analysis of Labor Input Ratios by Work Types in Apartment Housing Constructions." Journal of the Architectural Institute of Korea structure & construction, 16(5), p. 97.
48 Kang, D.W., Shim, J.G., Kim, Y.K., Cho, K.M., and Hyun, C.T. (2010). "A Study on the Productivity Analysis of Superstructure Construction for Multi-Housing Projects Using Construction Simulation." Journal of the Korea Institute of Building Construction, 26(4), pp. 123-131.
49 Ji, G,S., Choe, S,D., and Kim, C,J. (2021). "Keimyung University Dongsan Medical Center New Hospital CM Case." Construction Engineering and Management, 22(5), pp. 31-39.
50 Kim, B.Y. (2019). "Utilization of Landscape Information Model for Urban Disaster Reduction Design." Doctoral dissertation, Seoul Univ.
51 Kim, K.H., Yoon, Y.S., and Kim, J.J. (2004). "Optimal Project Duration Estimation Through Enhanced Resource Leveling Technique." Journal of the Architectural Institute of Korea Structure & Construction, 5(5), pp. 126-134.
52 Suk, S.J., An, S.H., and Kang, K.I. (2005). "A Model for Assessing a level of Construction Project Using Analytic Hierarchy Process." Journal of the Korea Institute of Building Construction, 21(5), pp. 143-150.
53 Ham, N.H., and Kim, J.J. (2015). "A Case Study on BIM Operating and Performance Measurement in Construction Phase." Journal of KIBIM, 5(2), p. 2.
54 Frederick, H., and Mark, H. (2013). Introduction to Management Science, A Modeling and Case Studies with Spreadsheets.
55 Han, S.Y., Shin, H.S., and Yang, H.S. (2019). "Application of Apartment Housing Project of Early Strength Concrete for Shortening the Construction Period." Consturtion Articles, 31(5), pp. 57-60.
56 Joo, S.W., Lee, H.S., Park, M.S., Park, S.W., and Kim, K.H. (2007). "A Study on Shortening of Framework Schedule and Cost Calculation in the RC Apartment Housing." Journal of the Architectural Institute of Korea structure & construction, 27(1), pp. 667-670.
57 Kim, S.S. (2018). "The Effects of High-Performance Human Resource Management System on Construction Companies Performance : The Test of Mediating and Moderating Effects of Workplace Innovation." Doctoral dissertation, Chosun Univ.
58 Korea Construction Industry Research Institute, Trends and Trends in Construction Industry (2016).
59 Lee, H.M., Lee, D.H., Zheng, Q., and Kim, S.K. (2010). "A Productivity Analysis for Management Manpower of Building Construction Projects." Proceedings of the Korean Society for Ecological and Environmental Architecture, 10(1), pp. 45-55.
60 Yun, J.R., Kim, S.S., and Kim, H.C. (2018). "An Study on the Effects of High Performance Human Resource Management System on the construction core competency and Job Performance: Focused on the Mediating Effects of Organizational Commitment." Business Management Review, 9(2), pp. 97-120.
61 Yang, Y.K., and Kim, B.S. (2015). "Efficiency Analysis of the Labor Input for Safety Management in Construction Sites." Korean Journal of Safety Management Science, 17(4), pp. 87-96.   DOI
62 Ha, G.J., Choi, M.K., Lee, D.R., Ha, M.S., and Ha, J.H. (2014). "Analysis on the Actual Labor for Rational Manpower Resource Estimation of Form Work in Apartment Hous." Proceedings of the 2014 Korean Architectural Association Conference, South Korea.
63 Park, J.S. (2020). "A study on the human characteristics of fatalities caused by apartment house fires." Proceedings of the Korean Society for Disaster Prevention, pp. 95-101.
64 Lee, S.H. (2021). "A Study on the Oversea Construction Project Claim Factor Analysis and Improvement." Master dissertation, Hanyang Univ.
65 Lee, Y.H., Shin, K.S., and Kang, S.H. (2010). "Human Resource Allocation Considering Task Leverage Effect." Entrue Journal of Information Technology, 9(2), pp. 7-16.
66 Pablo, B.P., Gonzalez-Cruz, M.C., and Fernandez, D.M. (2012). "Human resource allocation management in multiple projects using sociometric techniques." International Journal of Project Management, 30(8), pp. 901-913.   DOI
67 Lee, J.H., and Song, E.N. (2021). "A Study on the Effects of Strategic Human Resource Management on Human Resource Flexibility and Organizational Performance." Security Research, pp. 325-348.
68 Kim, J.W. (2021). "A study on the Estimation Criteria for Appropriate Construction Period of Public Apartment Structural Work using the Queuing Model." Doctoral dissertation, Hanyang Univ.