• 제목/요약/키워드: Performance objectives

검색결과 1,992건 처리시간 0.028초

산업 R&D 프로그램의 성과지표개발에 관한 사례연구 (Case Study on the Development of Performance Indicators of Industrial R&D Program)

  • 양춘희;이재하
    • 산업경영시스템학회지
    • /
    • 제35권2호
    • /
    • pp.1-8
    • /
    • 2012
  • The primary goal of this study is to develop proper performance indicators for evaluating the results of industrial R&D program. We define R&D results include output, transfer, outcome, and impact in the performance of R&D program. Performance indicators are focused on the results of R&D commercialization, building the industrial foundations as performance proxy of R&D program of Ministry of Knowledge Economy. And we first try to design the coupled structure as logical model between R&D program goals and performance indicators. The coupled structure is represented with objectives of group unit of R&D program, implementation process, R&D practical stage, and the ultimate goal of R&D program.

Development of the Performance Analysis Model Based on Research and Development Phases for Automated Construction Equipment

  • Lee, Jeong-Ho;Kim, Young-Suk
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권2호
    • /
    • pp.1-17
    • /
    • 2012
  • The automated construction machines have been recently developed to help solve the construction industry problems that significantly affect labour, productivity, quality, and profit. Despite the importance of performance analysis to commercialize the automated construction machines, previous studies have mainly concentrated on developing hardware and software of automated construction machines. This research now focuses on two objectives: (1) to propose an analysis model which can measure productivity, quality, and safety improvement rate of automated construction machines based on research and development (R&D); and (2) to develop a performance analysis system which will aid the evaluator in analysing the performance of automated construction machines. Finally, it is anticipated that the effective use of the performance analysis model and computerized system will ably develop the high-performance, automated construction machines and establish the marketing strategy to increase not only the commercial value but also the upkeep and development of construction machines.

Factors That Affect Project Time and Cost Performance during Highway Construction Using Incentive/Disincentive Provisions

  • Pyeon, Jae-Ho;Park, Moonseo;Jung, Sangsun;Park, Taeho
    • 토지주택연구
    • /
    • 제11권4호
    • /
    • pp.115-124
    • /
    • 2020
  • Incentive/Disincentive (I/D) contract is designed for minimizing any disruption of traffic flow in road construction projects. I/D contracting projects have been evaluated with regard to time and cost performance in various states, more than 35 states. However, construction project managers and planners have little understanding of the project factors that affect the project time and cost performance of highway construction projects using I/D regulations. Therefore, the purpose of this research is to find factors that affect I/D project success or failure to improve the decision-making process for the implementation of I/D projects. In order to achieve the objectives of this research, the researchers collected I/D road construction project data from FDOT and performed evaluation for each collected project. Then, project data analysis to identify key factors that affect I/D project performance was performed. In conclusion, five significant factors for project time performance and six significant factors for project cost perfornace were identified and summarized.

The Impact of Board of Directors' Characteristics on Firm Performance: A Case Study in Jordan

  • KANAKRIYAH, Raed
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제8권3호
    • /
    • pp.341-350
    • /
    • 2021
  • This study tested the effect of the board of directors' (BOD) characteristics on the corporate performance of the Jordanian industrial and service companies listed on the Amman Stock Exchange (ASE) during the period 2015-2019. The characteristics of the BOD were measured through the following variables: MO = managerial ownership; CEODU = CEO duality; BI = board independence; GD = gender diversity; ND = nationality diversity; AE = advanced education; BM = board meetings; BSIZ = board size; CSIZ = corporate size; CA = corporate age. The corporate performance was measured by return on assets (ROA) and return on equity (ROE). The corporate size and corporate age were used as control variables. The study sample consisted of 85 industrial and service companies with 425 observations to identify the nature of the effect of the BOD characteristics on performance. This study applied time-series data (panel data), and the multiple linear regression method was used to achieve study objectives. Results showed a positive effect of the study variables on performance, while the corporate age and the education level (BOD members) have a negative effect on performance.

간호단위 성과평가도구 개발 (Development a Tool for Evaluating Nurses' Performance in Hospital Units)

  • 박성애;김진현;박광옥;김명숙;김세영
    • 임상간호연구
    • /
    • 제15권2호
    • /
    • pp.5-21
    • /
    • 2009
  • Purpose: This study was aimed to develop a tool for evaluating nurses' performance by using Balanced Score Card (BSC) in hospital units. Methods: Preliminary survey was done in 10 hospitals to investigate evaluation criteria for nurses' performance. For the main study, each of 14 nursing managers evaluated 2 nursing units (total of 28 nursing units) to verify the sensitivity of the tool criteria. The evaluation result drawn from the preliminary BSC tool was analyzed to verify the sensitivity and validity of the tool. Results: As a result, nurses' performance evaluation tool consisted of 4 categories, 8 objectives, and 14 criteria was developed. Conclusion: The BSC tool for nurses' performance evaluation provides meaningful data in evaluating nursing performance in hospital units.

언어네트워크분석을 이용한 교육과정 목표와 교과서 학습 목표와의 일치성 분석 - 2009 개정 교육과정의 지구과학 I을 중심으로 - (An Analysis on Congruency between Educational Objectives of Curriculum and Learning Objectives of Textbooks using Semantic Network Analysis - Focus on Earth Science I in the 2009 revised Curriculum -)

  • 정덕호;이준기;김선은;박경진
    • 한국지구과학회지
    • /
    • 제34권7호
    • /
    • pp.711-726
    • /
    • 2013
  • 본 연구의 목적은 2009 개정 과학 교육과정의 지구과학 I 목표와 교과서의 학습 목표와의 일치성을 알아보기 위한 것이다. 이를 위하여 교육과정의 목표와 교과서의 학습 목표를 능력, 공통 개념, 행위 동사로 구분하였으며, 이 자료를 언어네트워크분석을 이용하여 분석하였다. 분석 결과 능력 요소와 관련하여 교과서는 인지적, 정의적 영역을 주로 강조하였다면 교육과정은 이외에도 탐구능력을 함께 강조하였다. 공통 개념은 교과서가 교육과정보다 더 다양한 요소가 사용되었다. 행위 동사 요소는 '이해'를 가장 많이 사용하였으나 대부분 인지 체제 수준으로 제시한 것에 그치고 있다.

병렬처리를 위한 고성능 라이브러리의 구현과 성능 평가 (Implementation and Performance Analysis of High Performance Computing Library for Parallel Processing)

  • 김영태;이용권
    • 한국정보과학회논문지:시스템및이론
    • /
    • 제31권7호
    • /
    • pp.379-386
    • /
    • 2004
  • 본 연구에서는 병렬프로그램을 효율적으로 개발할 수 있고 병렬처리 프로그램의 성능을 향상시키는 이식성을 갖는 고성능 병렬 라이브러리인 HPCL(High Performance Computing Library)을 구현하였다. HPCL은 C 언어와 Fortran 언어로 구현되었으며, Fortran 프로그램에서 메시지 전송 인터페이스인 MPI(Message Passing Interface)를 효율적으로 사용할 수 있도록 하였다. 성능 분석은 PC 클러스터와 상업용 슈퍼컴퓨터인 IBM SP4를 이용하여 병렬프로그램의 성능 향상 및 통신 오버헤드 등에 대하여 다양하게 이루어졌다.

철도건설에서 BSC의 KPI도출과 BPM을 위한 프로세스 KPI도출 (Deductions of KPIs for BSC and Process KPIs for BPM in Railway Construction)

  • 류시욱;안병준;류명욱
    • 한국철도학회논문집
    • /
    • 제9권4호
    • /
    • pp.388-393
    • /
    • 2006
  • Recently, Korean government demands that public sectors like railway construction should improve their management efficiency. It is necessary for railway construction supported by government budget to aim at the companywide management efficiency. The Balanced Scorecard (BSC) is known as integrated performance management framework that helps a company to translate strategic objective info relevant performance within an organization. This paper focuses on relationship between KPIs (Key Performance Indicators) used to measure the performance of railway construction industry and process KPT for BPM (Business Process Management). Also, the vision and strategies of the railway construction is introduced, and the CSFs (Critical Success Factors) and the KPI based on BSC is developed. Finally, this paper explores that there is a possibility to fulfill the strategic objectives of railway construction industry through the connectivity between KPI based on BSC and process KPI based on BPM. We explain the detailed procedures with an example of railway construction industry.

벤처기업의 기업가정신과 혁신성과 관계 연구 : 사회자본의 매개효과를 중심으로 (An Empirical Study on the Relationship of entrepreneurship and innovation performance for venture business : focusing on the mediation social capital)

  • 송재길;하규수
    • 디지털산업정보학회논문지
    • /
    • 제6권4호
    • /
    • pp.267-278
    • /
    • 2010
  • The study has following objectives: First, an objective of this studies proves relations between a entrepreneurship and an innovation performance. Second, in innovation performance relationships of social capital this studies proves a mediating effects of a social capitall through theory study, an empirical analysis. In accordance with results of a hypothesis verification, first, a entrepreneurship affects positively a innovation performanc. Second, in accordance with analysis results of a social capital, an entrepreneurship, a innovation performance verified a mediating effects of a social capital. This results mean that the more a social capital an organization has among members, the higher an innovation performance.

건설사업 성과목표수립 단계의 필요성에 관한 연구 (The Necessity of Performance Goal Setting Phase for Construction Project)

  • 전미연;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.159-162
    • /
    • 2011
  • The goal setting and performance measurement is essential tool for performance management. If appropriate goal setting and performance measurement is not done, problems may arise in the management. Therefore, in order to improve the efficiency of building production that management is essential. In addition, the construction project objectives established at the planning phase give considerable influence on the success of the construction project. Therefore, objective of this paper is to suggest the necessity of performance goal setting phase. This paper analyzes problems of goal setting phase and suggests the way to improve about problems.

  • PDF