• Title/Summary/Keyword: Performance evaluation of disaster prevention

Search Result 90, Processing Time 0.034 seconds

Optimization of long span portal frames using spatially distributed surrogates

  • Zhang, Zhifang;Pan, Jingwen;Fu, Jiyang;Singh, Hemant Kumar;Pi, Yong-Lin;Wu, Jiurong;Rao, Rui
    • Steel and Composite Structures
    • /
    • v.24 no.2
    • /
    • pp.227-237
    • /
    • 2017
  • This paper presents optimization of a long-span portal steel frame under dynamic wind loads using a surrogate-assisted evolutionary algorithm. Long-span portal steel frames are often used in low-rise industrial and commercial buildings. The structure needs be able to resist the wind loads, and at the same time it should be as light as possible in order to be cost-effective. In this work, numerical model of a portal steel frame is constructed using structural analysis program (SAP2000), with the web-heights at five locations of I-sections of the columns and rafters as the decision variables. In order to evaluate the performance of a given design under dynamic wind loading, the equivalent static wind load (ESWL) is obtained from a database of wind pressures measured in wind tunnel tests. A modified formulation of the problem compared to the one available in the literature is also presented, considering additional design constraints for practicality. Evolutionary algorithms (EA) are often used to solve such non-linear, black-box problems, but when each design evaluation is computationally expensive (e.g., in this case a SAP2000 simulation), the time taken for optimization using EAs becomes untenable. To overcome this challenge, we employ a surrogate-assisted evolutionary algorithm (SAEA) to expedite the convergence towards the optimum design. The presented SAEA uses multiple spatially distributed surrogate models to approximate the simulations more accurately in lieu of commonly used single global surrogate models. Through rigorous numerical experiments, improvements in results and time savings obtained using SAEA over EA are demonstrated.

A Study on the Development of Smart Water Grid Key Performance Index for the Implementation of Smart City (스마트시티 구현을 위한 스마트워터그리드 성과평가지표 개발에 관한 연구)

  • Jung, Seung Kwon;Jun, Kye Won
    • Journal of Korean Society of Disaster and Security
    • /
    • v.13 no.1
    • /
    • pp.25-39
    • /
    • 2020
  • Despite the global promotion of Smart City, there is currently no standard for smart water grid development, and it is not possible to judge the success of Smart City. There is a clear need to establish the requirements and goals of the Smart Water Grid and accurately diagnose and improve the limitations and problems of the existing Smart Water Grid. For this purpose, it is very important to use the index suitable for Smart Water Grid goals. In this study, we developed Smart Water Grid Index which can be used to evaluate the target measurement and attainment of Smart Water Grid and can be utilized based on the implementation plan for Smart Water Grid in the future. Through the development of the Smart Water Grid Key Performance Index (SWG KPI), we will lay the groundwork for continuous capacity evaluation of the Smart Water Grid and improve the reliability of the Index. It is expected that it will be possible to prepare and evaluate a Challenge Evaluation Card for the planned Smart Water Grid by providing an evaluation table for grid competency evaluation.

Relationship between Normal Measurement and Error Rate of Output Voltage Linear Ratio of Seismic Accelerometer in Use (사용 중 지진 가속도계의 정상 측정과 출력전압 선형비 오차율 관계 분석)

  • Min-Jun Kim;Seong-Cheol Cho;Yong-Hun Jung;Jeong-Hun Won
    • Journal of the Korean Society of Safety
    • /
    • v.39 no.2
    • /
    • pp.65-74
    • /
    • 2024
  • We analyzed the relationship between the normal measurement of the seismic accelerometer (SA) and the error rate of the output voltage linear ratio to propose an evaluation method to determine whether the SA in use is measuring normally. Utilizing a test bed, the regular operation of SA in use was evaluated using acceleration data measured through impact tests since there are no regulations regarding performance testing of SA in use. For the used SA, the error rate of the output voltage linear ratio, which is a major performance criterion, was evaluated. We analyzed common characteristics of the SA that satisfied the impact test and the performance criteria of the output voltage linear ratio error rate. The results indicated that we must consider the decreasing trend and convergence of the error rate as the measurement angle increases, ensuring that the average value of the output voltage linear ratio error rate is within 1%.

Effect of connection rotation capacities on seismic performance of IMF systems

  • Han, Sang Whan;Moon, Ki-Hoon;Ha, Sung Jin
    • Earthquakes and Structures
    • /
    • v.10 no.1
    • /
    • pp.73-89
    • /
    • 2016
  • The seismic performance of moment frames could vary according to the rotation capacity of their connections. The minimum rotation capacity of moment connections for steel intermediate moment frames (IMF) was defined as 0.02 radian in AISC 341-10. This study evaluated the seismic performance of IMF frames with connections having a rotation capacity of 0.02 radian. For this purpose, thirty IMFs were designed according to current seismic design provisions considering different design parameters such as the number of stories, span length, and seismic design categories. The procedure specified in FEMA P695 was used for conducting seismic performance evaluation. It was observed that the rotation capacity of 0.02 radian could not guarantee the satisfactory seismic performance of IMFs. This study also conducted seismic performance evaluation for IMFs with connections having the rotation capacity of 3% and ductile connections for proposing the minimum rotation capacity of IMF connections.

A Study about False Alarm of Automatic Fire Detection System (자동화재 탐지설비의 비화재보 감소방안)

  • Lee, Jong-Hwa;Lee, Chun-Ha;Kim, Shi-Kuk;Kong, Ha-Sung
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.1
    • /
    • pp.41-49
    • /
    • 2011
  • The automatic fire detection system is an important facility installed with focusing on minimizing the damage from a fire. This paper presents in the followings as the methods to reduce the false alarm of the automatic fire detection system; first, to prepare for legal standard so that revised legal standard can be applied to the fire fighting property prior to revision; second, to introduce the performance based fire detection protection design in the law based fire protection design; third, to maintain the wiring of worn-out detector; forth, to introduce an evaluation system to the education for the fire warden; fifth, to extend the standard of MTBF(meantime between failure) of the detector; sixth, to extend of installing the analog type detector; seventh, to improve the structure of reset switch.

A Study on Estimation of Target Precipitation in Seoul using AWS minutely Rainfall Data (AWS 분(分) 단위 강우자료를 이용한 서울지역 특성에 따른 행정자치 구(區)별 목표강우량 산정에 관한 연구)

  • Kim, Min-seoka;Son, Hong-mina;Moon, Young-il
    • Journal of Korea Water Resources Association
    • /
    • v.49 no.1
    • /
    • pp.11-18
    • /
    • 2016
  • It is very important to decide probability precipitation that is used as hydraulic structure design and target rainfall for urban disaster prevention. Especially, National Emergency Management Agency (NAMA) announced target rainfall from probability precipitation in korea on city and district level. It make use to performance evaluation of disaster prevention and planning of development for disasters prevention capacity target. In this study was calculated target rainfall that is duration 1~3 hour based unit of gu (borough) by point and regional frequency analysis using rainfall data of Surface Synoptic Stations (SSS) and Automatic Weather Stations (AWS). The result of this study can utilized as a reference to related business such as disaster capability assessment and achievement of prevention capacity target against disasters. And it also will be contribute to establishment of prevention capacity target against disasters.

A study on measures for the mitigation of fire damage in Korea super high-rise building through the improvement of domestic·foreign standards (국·내외 기준개선을 통한 국내 초고층 건축물의 화재피해경감 대책에 관한 연구)

  • Ko, Jaesun
    • Journal of the Society of Disaster Information
    • /
    • v.13 no.2
    • /
    • pp.233-248
    • /
    • 2017
  • Uniform laws and regulations and reasonable design is necessary for the prevention of possible fire in super high-rise building. To this end, this study focused on super high-rise and massive building-related architectural review performance-based design (PBD) evaluation disaster impact assessment (DIA), and provided fire engineering measures for improving fire prevention on the basis of performance-based design by analyzing the buildings subject to these systems and problems in terms of contents. Above all, in the aspect of law and standard improvement, first, with regard to dual parts of two statutes though significant portion of them has the same contents in performance-based design (PBD) evaluation and disaster impact assessment (DIA), it is necessary to operate the systems after making them conform with each other and consolidating or abolishing them. Second, if it is impossible to consolidate or abolish performance-based design (PBD) evaluation and disaster impact assessment (DIA), the areas of contents of performance-based design (PBD) evaluation and disaster impact assessment (DIA) should be precisely classified and established. Next, engineering improvement measures against fire hazard in super high-rise building are as follows. First, it is necessary to revise the provisions of straight-run stairs in special escape stairs. And in case of installing a mechanical smoke exhaust system instead of smoke vent, sandwich pressurization used in the United Stated should be permitted. Second, with regard to smoke control system for special escape stairs, it was shown that there was necessity for revising the standards in order to enable air to be supplied according to section in case of fire, carrying out performance-based design, and the like from the early design stages to the completion stages. In the future, it is expected that an epoch-making contribution will be made to a decrease in casualties and property damage due to fire in case of super high-rise building where the results can be reflected after carrying out a study on maintenance and carrying out an additional study on other considerations of super high-rise building together with reflecting the improvement measures provided in the above-mentioned study.

Study for Using VR Techniques Performance Evaluation of the Elevator Evacuation (VR기법을 활용한 엘리베이터 피난 성능평가에 관한 연구)

  • Ro, Se-Ho;Yoon, Sung-Wook;Rie, Dong-Ho
    • Fire Science and Engineering
    • /
    • v.25 no.1
    • /
    • pp.13-18
    • /
    • 2011
  • In the disaster prevention design, it is important point to secure escape way at event of fire which makes people away from the fire more quickly and safely. Development of construction techniques leads to build many skyscrapers, and skyscrapers contains various dangers and increase levels of disaster. At basic design stage for skyscrapers, evacuation scenario is considered that occupants are escape using escape stairs and emergency elevators simultaneously at fire, but there is no evacuation program to simulate using escape stairs and emergency elevators at the same time. In this study, evacuation simulation is performed using method of VR which is based on Virtools of 3DVIA Co., and Simulex of IES Co. for safety and effectiveness where occupants are escape using escape stairs and emergency elevators simultaneously at the fire.

Evaluation of Physical Properties and Long-term Stability of Expansion Materials for Emergency Repair by Temperature (긴급복구용 팽창재료의 온도에 따른 물리적 특성 및 장기 안전성 평가)

  • Park, Jeongjun;Kim, Kisung;Kang, Hyounhoi;Kim, Ju-Ho;Hong, Gigwon
    • Journal of the Society of Disaster Information
    • /
    • v.14 no.1
    • /
    • pp.79-88
    • /
    • 2018
  • In this study, the changes of the expansion and strength according to the temperature of the emergency repairing expansion material were examined by cup foaming test and uniaxial compressive strength test, and the accelerated compression creep test was carried out to confirm the long term stability. Ramp & Hold test and accelerated compressive creep test were performed to evaluate the creep performance. The short - term creep test was used to determine the initial creep strain of the expanding material. The isothermal method using time - To evaluate the long - term compressive creep performance.

A Study on the Consciousness Survey of Improvement of Emergency Rescue Training -Based on the Fire Fighting Organizations in Gangwon Province- (긴급구조훈련 개선에 관한 의식조사 연구 -강원도 소방조직을 중심으로-)

  • Choi, Yunjung;Koo, Wonhoi;Baek, Minho
    • Journal of the Society of Disaster Information
    • /
    • v.15 no.3
    • /
    • pp.440-449
    • /
    • 2019
  • Purpose: Fire-fighting organizations are the very first agencies that take actions at a disaster scene, and emergency rescue training is carried out for prompt and systematic response. However, there is a need for a change due to the limitations in emergency rescue trainings such as perfunctory trainings or trainings without considering regional or environmental characteristics. Method: This study is to conduct theoretical review with regard to emergency rescue training and present a measure to improve the emergency rescue training through attitude survey targeting fire-fighting organizations in Gangwon area. Result: Facilities that cause difficulties when doing emergency rescue activity were mostly hazardous material storage and processing facilities. In terms of the level of emergency rescue and response task, most respondents answered that the emergency rescue was insufficient. The respondents answered that the effectiveness of emergency rescue training was helpful, but some responses showed that the training was not helpful because of scenario-based training, seeming training, similar training carried out every year, unrealistic training, and lack of competent authorities' interest and perfunctory participations. Most respondents answered for the appropriateness of emergency rescue training and evaluation that they were satisfied, however, they were not satisfied with the evaluation methods irrelevant to the type of training, evaluation methods requiring unnecessary training scale, and evaluation methods leading perfunctory participations of competent authorities. Lastly, respondents mostly answered that training reflecting various damage situations are necessary regarding the demand on the improvement of emergency rescue training. Conclusion: The improvement measures for emergency rescue training are as follows. First, it is necessary to set and prepare various training contents in accordance with regional characteristics by reviewing major disasters occurred in the region. Second, it is necessary to revise the emergency rescue training guidelines and manuals for appropriate training plan for each fire station, provide education and training for working-level staff members, and establish training in a way that types, tactics, and strategies of emergency rescue training could be utilized practically. Third, it is necessary to prepare a scheme that can lead participation and provide incentive or penalty from the planning stage of training in order to increase the participation of supporting and competent authorities when an actual disaster occurs. Fourth, it is necessary to establish support arrangements and cooperative systems by authority through training by fire stations or zones in preparation for disaster situations that may occur simultaneously. Fifth, it is necessary to put emphasis on the training process rather than the result for emergency rescue training and evaluation, pay attention to the identification of supplement points for each disaster situation and make improvements. Especially, type or form of training should be considered rather than evaluating the execution status of detailed processes, and the evaluation measure that can consider the completeness (proficiency) of training and the status of role performance rather than the scale of training should be prepared. Sixth, type and method of training should be improved in accordance with the characteristics of each fire station by identifying the demand of working-level staff members for an efficient emergency rescue training.