• Title/Summary/Keyword: Performance based fire-fighting design system (PBD)

Search Result 2, Processing Time 0.018 seconds

The Legal Problems and Improvement in the Performance Based Design of Fire-fighting (성능위주소방설계의 법적문제 및 개선방안)

  • Yi, Jong-Yeong;Baek, Ok-Sun
    • Fire Science and Engineering
    • /
    • v.24 no.1
    • /
    • pp.54-63
    • /
    • 2010
  • The buildings relevant to the law should be designed performance-based necessarily according to "Fire-Fighting System Installation Business Act" amended, January 1. 2009. Performance based design means that building design reflects structure, size, purpose, and building capacity to achieve the most effective design of fire-fighting system. Performance based design has meaning to buildings that it is insufficient to control fire-fighting by previous law-oriented design or inappropriate by uniform design, because of buildings becoming bigger and higher. However, it is difficult to implement the system actually, because laws relevant to fire-fighting prescribe only the object and the required qualifications of performance based design, but they don't have rules to enforce performance based design for specific parts. This study suggests improvements for a desirable implementation of performance based design in legal aspects, by analyzing the current legal regulations related to performance based design.

A study on measures for the mitigation of fire damage in Korea super high-rise building through the improvement of domestic·foreign standards (국·내외 기준개선을 통한 국내 초고층 건축물의 화재피해경감 대책에 관한 연구)

  • Ko, Jaesun
    • Journal of the Society of Disaster Information
    • /
    • v.13 no.2
    • /
    • pp.233-248
    • /
    • 2017
  • Uniform laws and regulations and reasonable design is necessary for the prevention of possible fire in super high-rise building. To this end, this study focused on super high-rise and massive building-related architectural review performance-based design (PBD) evaluation disaster impact assessment (DIA), and provided fire engineering measures for improving fire prevention on the basis of performance-based design by analyzing the buildings subject to these systems and problems in terms of contents. Above all, in the aspect of law and standard improvement, first, with regard to dual parts of two statutes though significant portion of them has the same contents in performance-based design (PBD) evaluation and disaster impact assessment (DIA), it is necessary to operate the systems after making them conform with each other and consolidating or abolishing them. Second, if it is impossible to consolidate or abolish performance-based design (PBD) evaluation and disaster impact assessment (DIA), the areas of contents of performance-based design (PBD) evaluation and disaster impact assessment (DIA) should be precisely classified and established. Next, engineering improvement measures against fire hazard in super high-rise building are as follows. First, it is necessary to revise the provisions of straight-run stairs in special escape stairs. And in case of installing a mechanical smoke exhaust system instead of smoke vent, sandwich pressurization used in the United Stated should be permitted. Second, with regard to smoke control system for special escape stairs, it was shown that there was necessity for revising the standards in order to enable air to be supplied according to section in case of fire, carrying out performance-based design, and the like from the early design stages to the completion stages. In the future, it is expected that an epoch-making contribution will be made to a decrease in casualties and property damage due to fire in case of super high-rise building where the results can be reflected after carrying out a study on maintenance and carrying out an additional study on other considerations of super high-rise building together with reflecting the improvement measures provided in the above-mentioned study.