• Title/Summary/Keyword: Performance Warranty

Search Result 55, Processing Time 0.025 seconds

Study on the Defects of Finishing Works of Apartment Houses during Warranty Liability Period and its Correlation (공동주택 마감공사의 하자보수기간 현황 및 연관성 연구)

  • Lee, Ung-Kyun;Seo, Deok-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.4
    • /
    • pp.385-391
    • /
    • 2017
  • The warranty liability period for defects in apartment buildings by work type is not based on scientific analysis, making the appropriateness of the term a culprit behind the lawsuits. Therefore, this research aims to evaluate the appropriateness of the warranty liability term of apartment buildings by identifying the current status of defects, in particular, caused by finishing works. That is because the number of defects, caused during the finishing works, accounted for the largest portion of the total defect cases of apartment buildings reported to the Apartment Defect Dispute Mediation Committee under the Ministry of Land, Infrastructure, and Transport of Korea between 2010 and 2011. The result from analyzing claims for defect repairs of the finishing works showed that most cases by work type continued to be made after two years, and only about 60% were charged within the warranty period. And, defects by work type have correlation, which needs to be considered for a better construction technique. Considering a low correlation between the possibility of defects and the construction performance rankings, which are highly relevant to the apartment preference. It is believed that there needs to be a qualification process for agencies that actually performs finishing works.

A Legal Study on the Standard for Conformity of the Goods in the International Sale of Goods (국제물품매매계약상(國際物品賣買契約上) 물품일치성(物品一致性)의 기준(基準)에 관한 법리적(法理的) 고찰(考察))

  • Song, Myeong-Bok
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.12
    • /
    • pp.133-162
    • /
    • 1999
  • The international sale transaction is in essence a sale of goods and presents all those commercial and legal problems in any sale of goods. As a result, A International sales contract imposes several duties on the parties : the seller must deliver the goods and transfer ownership in them, while the buyer must pay the price and take delivery of the goods. However, there are several problems which impede a active transaction between seller and buyer who have their places of business in other countries each other. Therefore, It is necessary to provide the concept on the conformity of goods in the Int'l Sale of Goods. Especially, In our consideration for the point of time when defects occurs, the existence of non-conformity of goods should be judged on the basis of time of delivery rather than time of contract. Moreover, The burden of proof about nonconformity of goods is another fact which make an international dispute between the contractual parties in an international trade. Thus, The consistency in the interpretation of law must be maintained betweened the warranty and seller's liability. In the Uniform Commercial Code and UN Convention, non-conformity of contract is made of contract liability. And in our civil and commercial law provisions of warranty should be understand as the special ones of the provisions of general non-performance of obligation liability. As a result, More concrete study of them is required because they may have a great influence especially on international trade. As a result, We should be our best in finding a helpful and systematic structure that the dualistic structure of nonperformance of obligation liability and warranty liability must be unified by studying the theories of English and American warranty and our legal system, as well as international practice and usage being used in an international trade.

  • PDF

A Study on the Application Scheme of the Warranty delivery system in Domestic Private Finance Initiative (국내 민간투자사업의 성능발주제도 도입에 관한 연구)

  • Kim, Dae-Kil;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.527-530
    • /
    • 2007
  • The construction market has gradually become complexity, variety and specialization, and then owner's requirements about quality has become various. In order to solve the problem such as stated above, advanced constructions in France, United Kingdom, Japan and United States have introduced warranty contract which is warranted to quality and performance for need of owner in determined term to ensure the quality of construction since 1960s. In addition to, domestic constructions have been meeting with international competition because of the open BOT market from FTA. Finally, this study proposed new warranty delivery system model in PFI on considering domestic status by benchmarking the delivery process and the characteristics of the warranty contract which is applied to PFI of global.

  • PDF

Reliability Assessment Criteria of Window switch for automobiles (자동차용 윈도우 스위치의 신뢰성 평가기준)

  • Choi, Man-Yeop;Choi, Beom-Jin;Baik, Jai-Wook
    • Journal of Applied Reliability
    • /
    • v.11 no.1
    • /
    • pp.1-15
    • /
    • 2011
  • Automobile markets are so fierce in the world market that every major manufacturer assure the buyer of the car by give a provocative warranty plan for their cars. For instance Hyundai motor company offer 10 years and 100,000 miles of warranty whichever comes first. But in order for this effort to be successful every critical component such as window switch has to be proven to be reliable in an adverse environment. Therefore, in this article reliability assessment criteria for window switch are established in terms of basic performance test, environment test and life test.

Case Studies of a Performance-Based Contract for National Highway Pavement Maintenance (성능보증제도를 적용한 일반국도 유지보수공사 시범사업)

  • Lim, Jaekyu;Kim, Yongjoo;Kim, Myeongil;Lee, Jaejun
    • International Journal of Highway Engineering
    • /
    • v.20 no.1
    • /
    • pp.1-8
    • /
    • 2018
  • PURPOSES : Case studies of an asphalt-overlay project with a performance-based contract method were conducted on a national highway in Korea to evaluate the effect of the method on asphalt pavement maintenance. This study evaluated the procedure of the performance-based contract method. METHODS : In this study, an asphalt-pavement maintenance project for a national highway was assessed with a performance-based contract to investigate the advantage of the new contract procedures. This is the first trial applying the performance-based contract to a pavement-rehabilitation project in Korea. In the four case studies, the warranty period of the performance-based contract was designed for seven years. The research team monitored the construction site to compare the normal contract method with the performance-based contract method. The case studies' project sites were investigated after the end of the construction. RESULTS : Based on the limited case studies, the performance-based contract method could extend the service life of the asphalt pavement and reduce the pavement-maintenance budget because the quality control was well managed by the contractors. However, a few construction laws would be necessary to apply the performance-based contract method in the future. CONCLUSIONS : Using the performance-based contract, the construction company made great efforts to guarantee the warranty period and to apply the optimal maintenance method, based on the pavement distress condition. The contractor and the agency would need to understand the new performance-based contract system for it to be activated. Therefore, a proper education program for the performance-based contract system would be needed to educate the stakeholders regarding the procedures and their effects on the pavement management and maintenance.

Performance based Construction Specifications and Design Criteria Development Plan of Electrical Installations (건축전기설비분야의 성능중심 건설기술기준 작성 지침 개발)

  • Kim, Se-Dong;Lee, Kwang-Sik;Choi, Eun-Hyeok
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2007.11a
    • /
    • pp.209-212
    • /
    • 2007
  • It is increased electrical energy consumption with the development of intelligence society in buildings and thus an energy conservation through efficient use of electricity and reliability, safety, etc became more important. This research paper intensively investigated performance based construction specifications and design criteria of electrical installations in domestic and foreign country. It is necessary to analyze the key features based on performance and general trend about contractor guarantee, warranty method, performance design criteria from the investigated data. This paper shows a reasonable performance based construction specifications and design criteria of electrical installations.

  • PDF

Parametric Estimation of a Renewal Function

  • Jeong, Hai-Sung;Na, Myung-Hwan
    • International Journal of Reliability and Applications
    • /
    • v.1 no.1
    • /
    • pp.81-87
    • /
    • 2000
  • One of the most important quantities in reliability theory is the expected number of renewals of a system during a given interval. This quantity, the renewal function, is used to determine the optimal preventive maintenance policy and to estimate the cost of a warranty. In this paper we study a parametric approach for a renewal function. The simulation study is presented to compare the relative performance of the introduced estimators of a renewal function. And we show that the proposed parametric estimator performs well.

  • PDF

Seatbelt alarm lamp lam-function improvement: Red-X a case application (시트벨트 경고등 점등불량 개선: Red-X 적용사례)

  • Moon, Chan-Oh;Kim, Chang-Eun
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.6
    • /
    • pp.171-179
    • /
    • 2007
  • The objective of this GM Red-X project was to reduce customer complaints on Kalos, Lacetti, Magnus as reported through 2004.1 - 2005.1 warranty performance. Seatbelt alarm lamp mal-function problem is connected with safety. So it is critical issue. Seatbelt alarm lamp mal-function which caused by buckle occurred 22 cases from 2004.1 to 2005.1.