Risk-based estimation has been successfully introduced into the construction industry. By incorporating historical data associated with probability analysis, risk-based estimate is an effective decision support aid in considering whether to launch a particular project. The industry challenges, however, especially related with management issues, such as labor shortage, wage growth, and supply chain complexity, have often resulted in poor cost performance. The insufficient assessing the project characteristics (i.e., resource availability, project complexity, and project delivery method) can be the main reasons in the poor cost performance. Because the accuracy level of cost performance prediction can be enhanced by extensive evaluation of the subject project characteristics, a new approach for predicting cost performance in an earlier stage of a project can improve the Industry substantiality, in other words, value maximization. The purpose of this paper is to develop a new methodology in developing a risk-based estimate tool by incorporating extensive project characteristics. To do this, an extensive industry survey was conducted from both private and public sectors in building industry in Korea. In addition, significant project characteristics were identified in terms of cost performance indicator. Although the data collection is limited to Korean industry the suggested approach provides the industry with a straightforward methodology in risk management. As many researchers maintained that front-end planning efforts are crucial in achieving the successful outcome in building projects, the new method for risk-based estimation can Improve the cost performance as well as enhance the fulfillment in terms of business sustainability.
The purpose of this article was to research the effects of physical environment on risk perception in customers at raw-fish restaurants in the Northeastern area of Kangwon province, South Korea. In this research, reliability analysis, factor analysis and path analysis were carried out. Physical environments were divided into four factors and risk perception into three factors. 'Exterior facility' had a negative influence on performance (p<0.001) and financial risk (p<0.001). 'Interior facility' negatively affected performance risk (p<0.001), financial risk (p<0.001) and time risk (p<0.001). 'The others' negatively influenced performance risk (p<0.05). Lastly, 'press copy' negatively influenced performance risk (p<0.001). Based on these results, various physical environments affected the risk perception in customers at raw-fish restaurants, and satisfaction level of customers was based on risk perceptions. As a result, food-service companies need to manage the physical environment as a marketing strategy, as well as reduce risk perception to increase customers loyalty.
최근 도심재생사업에 대한 관심과 연구가 활발히 진행되고 있다. 이는 기존 도시의 노후화된 건물과 저급화된 기반시설로 인해 파생되는 사회적 경제적 문제들을 새로운 도시개발 즉 재개발사업을 통해 해결하려는 노력의 일환이다. 그러나 도심재생사업은 사업에 관계되는 다양하고 복잡한 이해관계자들과 규모의 방대함으로 수많은 위험에 노출되어 있어 사업의 성과를 보장할 수 없다는 특징을 가지고 있다. 본 연구는 도심재생사업과 같은 메가 프로젝트의 성과관리를 함에 있어, 기존의 비용/공정 중심의 성과측정체계를 위험관리 관점으로 확장시킴으로서 메가 프로젝트에 대한 종합 성과관리의 효율성을 향상시키기 위한 목적으로 위험성과지수 방법론을 제시하였다. 본 연구에서 제시한 위험성과지수 방법론은 기존의 EVMS와 유사한 체계를 갖추고 있고, 위험성과지수를 구성하는 18종류의 세부지수와 변수를 통해 비용/공정/위험의 3차원적 통합 성과관리가 가능하게 하였다.
환경·사회·지배구조(ESG) 성과가 투자자의 의사결정에 미치는 영향이 커지고 있다. 과거 기업의 재무적 성과에 집중하던 투자자의 시선이 기업을 둘러싼 이해관계자의 이익이라는 비재무적 성과로 확장하고 있는 것이다. 이런 배경에서 본 연구는 기업의 비재무적 성과인 ESG 성과가 기업위험에 미치는 영향을 분석하기 위해 한국기업지배구조원이 평가하는 기업을 대상으로 패널회귀분석을 실시하였다. 분석 결과 ESG 성과는 세 가지 기업위험(체계적위험, 비체계적위험, 총위험) 모두에 대해 음(-)의 영향을 미치고 있어 이해관계자이론과 위험관리이론을 지지하는 결과를 나타냈다. 본 연구의 시사점은 첫째, ESG는 비체계적위험 뿐만 아니라 광범위하고 무차별적인 체계적위험도 감소시키고, 둘째, 투자자는 ESG 투자를 집행함으로써 투자포트폴리오의 위험을 감소시킬 수 있고, 셋째, 기업은 ESG 경영의 보험기능을 활용함으로써 부정적인 상황에서도 안정적인 재무성과를 영위할 수 있으며, 마지막으로, 정부는 합리적인 ESG 관련 규제를 통해 기업의 재무적 건전성을 제고하면서 금융시장의 안정성을 높일 수 있다는 것이다.
Korean won overseas construction projects worth 71.6 billion US Dollars in 2010, which exceeded that of 2009 by 45.6%. An overseas construction project is a transaction of large scale, long term project, many parties participating, deferred payment, and of high-technology. It contributes to foreign currency earning, and also leads the nation's export restructuring work towards high value-added one. There are various kinds of risks towards the relevant parties respectively, which are key elements in successfully performing the overseas construction project. There are completion risk, financing risk, operating risk, revenue risk etc, in an employer's place. A contractor may be confronted with payment risk, issuance risk of performance bond, financing risk, performance risk of sub-contractors, and exchange rate risk. In lenders place there are repayment risk, completion risk, and political risk in the host country. In order to mitigate risks, the parties shall take relevant measures or require relevant securities. A contractor needs to evaluate the credibility of an employer in respect of payment risk, and can also request export insurance cover by the Korea Trade Insurance Corporation(the former 'Korea Export Insurance Corporation"). An employer can require a contractor to provide performance bond in respect of completion risk, and employ a well-known first class bank as a mandated arranger to arrange financing with regard to completion risk. Lenders needs to evaluate the credibility of an employer and accomplish feasibility study of the project. Lenders can request insurance cover from export credit agency. Once the parties assess the respective risks and obtain relevant securities, the project will be successfully completed. The success of the project will be sure to bring the parties involved enormous profits and another opportunity to participate in overseas construction project afterwards.
Recently, advanced countries assessment the risk of fire to prevent large-scale damage to high-rise buildings, In addition, performance-Based design, which is a fire risk assessment, is being conducted in Korea to prevent massive damage to high-rise buildings. However, unlike advanced countries, fire risk assessment in Korea is subject to fire risk assessment only for objects subject to consent from fire-fighting facilities such as building permits, When building engineers and fire-fighting engineers assessment the risk of fire, It has always been discussed because the results vary depending on which part of the evaluation is focused between economic feasibility and safety. Therefore, in this study, we would like to propose a fire risk assessment process suitable for domestic conditions by comparing the process of performance-based design, which is a domestic fire risk assessment, and the process of Iso/TC 16732 which is an overseas fire risk assessment.
Purpose: The purpose of this study is to analyze the effects of risk perception and opportunistic behavior on project performance and the moderating effect of cooperation in this relationship through literature review to identify factors affecting the performance of large-scale nuclear power plant construction projects. Methods: This study conducted a survey on nuclear power plant construction project participants and verified the hypothesis using statistical methods. Results: The results of this study are as follows; First, risk perception appeared to have a positive effect on opportunistic behavior, and it was confirmed that opportunistic behavior among participating companies could occur even in nuclear power plant construction projects. Second, it has been proven that risk perception has a negative effect on project performance as suggested in previous studies. Third, in the relationship between opportunistic behavior and project performance, it was found that opportunistic behavior had a negative effect on project performance. Finally, cooperation was found to have a moderating effect on the relationship between performance risk and project performance. Conclusion: This study is a case of empirical analysis targeting nuclear power plant construction project workers, and provided a basis for reference in future related academic research and project implementation.
Based on the IS literature on software project risk management, we developed an integrated model to investigate the risk factors and risk management factors in project development. We also analyzed the interrelation between project risk and project risk management. The questionaries are collected from 83 project leaders. We tested reliability and validity of the measure and analyzed the obtained data. The results support our risk-based hypothesis that shows the importance of risk management in reducing project risks and improving performance of project and process.
As the business environment becomes more rapid and unpredictable change, greater diversity, increased complexity, and intensified competitive pressures, supply chain risk management has been growing attention over the past several decades. However, little of known about how absorptive capacity can mitigate supply chain risk for improving operational performance despite its important role in responding to supply chain risk. Therefore, we aim to examine the role of organizational-level absorptive capacity on operational performance, and further identify how the interplay of individual-level and organizational-level absorptive capacity results in operational performance. Our results represent not only direct but also indirect effects of supply chain risk on operational performance, mediated by organizational-level absorptive capacity. Furthermore, this study reveals that individual-level absorptive capacity enhances the effect of organizational-level absorptive capacity on operational performance.
최근 국내외에서 도시재생사업이 활발히 진행되고 있다. 이러한 도시재생사업은 사업주체 및 이해관계자가 다양하고, 복잡하며, 대규모의 긴 생애주기를 가지고 있다. 또한 대부분 입체 복합공간 개발 형태의 메가프로젝트라는 특징을 나타내고 있다. 이러한 대규모의 도시재생사업은 사업수행과정에서 많은 위험요인들이 존재하며, 그와 더불어 효율적이고 지속적인 성과관리가 필요하다. 그러나 국내의 성과관리는 건설업의 특성을 반영하지 못하고 있으며, 위험과 연계된 연구는 미비하다. 그래서 본 연구는 효율적인 성과관리를 위한 위험과 연계된 성과측정지표를 도출하기 위한 기초연구로 맵핑(mapping)을 통해 성과측정을 위한 성과지표와 위험요인을 연계하는 방법을 제시하고자 한다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.