• Title/Summary/Keyword: Performance Indicator

Search Result 946, Processing Time 0.03 seconds

Correlation between the Position Accuracy of the Network RTK Rover and Quality Indicator of Various Performance Analysis Method (Network RTK 품질 분석 방법론별 성능 지표와 사용자 항법 정확도의 상관성)

  • Lim, Cheol-soon;Park, Byung-woon;Heo, Moon-beom
    • Journal of Advanced Navigation Technology
    • /
    • v.22 no.5
    • /
    • pp.375-383
    • /
    • 2018
  • In order to apply the Network RTK (real time kinematics) technology, which has been used for positioning of stationary points, to the navigation of vehicles, its infrastructure should provide correction data with a quality indicator that can show the expected accuracy in real time. In this paper, we analyzed various indicator generation algorithms such as I95 (ionospheric index 95) / G95 (geodetic index 95), SBI (semivariance based index) and RIU (residual interpolation uncertainty). We also applied them to the raw observables from the reference stations of National Geographic Information Institute and VRS (virtual reference station) users, and then examined its feasibility to be used as a real-time performance index of the Network RTK rover. 24 hour data analysis shows that the RIU index, which can represent the non-linearty of the correction, has the strongest correlation with the Network RTK rover accuracy. Therefore, RIU index is expected to be used as a real-time performance index of the Network RTK rover.

Development and Application of Performance Indicators to Estimate the Service Activities Relating with Water and Wastewater Works: Focus on Water Works Parts (상하수도 서비스 평가지표 개발 및 적용: 상수도 분야를 중심으로)

  • Choi, Tae-yong;Yoon, Yeo Cheon;Lee, Lan Jung;Kim, Duck-Jin;Jo, Jae Hong;Koo, Ja-yong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.20 no.3
    • /
    • pp.411-429
    • /
    • 2006
  • To improve Service quality for water and wastewater works, most water and wastewater utility effort to develop not only facility construction but also operation optimization. The operation is optimized by accurate estimation for ongoing situation. And from the accurate estimation, utility operator gain a information about their service quality and problems, So we developed a evaluation tool (Performance Indicators: PI) for service activity of water and wastewater works. The PI was developed in many countries and some international organizations (World Bank, IWA etc.) for service benchmarking. And ISO (international organization for standardization) just has been making a service standard for water and wastewater system (So called ISO/C224). This proceeding for making a service standard is ongoing now and will be launched in 2007. In our study, PI was composed of 6 parts (A human resource, facility management, operation, service quality, finance and environment). To evaluate water utilities, performance indicators for water was consisted of 100 items. Each 2 water utilities were estimated by this performance indicator. From the study, we just know that the performance indicator was a very useful tool to estimate utility service quality. And from the result, it is possible to know the strong and weak point of estimated utilities.

A Study on Plans for Diffusion & Revitalization, and Developing Key Performance Indicator for OSC based PC Structure Apartment Housing (OSC기반 PC구조 공동주택의 보급 및 활성화 방안과 핵심 성과 지표 개발 - 주체별 설문조사 분석결과를 중심으로 -)

  • Lee, Sungho;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.98-105
    • /
    • 2021
  • Recently, there have been many changes in the domestic construction industry. OSC (Off-Site Construction) is expected to solve these problems, and it is emerging as a way to inspire innovation in the domestic construction production system. OSC, which has only recently attracted attention again after previous studies have failed, is lacking in research on preception surveys and customized performance measurements compared to overseas. This study investigated the perceptions of construction industry workers on OSC through a survey, and examined differences in perceptions of each subject and the relative importance of performance indicators. In general, the need for introduction and development of OSC was recognized. Also, drivers and obstacles inhibiting more use of OSC were analyzed. The relative importance for performance indicators and differences in perceptions of each subject were identified. Then, this study suggests plans for diffusion and revitalization of OSC, and key performance indicator for OSC based PC structure apartment housing.

A Study on the Development and Application of Performance Indicators for the Information Service System at the Academic Libraries (대학도서관 정보봉사시스템 성과지표 개발과 적용에 관한 연구)

  • Nam, Tae-Woo;Lee, Mu-Jin
    • Journal of Information Management
    • /
    • v.40 no.1
    • /
    • pp.1-27
    • /
    • 2009
  • The study investigated the indicators for information service system performance measurement through the review on the related literatures, and developed 16 indicators for the performance measurement in 4 areas of library visit, lending, reference service and user instruction, and electronic service. And then with the indicators, the study surveyed 6 academic libraries including each 2 of large, middle, and small sized academic libraries. Based on the survey results, the study made a proposal for the application of performance indicator and the improvement of information service system performance.

How Can We Use Hospital-Standardized Mortality Ratio as a Quality Indicator of Hospital Care in Korea? (일반 질 지표로서의 병원 표준화 사망비에 대한 고찰)

  • Kim, Seon-Ha;Choi, Eun Young;Lee, Hyeon-Jeong;Ock, Minsu;Jo, Min-Woo;Lee, Sang-il
    • Health Policy and Management
    • /
    • v.27 no.2
    • /
    • pp.114-120
    • /
    • 2017
  • The hospital standardized mortality ratio (HSMR) is a widely used generic measure for assessing quality of hospital care in many countries. However, the validity of HSMR as a quality indicator is still controversial. We critically reviewed characteristics of HSMR and suggested how to use HSMR as a quality indicator in the Korean setting. The association between HSMR and other quality measures of hospital care is inconclusive. In addition current HSMR model has shortcomings in risk adjustment because of the lack of clinical data, accuracy of disease coding, coding variation among hospitals, end-of-life care issues, and so on. Therefore, HSMR should be used as an indicator for improvement, not for judgement such as public reporting and pay-for-performance. More efforts will be needed to tackle practical and methodological weaknesses of HSMR in the Korean setting.

Analysis of Causal Relationship between Patent Indicators and Firm Performance (특허지표와 기업 성과의 인과관계에 대한 분석)

  • Lim, Ji-Youn;Kim, Chul-Young;Gu, Ja-Chul
    • Korean Management Science Review
    • /
    • v.28 no.2
    • /
    • pp.63-74
    • /
    • 2011
  • As business environment has become more competitive, the R&D strategies of firms have been regarded more important. Patent has information about technology which affects a firm's profit and it is considered as resources which have provided appropriate data for research of innovations and trends in technology. And patent indicators are known as qualitative representation of technology quality in an objective view. Also, they are available for the continuous and systematic analysis. However, most previous studies have focused on developing patent indicators to investigate patent value and characteristics. Furthermore they have limitations that most results is not significant that patent indicators have effect on firm performance-Tobin's q, Intangible assets based on balance sheet, sales and etc. Thus, the purpose of this paper is to propose proper a factor to represent a firm performance and to analyze causal relationship between patent indicators and firm performance. Intangible assets based on market value are employed as one of most significant firm performance indicator. The results indicate that intangible assets are appropriate for analyzing causal relation between patent and a firm performance with 7 significant indicators among 10 patent indicators. Considering firm's exogenous factors, regression analysis of each data for five years is performed. This result is similar to regression analysis of full data for all years.

The Effects of Policy Funds for Small and Medium Enterprises (중소기업 정책자금 지원이 중소.벤처기업 재무성과에 미치는 영향 - 중소기업진흥공단 정책자금 지원을 중심으로 -)

  • Chae, Kwang-Ki;Yoon, Byung-Seop;Ha, Kyu-Soo
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.6 no.3
    • /
    • pp.85-107
    • /
    • 2011
  • This study analyzed the influence of supporting policy fund on financial performance of small & medium sized venture firms. The outcomes are as follows. First, it was found that 11 dependent variables in profitability, stability, activity, and growth represent have significantly positive influence on financial performances 4 years after policy fund rather than prior to the fund. In short, supporting policy fund is found to bring improvement on financial performance. Second, it was found that growth rate in asset as a growth indicator and interest coverage ratio as a stability indicator have significantly positive influence on operating income to sales and ROA, respectively. Third, it was found that operating income to sales as a profitability indicator and asset turnover ratio as an activity indicator have positive influence on current ratio. Finally operating income to sales as a profitability indicator and growth rate in sales as a growth indicator have positive influence on interest coverage ratio.

  • PDF

A Study on the Reformation Proposal of Post-Evaluation Indicator for Performance Measurement in the Public Construction (공공공사 성과측정을 위한 사후평가항목 개선방안에 관한 연구)

  • Lee, Eun-Ji;Kim, Kyung-Hwan;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.523-526
    • /
    • 2007
  • In Korea, the construction industry has been growing quantitatively because of its aggressive advances into overseas construction market and the Korean government's housing policy. Moreover, visions and goals such as 'construction industry promotion build up plan' have recently been promoted by the government while new strategic growth focused on competitiveness is gaining interests among the industry. However, there are a few problems in the construction performance. First, the specific performance measurement indicator or skills for the construction industry are hardly found in Korea. Currently, the finance or overall management system in the construction business are used as indicators to measure performances in not only the construction industry but all industries including the manufacturing industry. The government, the industry and universities recognized the need for the performance measurement indicator and skill and have developed and actively studied on them.

  • PDF

Using Analytic Network Process to Establish Performance Evaluation Indicators for the R&D Management Department in Taiwan's High-tech Industry

  • Liu, Pang-Lo;Tsai, Chih-Hung
    • International Journal of Quality Innovation
    • /
    • v.8 no.3
    • /
    • pp.156-172
    • /
    • 2007
  • The high-tech industry is the economic lifeline for Taiwan. Its characteristics are short product life cycle, rapid changes in the market, and a high obsolescence rate for new products. Under globalization, the high-tech industry has adopted Information Technology (IT) to shorten the manufacturing process, reduce costs and conduct product research and development (R&D) to increase the core competence of enterprises and achieve the goal of sustainable operations. Enterprises should actively strengthen their integration with internal and external resources and lead in R&D management to increase industrial operating performance. Effectively managing operations and R&D management evaluation in Taiwan's High-tech Industry has become a critical subject. This study adopted 4 major Balanced Scorecard (BSC) perspectives to establish the Total Performance Evaluation Indicators for the R&D management department in Taiwan's High-tech Industry. The Analytic Network Process (ANP) was applied to evaluate the overall performance of the R&D management department. The research framework is divided into 2 phases. The first phase is combined with the 4 major perspectives, Financial, Customer, Internal Business Process and Learning and Growth, as the related indicators for each measurement perspective. The Key Performance Indicators (KPI) were selected using Factor Analysis to identify the key factor from the complicated indicators. The relationship between the characteristics of each BSC's evaluation perspective is dependence and feedback. This study applied ANP to conduct the calculation and adjustment of correlation between each KPI, and determine on their relative weights for the objective KPI. The "Financial Perspective" for R&D management department in Taiwan's High-tech Industry focused on the budget achievement rate of R&D management. The weight indicator value is (0.05863). The "Customer Perspective" focused on problem-solving satisfaction. The weight value of this indicator is (0.17549). The "Internal Business Process Perspective" focused on the quantity and quality of R&D. The weight value of this indicator is (0.13506). The "Learning and Growth Perspective" focused on improving competence in the research personnel's professional techniques. The weight value of this indicator is (0.02789). From the total weighting indicators, the order of the Performance Indicators for the R&D management department in Taiwan's High-tech Industry is: (1) Customer Perspective; (2) Internal Business Process Perspective; (3) Financial Perspective; and (4) Learning and Growth Perspective.

Statistical Analysis of Work Performance Indicator (작업 성과지표의 통계적 분석 방법에 관한 연구)

  • Moon, Hyo-Gi;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.947-952
    • /
    • 2007
  • The construction project is composed of individual trade which is consists of each activity. and the performance of each activity is the lowest level to influence the project performance. Consequently, It is essential to measure and evaluate the performance of the each assignment. But the existing performance measurement have mainly focussed on company level and project level. Therefore, this paper select PPC as the indicator of a activity and, suggests the analysis method of indicators for a goal-oriented management and continuous improvement through a statistical control techniques.

  • PDF