• 제목/요약/키워드: Peak load management

검색결과 144건 처리시간 0.034초

원격제어 에어컨 개발 보급현황 및 향후전망 (A development of direct load control system for air-conditioner)

  • 강원구;김충환
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 D
    • /
    • pp.2446-2448
    • /
    • 2001
  • In addition to the stabilization of electricity supply and the quality management of electricity, load balance has been an important strategy for achieving high quality load management. Among many techniques for load management, direct load management has been actively studied and applied for increasing the efficiency of power facility and suppressing peak load. In Korea, the highest peak load is demanded in summer rather than in winter, and almost 50% of the peak load comes from cooling load. Currently, applicable systems are limited to air conditioners that have the cooling capacity less than 2kW. This paper describes the development of remote controlled air conditioners and the result of the field test of the new type air conditioner. The technical specification based on the test will be applied to the new model of the remote controlled air conditioner. The wide distribution of the air conditioners to the public will be helpful to control peak demand due to cooling load in summer time. Financial investment to generating, transmission, distribution facilities will be decreased from flatting the seasonal power load.

  • PDF

에어컨부하 직접제어시스템 실증시험 및 운용방안에 관한 연구 (The Study on the Field test and Operational Method of a Direct Load Control System for Air conditioner)

  • 강원구;김충환;김명수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 D
    • /
    • pp.2825-2827
    • /
    • 2000
  • In electric power industry. load balance has been one of the most fundamental and important management goals. Therefore. the strategy to achieve high quality load management now includes load balance besides the stabilization of electricity supply and quality management of electricity. Amongst many techniques of load management. direct load management has been actively studied and utilized to increase power facility and peak load suppression. Higher peak load situation is appeared during summer than during winter in Korea. and approximately 20% of the peak load is due to the load for air-conditioning. To cope with this peak load problem during summer KEPCO is performing a research project to develop a system to remotely control air-conditioning load using wireless communication. Currently, applicable facilities are limited to small-scale air-conditioning facility that has less than 2KW power capacity. This paper described the 1st year of efforts made in the study.

  • PDF

수용가 냉방부하를 고려한 하절기 주상변압기 최대부하 추정 (Peak Load Estimation of Pole-Transformer in Summer Season Considering the Cooling Load of Customer)

  • 윤상윤;김재철;김기현;임진순
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제50권1호
    • /
    • pp.20-27
    • /
    • 2001
  • In this paper, we propose a method for estimating the peak load of pole-transformer in summer season considering the degree of cooling load possession in customer. The cooling load of customer is selected as the most reliable parameter of peak load in summer season. The proposed estimation method is restricted to the aspect of load management for pole-transformer. The main concept of proposed method is that the error of peak load estimation using load regression equation reduces with considering the degree of cooling load possession in customer. We propose an index for estimation of cooling load possession in each customer. The proposed index is defined as cooling load possession in customer (CLPC) and obtained from the increment of monthly electric energy. The membership function for deciding the uncertainty of cooling load possession in customer is used. The database of pole-transformer in Korea Electric Power Corporation (KEPCO) is used for case studies. Through the case studies, we verify that the proposed method reduces the error of peak load estimation than the conventional method in domestic.

  • PDF

복합 퍼지모델을 이용한 디맨드 예측 제어에 관한 연구 (A Study on the Demand Forecasting Control using A Composite Fuzzy Model)

  • 김창일;성기철;유인근
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제51권9호
    • /
    • pp.417-424
    • /
    • 2002
  • This paper presents an industrial peak load management system for the peak demand control. Kohonen neural network and wavelet transform based techniques are adopted for industrial peak load forecasting that will be used as input data of the peak demand control. Firstly, one year of historical load data of a steel company were sorted and clustered into several groups using Kohonen neural network and then wavelet transforms are applied with Biorthogonal 1.3 mother wavelet in order to forecast the peak load of one minute ahead. In addition, for the peak demand control, composite fuzzy model is proposed and implemented in this work. The results are compared with those of conventional model, fuzzy model and composite model, respectively. The outcome of the study clearly indicates that the composite fuzzy model approach can be used as an attractive and effective means of the peak demand control.

단기 전력우급계획에서의 부하관리 효과 분석연구 (The Analysis of Load Management Effect in Shor-Term Generation Expansion Planning)

  • 김준현;정도영
    • 대한전기학회논문지
    • /
    • 제41권9호
    • /
    • pp.994-1002
    • /
    • 1992
  • With regard to price elasticity and cross elasticity of electricity, optimal generation expansion planning method including load management effect is suggested. In addition, optimal peak time price can be determined simultaneously, and we adopt peak time tariff as load management strategy. Instead of using hourly marginal demand curves where we can get customer surplus, we used chronological load curve with constraints to preserve social welfare. This method is proved useful in short-term generation expansion planning.

  • PDF

부하관리 요금제 피크억제량 산정 개선방안 연구 (An Evaluation of Peak-Load Management in DSM Programs)

  • 김진호;홍준희
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.572-573
    • /
    • 2008
  • Demand side management can be defined as series of planning and programs to change the electric usage pattern of customers from their normal ones with a least cost while meeting customers electric demand. In general, conventional demand side management programs can be classified into two groups, one of which is a load management and the other is energy efficiency. In this paper, the load management tariff programs in Korea are explored in terms of their effect on the peak demand reduction.

  • PDF

전력(電力) 부하평준화(負荷平準化) 방안(方案) (The Suggested Methods for Electric Load Flattening)

  • 조규승;윤갑구
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1985년도 하계학술회의논문집
    • /
    • pp.144-147
    • /
    • 1985
  • In electricity industry, the improvement of load factor by flattening of load has been considered to be more important than any other tasks and has received wide concern and interest. Especially while annual peak load had occured early evening in winter during past decades, but we found the trend has changed so that annual peak load occured during the daytime in summer since1981 The useful practicing methods of this load management ale as follows; 1. Inducing of midnight load by thermal storage water heating 2. Seasonal differential rates. 3. Revising the peak load priceing (Time-of -use) It seems hard to expect that load research can be carried out in a short time, and we all have to exert outselves continuously to provide efficient load management method without wasting resources.

  • PDF

주상 변압기 최대부하 추정을 위한 부하상관계수 및 수용율 조정 (Adjustment of Load Regression Coefficients and Demand-Factor for the Peak Load Estimation of Pole-Type Transformers)

  • 윤상윤;김재철;박경호;문종필;이진;박창호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권2호
    • /
    • pp.87-96
    • /
    • 2004
  • This paper summarizes the research results of the load management for pole transformers done in 1997-1998 and 2000-2002. The purpose of the research is to enhance the accuracy of peak load estimation in pole transformers. We concentrated our effort on the acquisition of massive actual load data for modifying the load regression coefficients, which related to the peak load estimation of lamp-use customers, and adjusting the demand-factor coefficients, which used for the peak load prediction of motor-use customers. To enhance the load regression equations, the 264 load data acquisition devices are equipped to the sample pole transformers. For the modification of demand factor coefficients, the peak load currents are measured in each customer and pole transformer for 13 KEPCO (Korea Electric Power Corporation) distribution branch offices. Case studies for 50 sample pole transformers show that the proposed coefficients could reduce estimating error of the peak load for pole transformers, compared with the conventional one.

부하관리 개선을 위한 부하 상관계수 산정에 관한 연구 (Adjustment of load correlation coefficient for advanced load management)

  • 박창호;조성수;김기현;임진순;김두봉;김재철
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 C
    • /
    • pp.1267-1269
    • /
    • 1999
  • This paper studies on arrangement of load correlation coefficient for advanced load management. To accurate load correlation coefficient, we used two real factors, electrical energy(kWh) and peak load current of pole transformers, acquired by measuring instrument. Out of several correlation equations, we find that the quadratic equation is the most accurate to express peak load current and working electrical energy. If the data is located in the outside of ${\pm}3{\sigma}$ it is discarded. For load management, we rearranged load correlation coefficient considering +2${\sigma}$ at load correlation equation. Comparing conventional load correlation coefficient with rearranged one, we can get the result of error reduced and it is adjacent to the actual data. It will be used peak load forecasting from working electrical energy and we are able to prevent from the damaging of pole transformer due to overload.

  • PDF

전력계통 Peak-Shaving 성능향상을 위한 1일 부하곡선 생성 (Generation of Daily Load Curves for Performance Improvement of Power System Peak-Shaving)

  • 손수빈;송화창
    • 한국지능시스템학회논문지
    • /
    • 제24권2호
    • /
    • pp.141-146
    • /
    • 2014
  • 본 논문은 Peak Shaving 알고리즘의 성능 향상을 위한 예측 부하 곡선의 생성의 한 방법을 제시한다. 여기서 논하는 Peak Shaving 알고리즘은 대용량의 배터리 에너지 저장시스템 (BESS, Battery Energy Storage System)을 위한 PMS (Power Management System)의 장주기 스케쥴링 알고리즘을 의미한다. 위의 PMS는 주로 배터리에서 에너지의 입출력을 제어하는 데에 주목적이 있다. 이를 위해서 Peak Shaving 알고리즘이 사용되는데, 여기서 예측 부하곡선과 실제 부하곡선 사이의 불확실성이 나타난다. 원활한 에너지의 충,방전을 위하여 본 논문에서는 주 단위의 표준화 방법과 계절별 부하의 특성을 고려한 예측 부하 곡선 생성 방법을 제안한다.