• 제목/요약/키워드: Peak load

검색결과 1,230건 처리시간 0.025초

2004년 하계 첨두부하 시 계통운영 실적 분석 (The Analysis of 2004 Summer Peak Load in Korea Power system)

  • 송태용;황봉환
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.113-115
    • /
    • 2004
  • This year korea power system had recorded highest peak load for 6 times and finally it made new peak load 51,264MW at July 29th 3:00 PM. The new peak load is increased 8.2% from the last year peak load 47,385MW and korea power system entered 50,000MW load era. The Korea Power Exchange (KPX) snapped power system data at the peak load time using state estimation function in the EMS. And authors converted the power system data at peak load to PSS/E power flow format. Using this PSS/E peak load power flow data, this paper explains demand analysis result shun capacitor operation, voltage distribution at the peak load. And the paper shows the simulation result of 2 contingency analysis using the snapped PSS/E peak load data.

  • PDF

건물의 외주부 존에 대한 동적 부하모델 이용 피크냉방부하 저감효과 분석 (Evaluation on Reducing Peak Cooling Load Based on Dynamic Load Model of Building Perimeter Zones)

  • 이경호
    • 한국태양에너지학회 논문집
    • /
    • 제31권4호
    • /
    • pp.1-8
    • /
    • 2011
  • In this paper, inverse building modeling was applied to building perimeter zones which have different window orientation. Two test zones of east-facing and west-facing zones in ERS(Energy Resource Station) building, which is representative of small commercial building, was used to test performance of cooling load calculation and peak cooling load reduction. The dynamic thermal load model for the east and west zone was validated using measured data for the zones and then it was used to investigate the effect of peak cooling load reduction by adjustment of indoor cooling temperature set points during on-peak time period. For the east zone, the peak load can be reduced to about 60% of the peak load for conventional control even without any precooling. For the west zone, PLR is nearly independent of the start of the on-peak period until a start time of 1pm. Furthermore, PLR has a small dependence on the precooling duration. Without any precooling, the peak cooling load can be reduced to about 35% of the peak load associated with conventional control.

TCN 딥러닝 모델을 이용한 최대전력 예측에 관한 연구 (A Study on Peak Load Prediction Using TCN Deep Learning Model)

  • 이정일
    • 정보처리학회논문지:소프트웨어 및 데이터공학
    • /
    • 제12권6호
    • /
    • pp.251-258
    • /
    • 2023
  • 안정적으로 전력을 공급하고 전력계통을 운영하기 위해서는 최대전력을 정확히 예측해야 한다. 특히, 최대전력이 높게 발생하는 겨울과 여름에는 그 중요성이 매우 커진다. 최대전력을 실제 수요보다 높게 예측하면 발전소 기동 비용이 증가하여 경제적 손실이 발생하고, 최대전력을 실제 수요보다 낮게 예측하면 기동이 가능한 발전소가 부족하여 정전이 발생할 수 있다. 최대전력의 예측 오차를 최소화함으로써 경제적 손실과 정전을 예방할 수 있다. 본 논문에서는 최대전력 예측의 오차를 최소화하기 위하여 최신 딥러닝 모델인 TCN을 이용한다. 딥러닝 모델은 하이퍼 파라미터를 어떻게 설정하느냐에 따라 성능 차이가 발생하므로, TCN의 하이퍼 파라미터를 최적화하는 방법을 제안한다. 2006년부터 2021년까지의 데이터를 입력하여 모델을 훈련하고, 2022년의 데이터를 이용하여 예측 오차를 실험하였다. 실험을 수행한 결과 본 논문에서 제안한 최적화 방법을 이용한 TCN 모델의 성능이 다른 딥러닝 모델보다 성능이 우수한 것을 확인하였다.

주상 변압기 최대부하 추정을 위한 부하상관계수 및 수용율 조정 (Adjustment of Load Regression Coefficients and Demand-Factor for the Peak Load Estimation of Pole-Type Transformers)

  • 윤상윤;김재철;박경호;문종필;이진;박창호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권2호
    • /
    • pp.87-96
    • /
    • 2004
  • This paper summarizes the research results of the load management for pole transformers done in 1997-1998 and 2000-2002. The purpose of the research is to enhance the accuracy of peak load estimation in pole transformers. We concentrated our effort on the acquisition of massive actual load data for modifying the load regression coefficients, which related to the peak load estimation of lamp-use customers, and adjusting the demand-factor coefficients, which used for the peak load prediction of motor-use customers. To enhance the load regression equations, the 264 load data acquisition devices are equipped to the sample pole transformers. For the modification of demand factor coefficients, the peak load currents are measured in each customer and pole transformer for 13 KEPCO (Korea Electric Power Corporation) distribution branch offices. Case studies for 50 sample pole transformers show that the proposed coefficients could reduce estimating error of the peak load for pole transformers, compared with the conventional one.

중량물 들기 작업시 물체 무게중심 및 발의 위치가 허리 근육의 최대 EMG 진폭에 미치는 영향 (Effects of Load Center of Gravity and Feet Positions on Peak EMG Amplitude at Low Back Muscles While Lifting Heavy Materials)

  • 김선욱;한승조
    • 한국산업보건학회지
    • /
    • 제22권3호
    • /
    • pp.257-264
    • /
    • 2012
  • Objectives: This study's aims were to evaluate the effects of load center of gravity within an object lifted and feet placements on peak EMG amplitude acting on bilateral low back muscle groups, and to suggest adequate foot strategies with an aim to reducing low back pain incidence while lifting asymmetric load. Methods: The hypotheses that asymmetric load imposes more peak EMG amplitude on low back muscles contralateral to load center of gravity than symmetric load and maximum peak EMG amplitude out of bilateral ones can be relieved by locating one foot close to load center of gravity in front of the other were established based on biomechanics including safety margin model and previous researches. 11 male subjects were required to lift symmetrically a 15.8kg object during 2sec according to each conditions; symmetric load-parallel feet (SP), asymmetric load-parallel feet (AP), asymmetric load-one foot contralateral to load center of gravity in front of the other (AL), and asymmetric load-one foot ipsilateral to load center of gravity in front of the other (AR). Bilateral longissimus, iliocostalis, and multifidus on right and left low back area were selected as target muscles, and asymmetric load had load center of gravity 10cm deviated to the right from the center in the frontal plane. Results: Greater peak EMG amplitude in left muscle group than in right one was observed due to the effect of load center of gravity, and mean peak EMG amplitudes on both sides was not affected by load center of gravity because of EMG balancing effect. However, the difference of peak EMG amplitudes between both sides was significantly affected by it. Maximum peak EMG amplitude out of both sides and the difference of peak EMG amplitude between both sides could be reduced with keeping one foot ipsilateral to load center of gravity in front of the other while lifting asymmetric load. Conclusions: It was likely that asymmetric load lead to the elevated incidence of low back pain in comparison with symmetric load based on maximum peak EMG amplitude occurrence and greater imbalanced peak EMG amplitude between both sides. Changing feet positions according to the location of load center of gravity was suggested as one intervention able to reduce the low back pain incidence.

수용가 냉방부하를 고려한 하절기 주상변압기 최대부하 추정 (Peak Load Estimation of Pole-Transformer in Summer Season Considering the Cooling Load of Customer)

  • 윤상윤;김재철;김기현;임진순
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제50권1호
    • /
    • pp.20-27
    • /
    • 2001
  • In this paper, we propose a method for estimating the peak load of pole-transformer in summer season considering the degree of cooling load possession in customer. The cooling load of customer is selected as the most reliable parameter of peak load in summer season. The proposed estimation method is restricted to the aspect of load management for pole-transformer. The main concept of proposed method is that the error of peak load estimation using load regression equation reduces with considering the degree of cooling load possession in customer. We propose an index for estimation of cooling load possession in each customer. The proposed index is defined as cooling load possession in customer (CLPC) and obtained from the increment of monthly electric energy. The membership function for deciding the uncertainty of cooling load possession in customer is used. The database of pole-transformer in Korea Electric Power Corporation (KEPCO) is used for case studies. Through the case studies, we verify that the proposed method reduces the error of peak load estimation than the conventional method in domestic.

  • PDF

신경망과 퍼지시스템을 이용한 일별 최대전력부하 예측 (Daily Peak Electric Load Forecasting Using Neural Network and Fuzzy System)

  • 방영근;김재현;이철희
    • 전기학회논문지
    • /
    • 제67권1호
    • /
    • pp.96-102
    • /
    • 2018
  • For efficient operating strategy of electric power system, forecasting of daily peak electric load is an important but difficult problem. Therefore a daily peak electric load forecasting system using a neural network and fuzzy system is presented in this paper. First, original peak load data is interpolated in order to overcome the shortage of data for effective prediction. Next, the prediction of peak load using these interpolated data as input is performed in parallel by a neural network predictor and a fuzzy predictor. The neural network predictor shows better performance at drastic change of peak load, while the fuzzy predictor yields better prediction results in gradual changes. Finally, the superior one of two predictors is selected by the rules based on rough sets at every prediction time. To verify the effectiveness of the proposed method, the computer simulation is performed on peak load data in 2015 provided by KPX.

복합 퍼지모델을 이용한 디맨드 예측 제어에 관한 연구 (A Study on the Demand Forecasting Control using A Composite Fuzzy Model)

  • 김창일;성기철;유인근
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제51권9호
    • /
    • pp.417-424
    • /
    • 2002
  • This paper presents an industrial peak load management system for the peak demand control. Kohonen neural network and wavelet transform based techniques are adopted for industrial peak load forecasting that will be used as input data of the peak demand control. Firstly, one year of historical load data of a steel company were sorted and clustered into several groups using Kohonen neural network and then wavelet transforms are applied with Biorthogonal 1.3 mother wavelet in order to forecast the peak load of one minute ahead. In addition, for the peak demand control, composite fuzzy model is proposed and implemented in this work. The results are compared with those of conventional model, fuzzy model and composite model, respectively. The outcome of the study clearly indicates that the composite fuzzy model approach can be used as an attractive and effective means of the peak demand control.

고속철도 변전소 피크부하 저감용 ESS 일간 운전 프로그램 개발 (Development of Daily Operation Program of Battery Energy Storage System for Peak Shaving of High-Speed Railway Substations)

  • 변길성;김종율;김슬기;조경희;이병곤
    • 전기학회논문지
    • /
    • 제65권3호
    • /
    • pp.404-410
    • /
    • 2016
  • This paper proposed a program of an energy storage system(ESS) for peak shaving of high-speed railway substations The peak shaving saves cost of equipment and demand cost of the substation. To reduce the peak load, it is very important to know when the peak load appears. The past data based load profile forecasting method is easy and applicable to customers which have relatively fixed load profiles. And an optimal scheduling method of the ESS is helpful in reducing the electricity tariff and shaving the peak load efficiently. Based on these techniques, MS. NET based peak shaving program is developed. In case study, a specific daily load profile of the local substation was applied and simulated to verify performance of the proposed program.

피크부하용 혼소엔진발전의 경제성 분석 (An Economic Analysis on Dual-fuel Engine Generation for Peak Load)

  • 이옥배;안재경
    • 전기학회논문지
    • /
    • 제61권9호
    • /
    • pp.1260-1268
    • /
    • 2012
  • Recently, lack of power reserve margin was observed quite often. In this paper, we studied the method to secure power source for a short time, to cut the utility power peak load, and to reduce the users electricity bills. Emergency diesel generator of an office building is to be converted into a dual-fuel engine generator which is responsible for a portion of the peak load. Compared to the conventional diesel fuel generator, the proposed dual-fuel engine is able to reduce the generation power cost by dual-fuel combustion, and it also mitigates the building's utility power peak load by charging the building's peak load. If the dead resources (a group of emergency dual-fuel engine generators), as a Virtual Power Plant, are operating in peak time, we can significantly reduce future large power development costs. We investigated the current general purpose electricity bills as well as the records of the building electric power usage, and calculated diesel engine generator renovation costs, generation fuel costs, driving conditions, and savings in electricity bills. The proposed dual-fuel engine generation method reduces 18.1% of utility power peak load, and turned out to be highly attractive investment alternative which shows more than 27% of IRR, 76 million won of NPV, and 20~53 months of payback periods. The results of this study are expected to be useful to developing the policy & strategy of the energy department.