• 제목/요약/키워드: Peak Power

검색결과 2,641건 처리시간 0.039초

2004년 하계 첨두부하 시 계통운영 실적 분석 (The Analysis of 2004 Summer Peak Load in Korea Power system)

  • 송태용;황봉환
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.113-115
    • /
    • 2004
  • This year korea power system had recorded highest peak load for 6 times and finally it made new peak load 51,264MW at July 29th 3:00 PM. The new peak load is increased 8.2% from the last year peak load 47,385MW and korea power system entered 50,000MW load era. The Korea Power Exchange (KPX) snapped power system data at the peak load time using state estimation function in the EMS. And authors converted the power system data at peak load to PSS/E power flow format. Using this PSS/E peak load power flow data, this paper explains demand analysis result shun capacitor operation, voltage distribution at the peak load. And the paper shows the simulation result of 2 contingency analysis using the snapped PSS/E peak load data.

  • PDF

Study of Peak Load Demand Estimation Methodology by Pearson Correlation Analysis with Macro-economic Indices and Power Generation Considering Power Supply Interruption

  • Song, Jiyoung;Lee, Jaegul;Kim, Taekyun;Yoon, Yongbeum
    • Journal of Electrical Engineering and Technology
    • /
    • 제12권4호
    • /
    • pp.1427-1434
    • /
    • 2017
  • Since the late 2000s, there has been growing preparation in South Korea for a sudden reunification of South and North Korea. Particularly in the power industry field, thorough preparations for the construction of a power infrastructure after reunification are necessary. The first step is to estimate the peak load demand. In this paper, we suggest a new peak demand estimation methodology by integrating existing correlation analysis methods between economic indicators and power generation quantities with a power supply interruption model in consideration of power consumption patterns. Through this, the potential peak demand and actual peak demand of the Nation, which experiences power supply interruption can be estimated. For case studies on North Korea after reunification, the potential peak demand in 2015 was estimated at 5,189 MW, while the actual peak demand within the same year was recorded as 2,461 MW. The estimated potential peak demand can be utilized as an important factor when planning the construction of power system facilities in preparation for reunification.

전력선통신을 이용한 소규모 주택용 맞춤형 전력피크 제어시스템 개발 (Development of Adaptive Home Power Peak-Cut Control System Using Power Line Communication)

  • 김상동;박지호;김동완
    • 전기학회논문지
    • /
    • 제65권1호
    • /
    • pp.219-226
    • /
    • 2016
  • In this paper, adaptive home power peak-cut control system is developed using PLC. The developed scheme provides monitoring of power usage, power peak-cut control and additional function. In test bed, zone is presented by bedroom, living room, kitchen and bathroom. And individual load is presented by lighting, heater and fan in zone. In developed scheme, zone control is implemented by single PLC modem. And individual load control is implemented by key-map table. In addition, power peak-cut control system S/W, which can perform setting of power peak, power peak-cut control and monitoring of power usage.

Dynamic Load Profile 조건의 전원 장치에 있어서 계통 Peak Power 제한/보상 전력 회로 (Grid Peak Power Limiting / Compensation Power Circuit for Power Unit under Dynamic Load Profile Conditions)

  • 정희성;박도일;이용휘;이창현;노정욱
    • 전력전자학회논문지
    • /
    • 제27권5호
    • /
    • pp.376-383
    • /
    • 2022
  • The improved performance of computer parts, such as graphic card, CPU, and main board, has led to the need for power supplies with a high power output. The dynamic load profile rapidly changes the usage of power consumption depending on load operations, such as PC power and air conditioner. Under dynamic load profile conditions, power consumption can be classified into maximum, normal, and standby power. Several problems arise in the case of maximum power. Peak power is generated at the system power source in the maximum-power situation. Frequent generation of peak power can cause high-frequency problems and reduce the life of high-pressure parts (especially high-pressure capacitors). For example, when a plurality of PCs are used, system overload occurs due to peak power generation and causes problems, such as power failure and increase in electricity bills due to exceeded contract power. To solve this problem, a system peak power limit/compensation power circuit is proposed for a power supply under dynamic load profile conditions. The proposed circuit detects the system current to determine the power situation of the load. When the system current is higher than the set level, the circuit recognizes that the system current generates peak power and compensates for the load power through a converter using a super capacitor as the power source. Thus, the peak power of loads with a dynamic load profile is limited and compensated for, and problems, such as high-frequency issues, are solved. In addition, the life of high-pressure parts is increased.

Utility Interactive PV Systems with Power Shaping Function for Increasing Peak Power Cut Effect

  • Choe, Gyu-Ha;Kim, Hong-Sung;Heo, Hye-Seong;Jeong, Byong-Hwan;Choi, Young-Ho;Kim, Jae-Chul
    • Journal of Power Electronics
    • /
    • 제8권4호
    • /
    • pp.371-380
    • /
    • 2008
  • This paper describes the Utility Interactive PV (UIPV) system which can improve the peak-cut effect by adding an energy storage device of batteries to the power converter. The proposed system has three possible operation modes depending on relative condition of PV output, which can have the power shaping function covering the peak power for 3 hours. A new power circuit and an application algorithm have been applied to the UIPV system which is based on working PV system during a 3-hour peak time. The energy relationship by the proposed system is analyzed theoretically and experimentally. The proposed system is evaluated at the viewpoint of cost and total spacing, which enables the proposed UIPV system to have the reduction of the peak power demand and hence to improve the power capacity of peak cut.

상전원의 피크치 전력 감소를 위한 전력병합장치 회로설계 (Circuit Design of Parallel Power Operation Equipment for Peak Power Reduction)

  • 양재수;김동한;김만도
    • 정보처리학회논문지:컴퓨터 및 통신 시스템
    • /
    • 제3권9호
    • /
    • pp.273-278
    • /
    • 2014
  • 최근 전력의 수요공급 불균형으로 전력사용 피크시간대의 전력사용 강제 제한이 불가피하다. 따라서, 본 논문에서는, 피크전력이 발생하지 않는 시간대의 전기를 저장하고 전력부족이 예상되는 피크전력 시간대에는 저장전력을 공급하는 병렬운전 기기의 회로를 설계하는데 있다. 이 회로설계를 통하여, PRS의 핵심기능인 상용전원과 인버터 발생전원의 병렬연결 운용으로, 상용전원의 피크치 전력을 조절할 수 있었다. 또한 효율을 높이기 위하여 Transless Power Circuit DC-AC 인버터를 개발하였다. 더 나아가, 가변임피던스 제어를 적용하여 무정전 전원장치의 저장전력을 상용전원과 연계함으로써, 기존의 무정전 전원장치에서 구현을 못하고 있는 저장전력 사용시간을 획기적으로 늘릴 수 있는 기술구현 가능성을 입증하였다.

유도 브릴루앙 산란에 의한 펄스 압축 과정에서의 Peak Power 반사율과 위상공액도 (Peak Power Reflectivity and Phase Conjugation Fidelity in a Pulse Compression Process by Stimulated Brillouin Scattering)

  • 조민식;최병일;남창희
    • 한국광학회지
    • /
    • 제5권1호
    • /
    • pp.37-44
    • /
    • 1994
  • 유도 브릴루앙 반사광을 고출력 레이저에 응용할 때 요구되는 반사광 특성이 실험적으로 조사되었다. 집속 렌즈의 초점거리에 따른 유도 브릴루앙 반사광의 peak power 반사율과 위상공액도가 측정되었다. 또한 반사광 가운데 펄스압축된 부분만의 위상공액도가 측정되었다. 초점거리가 긴 경우(f=100cm) 반사광의 peak power가 입사광의 약 2배에 이르렀다. 이때 반사광 중에서 압축된 선두펄스만의 위상공액도는 약 90%로 다른 시간의 펄스보다 위상공액도가 우수했다. 공간적으로는 유도 브릴루앙 이득이 가장 큰 광축부분의 바사관이 최대의 펄스압축, peak power 반사율, 위상공액도를 보여서 유도 브릴루앙 산란을 응용할 때 가장 유용한 부분으로 확인되었다.

  • PDF

피크부하용 혼소엔진발전의 경제성 분석 (An Economic Analysis on Dual-fuel Engine Generation for Peak Load)

  • 이옥배;안재경
    • 전기학회논문지
    • /
    • 제61권9호
    • /
    • pp.1260-1268
    • /
    • 2012
  • Recently, lack of power reserve margin was observed quite often. In this paper, we studied the method to secure power source for a short time, to cut the utility power peak load, and to reduce the users electricity bills. Emergency diesel generator of an office building is to be converted into a dual-fuel engine generator which is responsible for a portion of the peak load. Compared to the conventional diesel fuel generator, the proposed dual-fuel engine is able to reduce the generation power cost by dual-fuel combustion, and it also mitigates the building's utility power peak load by charging the building's peak load. If the dead resources (a group of emergency dual-fuel engine generators), as a Virtual Power Plant, are operating in peak time, we can significantly reduce future large power development costs. We investigated the current general purpose electricity bills as well as the records of the building electric power usage, and calculated diesel engine generator renovation costs, generation fuel costs, driving conditions, and savings in electricity bills. The proposed dual-fuel engine generation method reduces 18.1% of utility power peak load, and turned out to be highly attractive investment alternative which shows more than 27% of IRR, 76 million won of NPV, and 20~53 months of payback periods. The results of this study are expected to be useful to developing the policy & strategy of the energy department.

ELM을 이용한 일별 최대 전력 수요 예측 알고리즘 개발 (Development of Daily Peak Power Demand Forecasting Algorithm using ELM)

  • 지평식;김상규;임재윤
    • 전기학회논문지P
    • /
    • 제62권4호
    • /
    • pp.169-174
    • /
    • 2013
  • Due to the increase of power consumption, it is difficult to construct an accurate prediction model for daily peak power demand. It is very important work to know power demand in next day to manage and control power system. In this research, we develop a daily peak power demand prediction method based on Extreme Learning Machine(ELM) with fast learning procedure. Using data sets between 2006 and 2010 in Korea, the proposed method has been intensively tested. As the prediction results, we confirm that the proposed method makes it possible to effective estimate daily peak power demand than conventional methods.

첨두부하 삭감효과를 갖는 UIPV시스템의 개선된 운용방법 (Improved Operating Method of Utility Interactive PV System for Peak Power Cut Effect)

  • 김영식;바이스갈랑;허혜성;최규하
    • 전력전자학회논문지
    • /
    • 제14권5호
    • /
    • pp.415-422
    • /
    • 2009
  • 본 논문은 기존의 시스템에 비해 시스템의 전력회로 구조의 큰 변경 없이 밧데리와 같은 전력저장 장치 디바이스의 추가와 개선된 운용방법을 적용한 첨두부하 삭감효과를 갖는 계통연계형 태양광발전시스템(UIPV)을 제안하였다. 개선된 운용방법과 에너지 저장장치의 추가로 기존 시스템에 비해 PV-array 용량을 작게 설치하여도 첨두부하 삭감효과를 크게 할 수 있으며, 가격 및 설치공간 등의 면에서 평가하여 기존시스템보다 더 나아짐을 확인하였다.