• Title/Summary/Keyword: Park facility

Search Result 2,349, Processing Time 0.03 seconds

Organizational Reform for the Successful Implementation of Infrastructure Asset Management using Balanced Score Cards (균형성과지표를 활용한 사회기반시설 자산관리 조직 개선 방안)

  • Chae, Myung Jin;Park, Ha Jin;Lee, Gu;Lee, Geon Hee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.6D
    • /
    • pp.745-752
    • /
    • 2009
  • Management of social infrastructure has been advanced from facility management (FM) to asset management (AM), which adopts the aggressive and proactive methods in predicting the deterioration of infrastructure, prevents failures, and eventually saves maintenance cost. Infrastructure asset management is not a simple engineering technique, but it is a new paradigm evolved from facility management practices. To implement the infrastructure asset management successfully, organizational reform is very important. This paper suggests critical success factors and key performance indicators to implement the infrastructure asset management for facility managers of government owned social infrastructures such as roads and bridges. Reorganizing the facility management group requires new vision, objectives, strategies for the paradigm-changing asset management. This paper uses Balanced Score Card (BSC) which is a proven method in measuring and setting new objectives for an organization. Once the performance indicators are reviewed repeatedly by facility managers through experts workshops, developed BSC can be used in practice. This paper discusses the development of robust BSC scoring method through in depth literature reviews and investigation of asset management practices of domestic and international cases.

A Development of Criteria for Evaluating School Zone by Utilizing Analytic Network Process (네트워크분석법(ANP)을 이용한 어린이보호구역 평가항목 개발)

  • Jeong, Kwang Seop;Kim, Tae Ho;Park, Je Jin;Won, Jai Mu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.2D
    • /
    • pp.191-197
    • /
    • 2009
  • This study choose the Criteria by conducting survey questionnaire of expertise, ANP analysis, and reviewing literature to samples of School Zone in a synthetic and reasonable way. It draws the estimating factors including a variety of existing aspects (user, facility, operation and management, and education and institution) from the analyses and applies ANP to reflect the decision making process. The results show as follows: first, first level of weights presents proportion of 'facility' and 'user' takes 65% of total weights. It implies that the facility protects children from obstacles is the top priority of the settings. second, the second level of weights present similar importance with the first level. Facility management, road to school, surroundings, safety facility, decelerating facility hold approximately 72% of overall levels. This indicates that improving and repairing surroundings, and safety and decelerating facility are the first priority to consider. These estimating indicators will be properly utilized to rationally appoint prevention zone with reflecting various factors and social class.

Investigation on the operational state of the public food waste treatment facilities and suggestions on their efficient operational management (음식물류폐기물 공공 자원화시설의 운영실태 조사를 통한 처리공정별 효율적인 운영방안 검토)

  • Jang, Yun-Hyeok;Park, Joon-Seok;Kim, Joung-Dae;Phae, Chae-Gun
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.18 no.1
    • /
    • pp.47-56
    • /
    • 2010
  • At present, 265 national food waste recycling facilities have been operated by public facilities 95 and private facilities 160. it has continuously installed a food waste treatment facility from 1997. The government set up and implemented guidelines and inspection standards for the installation and operation of the facilities. However, unclear detailed examination items, designs and process standards for the installation procedures of the facilities are causing problems due to the unskilled operation management system, decrease in efficiency and defects of a facility. This study conducted mail and site surveys on 95 public food waste recycling facilities that it suggest the ways to operate facilities which minimize problems. At the result of investigation, a pre-treatment facility was not installed 2 systems(2 inputting facilities) and hopper covers and food was overloaded. also the transportation amount was excessive. In case of a main treatment facility, the secondary environmental pollution was caused by inexperienced operation and the efficiency of the facility was reduced due to excessive input of food. also the operation management standards of the facilities were inappropriate. The odor and food waste leachate treatment facility is investigated as problems that are unskilled operation, lack of regular inspection and inappropriate capacity of the treatment facility. Based on the problems found through the investigation, it suggested some ways of efficient operation. this study might contribute to minimize mistakes and defects and improve the efficiency of install and operation course of food waste recycling facilities through finding.

Comparison of the unit mass discharge from wastewater treatment facility in the industrial park with the estimation methods (산업단지 폐수발생량 원단위 산정 비교연구)

  • Kim, Joon-Yup;Choi, Kyoung-Sik
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.28 no.3
    • /
    • pp.339-344
    • /
    • 2014
  • The predictive capacity of wastewater treatment facility in the industrial park was estimated by the traditional method and on-the-spot survey such as certification of wastewater report and the invoices of water supply and ground water supply. The ratios of a converted wastewater to supplied industrial water between traditional method and on-the-spot survey in the estimation methods were different. By using traditional method, the business type of clothes, accessary and fur production had 77.18 % of waste ratio of wastewater and $10.72m^3/day{\cdot}1000m^2$ unit mass of wastewater as the highest among 9 business types. With the respect to the on-the-spot survey, food manufacturing business type had 75 % of waste ratio of wastewater and $8.35m^3/day{\cdot}1000m^2$ unit mass of wastewater as the highest values. The amount of wastewater from on-the-spot survey method was 541 $m^3/day$ less than one from traditional method.

Design Improvement for the Cooling System of the Interim Spent Fuel Storage Facility Using a PSA Method

  • Ko, Won-Il;Park, Jong-Won;Park, Seong-Won;Lee, Jae-Sol;Park, Hyun-Soo
    • Nuclear Engineering and Technology
    • /
    • v.28 no.5
    • /
    • pp.440-451
    • /
    • 1996
  • With emphasis on safety, this study addresses for better design condition for the cooling system in a wet-type interim spent fuel storage facility, using a probabilistic safety assessment method. To incorporate the design renovation into the design phase, a simple approach is proposed. By taking the cooling system of a reference design, a fault tree analysis was performed to identify the weak point of the considered system, and then basic factors for design renovation were defined. A total of 21 design alternatives were selected through the combination of the basic factors. Finally, the optimum design alternative for the cooling system is derived by means of the cost and effect analysis based on the estimated cost, system reliability and assumed probabilistic safety criteria. With the assumption that the failure frequency of at-reactor spent fuel cooling system compiles with probabilistic safety criteria for the interim spent fuel cooling system, it was shown that the optimum alternative should have l00% cooling loop redundancy with one pump per cooling loop and a cleanup system installed separately from the main loop. Furthermore, it also should be classified into safety system. The result of this study can be used as a useful basis to identify factors of safety concern and to establish design requirements in the future. The method also can be applied for other nuclear facilities.

  • PDF

A Study Identifying Improved Building Height Regulations for Managing Natural Landscape in Collective Facility Districts in and around National Parks (국립공원 집단시설지구 자연경관관리를 위한 층고규제 합리화 방안)

  • Lee, Gwan-Gyu
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.39 no.5
    • /
    • pp.48-56
    • /
    • 2011
  • The objective of this study is to develop quantitative criteria for setting reasonable standards and regulations for building heights in collective facility districts inside national parks or those connected to their borders. Heights of all building sin collective facility districts were simulated in order to determine heights of ridge lines of sight passing the upper parts of buildings from a main view point. Where a facility's zone is located at the inside or boundary of inland mountainous national parks, and there are coastal type national parks with mountains in the background, the study recommended assigning the maximum allowable height of a building as 8.82m if national park authorities intend to preserve the ridges at three-tenths the height of a mountain. It amounts to 3 or 3.5 stories when it is converted into the number of floors. It is desirable to apply this standard to accommodations like a hotel except lodge or cottage as the maximum allowable height of a building. Nevertheless, when there aren't back mountainous areas among coastal-type national parks, there is a need for applying a separate standard. If an equal and uniform standard is applied to all collective facility districts, it becomes difficult to address local differences when managing landscape. There must be flexibility when applying a standard, depending on variables such as location of view points, differences in the methods of selection of view points, and differences in view angles, etc. Thus, there is a need for different landscape management strategies that address the unique natural environment of different zones.

Current Statues of Outdoor Exercise Equipment and Improvement Research - Focused on the Neighborhood Park of Dongtan New Town - (야외체력단련기구 이용현황과 개선방안에 관한 연구 - 동탄신도시 근린생활권 근린공원을 중심으로 -)

  • Kim, Do-Kyong;Kim, Seung-Hwan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.39 no.1
    • /
    • pp.84-95
    • /
    • 2011
  • The purpose of this study is to increase the usage of satisfaction of outdoor exercise equipment installed at parks when plans and designs are made for renovation or formation of parks. In order to do so, the study surveyed and analyzed the usage satisfaction of 150 men and women who use outdoor exercise equipment in neighborhood parks located in Dongtan New Town. There were four factors that affect the variables of usage satisfaction. They can be defined as the main facility factor, awning factor, maintenance factor, and additional facility factor. From the result regression analysis of the total satisfaction rate and the factors, the main facility factor was the most influential of the variables. This could indicate that the facility factor affects the satisfactory rate of outdoor exercise equipment. This research is done only with the examples of neighborhood parks, so it limits the possibility of analysis of seasonal use. It is necessary to conduct analysis research of parks which installed many outdoor exercise equipment, such as a vest-pocket park, children's garden, and pedestrian/urban/metropolitan neighborhood parks.

A Study on the In-depth Relationship between Facilities Safety Design Components and Parents Satisfaction and Psychological Stability in Children's Swimming Pool (어린이 전용 수영장의 시설안전디자인 구성요소와 학부모 만족, 심리적 안정과의 심층적 관계 연구)

  • Kim Kyoung-hyun;Park Sung-su;Park Kyeong-rae;Kim, Nam-jung
    • Journal of the Health Care and Life Science
    • /
    • v.9 no.2
    • /
    • pp.253-266
    • /
    • 2021
  • The purpose of this study was to identify the impact of facility safety design components of children's swimming pool facilities on parents' satisfaction and psychological stability. A total of 13 facilities used 324 out of 360 people collected through field visits as final research materials to achieve their goals. One-on-one in-depth interviews were conducted with a total of eight experts, including one administrator, three professors, one reporter, and three researchers. The following results were obtained using the IBM SPSS Statistics Ver. 24 statistical package: First, the facility safety design component factors affect the satisfaction of parents. Second, the factors of facility safety design components affect psychological stability. Third, parents' satisfaction factors affect psychological stability. Fourth, the facility safety design plan for children's swimming facilities is a total of four categories, suggesting 12 measures, including basic safety manual installation, use of mobile movement buffers, use of lane hypothetical steps, and up to 3:1 lessons for beginners.

The Satisfaction Analysis of Senior-Friendly Park Using Fuzzy Comprehensive Evaluation (퍼지 종합 평가를 활용한 노인 친화형 공원 만족도 분석)

  • Yin, Xiaoyan;Jung, Taeyeol
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.50 no.2
    • /
    • pp.89-101
    • /
    • 2022
  • The study was conducted in Erhe Park, a neighborhood park in Dali City, China, to derive the influence of environmental factors in the park on the elderly's satisfaction and to analyze the satisfaction in order to provide improvement recommendations. First, the evaluation indicators were selected, by referencing previous research into the elderly's evaluation of external spatial environments and the influence of various factors was determined from the questionnaire and factor analysis. Second, a fuzzy comprehensive evaluation was conducted to understand the satisfaction of the elderly, and then an Importance-Performance Analysis(IPA) analysis was conducted to develop improvement recommendations. Results of the factor analysis showed that park's environmental factors were grouped into four categories: facility suitability and comfort, safety and convenience of use, natural environment comfort, and parkway convenience. Based on this, the overall satisfaction rating for the environmental factors in Erhe Park was between satisfactory and average. The natural environment comfort was rated satisfactory, the facility suitability and comfort, and convenience and safety were rated average, and parkway convenience was rated near to satisfaction. The IPA analysis revealed that the suitability of rest facilities, suitability of convenience facilities, facility management status, safety of entrances and exits, and nighttime lighting facilities were items of high importance but low satisfaction that needed to be improved. The results of this study can be utilized as a guide for future building or readjustment of senior-friendly parks, and they are critical for increasing senior-friendly park satisfaction.

A Study for selecting the Highway Sites' Best Management Practice for Nonpoint Source Pollution (고속도로 현장별 비점오염 저감시설 선정방안 연구)

  • Lee, Yong-Bok;Choi, Sang-Il;Park, Kye-Su;Seong, Il-Jong;Jung, Sun-Kook
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.6
    • /
    • pp.857-866
    • /
    • 2011
  • This research categorized EIA target highways into following three types in order to minimize non-point source pollution from highway runoff. 1. Big drainage basin. 2. Small drainage basin. 3. Bridge section. The Natural, Filter and Swirl-Type devices were evaluated in terms of removal efficiency of TSS, BOD, COD, T-N, T-P, compatibility of site selection, economic feasibility, and maintenance convenience through which the final BMP was selected. According to the removal efficiency result, the area of Big and Small Drainage basin and bridge section had higher removal efficiency with natural facility than that of the Filter or Swirl-Type device. To make appropriate selection of highways'BMP for non-point source pollution, this study will aim to contribute to building more environmentally friendly highways by proposing the selection process that is made of 5 stages. 1. Selecting the target drainage basin. 2. Selecting the land for the mitigation facility. 3. Analysing the ease of maintenance. 4. Technically evaluating each installation. 5. Evaluating the effective implementation methods.