• 제목/요약/키워드: Park construction time

검색결과 1,496건 처리시간 0.026초

Development of Top-Down Connection System to Solve the Problem of Construction Tolerances in Installing Prefabricated Beams to Pre-founded Columns (시공오차가 있는 선기초기둥에 공장제작보의 설치가 용이한 탑다운공사용 접합기술개발)

  • Kim, Seung-Weon;Jung, Hee-Weon;Park, Dae-Yung;Kim, Dong-Gun;Park, Joo-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 2부
    • /
    • pp.25-30
    • /
    • 2011
  • Almost prefounded columns for top-down construction certainly have construction tolerances in plan and plumbness. Therefore, it is very difficult to connect prefabricated beams to prefounded columns at each floor level after excavation by usual top-down connection method and this usual connection method leads to long construction time, increasing cost and decreasing quality. This paper presents a new method for connecting prefabricated beam to prefounded column with GROUT-JACKET CONNECTION SYSTEM consisting of sleeve, bearing-shear bands and grout. Details and illustrations of the connections and applications by GROUT-JACKET CONNECTION SYSTEM for the top-down construction are also included in this paper.

  • PDF

THE STUDY ON THE PROBLEMS OF MARITIME FACILITIES(GAS PLANT) INSURANCE REGULATIONS

  • Keun-Hyung Park;Moon-Sun Park ;Moon-Hwan Hwang;Yong-Su Kim
    • International conference on construction engineering and project management
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1576-1581
    • /
    • 2009
  • The purpose of this study is to provide the problems of insurance system of maritime facilities(Gas Plant) in korea. In order to find out the problems of insurance system of construction work, the literature research and case study on the maritime facility construction are adopted as research method. And this study analyzed the construction cases of maritime facilities(Gas Plant) to which the national contract law was applied for the first time. The findings of this study are as follows: In the case analysis of 00 facility construction, the contractor pay additional insurance fees for the construction. And the regulations on insurance registration are not stated clearly relating to the enforcement ordinance of the national contract law.

  • PDF

Survey on the Market of Modular Building Using ARIMA Model (ARIM모형을 활용한 모듈러 건축시장 현황 조사)

  • Park, Nam-Cheon;Kim, Kyoon-Tai;Lee, Yuril
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.14-15
    • /
    • 2014
  • The modular construction is as yet early stage of market in Korea. So It is have difficulty of market demand forecast of the modular building. Therefore, this study was done analysis for market trends of the modular building using ARIMA(Auto Regressive Integrated Moving Average) model by time series data.

  • PDF

DEVELOPMENT OF MOBILE APPLICATION BASED RFID AND BIM FOR DEFECT MANAGEMENT ON CONSTRUCTION FIELD

  • Oh-Seong Kwon;Hwi-Gyoung Ko;Hee-Taek Park;Chan-Sik Park
    • International conference on construction engineering and project management
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.7-13
    • /
    • 2013
  • Recently, defect management have been considered as one of the major issues for more large-sized and complicated in domestic construction industry. However, the defect management have not been performed systematically because of special manpower, excessive amount of documents, 2D based inspection work, unclear traditional checklists, complicated work process and difficulty in communicating construction information. Therefore, the construction field manager could not performed the quality inspection and defect management work on time as well as the reliability of recorded quality and defect factors was decreased. The primary objective of this study is develop a Construction Defect Management Application CDMA) using a mobile (smartphone). The application can be sharing a huge information and communication technology based on RFID (Radio-Frequency Identification), BIM (Building Information Modeling) which enables field mangers to efficiently gather the information of defection in construction on-site.

  • PDF

Constructability and Economic Evaluation of Continuous Hoop Reinforcement Method

  • Kang, Su-Min;Park, Sung-Woo;Jang, Se-Woong;Jin, Jong-Min;Eom, Tae-Sung;Park, Hong-Gun
    • Journal of the Korea Institute of Building Construction
    • /
    • 제13권3호
    • /
    • pp.291-305
    • /
    • 2013
  • This paper presents the continuous hoop reinforcement method as a means to overcome the difficulty of rebar construction due to the seismic detail of lateral reinforcement. Because the continuous hoop has no seismic hook, and there is less interference during the rebar work, rebar quantities and construction time can be reduced. Since the details of column and beam continuous hoops are different from those of conventional lateral reinforcements, the construction method should be developed through mock-up tests. The length of the beam mock-up is 8m and the section size is $500mm{\times}700mm$, the height of the column mock-up is 2.8m and 4m, and the section size is $800{\times}800mm$. The length and the size are determined based on the elements that are generally used in reinforced concrete basement parking lots and office buildings. The results of the mock-up test showed that the quantities of rebar could be reduced by 20% and the time could be reduced by up to 40% compared with conventional lateral reinforcements.

Study on introduction of 'Pre-Agreement system for Additional Incidental Cost' related to construction time extension (공사기간 연장에 따른 추가간접비 사전합의 제도 도입 방안 연구)

  • Jeong, Ki-Chang;Lee, Jae-Seob;Park, Yang-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • 제13권6호
    • /
    • pp.33-44
    • /
    • 2012
  • This study is as to payment improvement method of additional incidental cost to be occurred upon extension of public construction time. According to the result of analysis about the cause of non-payment of additional incidental cost of construction time extension through site examples, it was found that difficulties exist in disputes & proofing over the scope of actual cost recognition, and in this regard the result of experts opinion indicated that a construction extension pre-agreement system can be executed which agrees the scope of recognition of additional incidental cost of construction time extension once the statistical standard is clear and accurate. Accordingly, in this study, by totalling multiple sites data, calculations were implemented in terms of type of construction projects, amount of constructions, period of constructions. According to the result of calculation, the element of type of construction project and construction period appears to have none direct effect to the occurrence of additional cost of construction time extension, but direct relationship was indicated related to the contract amount element. In view of above, in this study a standard additional incidental cost of construction time extension was proposed, and presented a system improvement plan to implement the construction extension pre-agreement system.

Development of Support System in Preparing Placing Drawings for the Improvement of Efficiency of Reinforcing Steel Works

  • Hyeon-Yong Park;Tai-Kyoung Kang;Yoo-Sub Lee;Hun-Hee Cho;U-Yeol Park;Hyun-Oak Jung;Kyo-Sun Lee
    • International conference on construction engineering and project management
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1370-1376
    • /
    • 2009
  • Reinforcing steel works should be carefully controlled by the construction manager considering the severe fluctuation of the price of reinforcing steel bars and for the safety of structure in building constructions. In particular, preparing rebar placing drawings needs more effort and time than before because of the emergence of higher and more complicated buildings. Moreover, the experience of field engineers or foremen (fabricators or detailers) in preparing placing drawings gives rise to the differences in fabricated bar type and quantity of bars used. To address these problems, this study proposed the support system in preparing placing drawings for reinforcing steel works efficiency. In the near future, if this system can be made available on the web, multiple end-users will be able to share the result; the efficiency of rebar supply chain management will also be improved.

  • PDF

Design and Implementation of Real-Time Progress Management System Using UML (Unified Modeling Language) - The Focus on Steel Structural Construction - (UML을 이용한 실시간 진도관리 시스템의 설계 및 구현 - 로봇 크레인 기반 철골공사를 중심으로 -)

  • Park, Jung-Lo;Kim, Kyung-Hwan;Kim, Jael-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.163-166
    • /
    • 2009
  • All sorts of technique for schedule progress management is being developed recently, These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using UML, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

Development of Computing Model for the Process and Operation Interval of Reinforced Concrete Work using Web-CYCLONE (철근콘크리트 골조공사의 프로세스 및 공정 공백 산출 시뮬레이션 모형 개발)

  • Park, Sang-Min;Son, Chang-Baek;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.341-343
    • /
    • 2012
  • This study introduces a method for computation of process and operation gap in the specific construction operation(i.e., RC frame construction applying a block-grouping scheme) using CYCLONE-based simulation modeling and analysis technique. Since uncertainty of construction environment exists, a thoughtful production planning is required to effectively deal with a risk resulting in schedule delay in advance. This study presents the concepts of a time delay occurred in a process level and operation level in a operation model, and a method of measuring gap-times in each level while the simulation progresses. It helps a site manager to decide how many segmentation in a construction block is suitable for eliminating unproductive time-delays under the constrained resources (e.g., laborer, equipment). A case study presents a network model representing a three segmented RC frame work, and result obtained from the simulation experiment.

  • PDF

Automation technology for analyzing 3D point cloud data of construction sites

  • Park, Suyeul;Kim, Younggun;Choi, Yungjun;Kim, Seok
    • International conference on construction engineering and project management
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1100-1105
    • /
    • 2022
  • Denoising, registering, and detecting changes of 3D digital map are generally conducted by skilled technicians, which leads to inefficiency and the intervention of individual judgment. The manual post-processing for analyzing 3D point cloud data of construction sites requires a long time and sufficient resources. This study develops automation technology for analyzing 3D point cloud data for construction sites. Scanned data are automatically denoised, and the denoised data are stored in a specific storage. The stored data set is automatically registrated when the data set to be registrated is prepared. In addition, regions with non-homogeneous densities will be converted into homogeneous data. The change detection function is developed to automatically analyze the degree of terrain change occurred between time series data.

  • PDF