도로품질 향상을 위한 야간 도로공사 시간확대의 영향분석 (Effects of Extending Duration of Nighttime Road Construction)

  • 이동민;최준성;박제진;박용진
    • 한국도로학회논문집
    • /
    • 제19권5호
    • /
    • pp.153-162
    • /
    • 2017
  • PURPOSES : This study was conducted to analyze the effects arising from extending the duration of nighttime road construction on improving road quality and durability. METHODS : Most previous studies estimating the social cost of various construction conditions did not consider road pavement cooling time as a factor in improving road pavement quality. This study investigated the feasibility of achieving higher road quality and durability by extending the duration of nighttime road construction time extension. For this investigation, the effects of such an extension on traffic conditions were analyzed based on micro-simulation studies and scenario-based cost-benefit analyses, using factors including traffic volume, delay, construction cost, and road pavement cooling time. RESULTS : The results of the traffic simulation studies and cost-benefit analyses indicate that the current road construction method that emphasizes completing nighttime road construction by 6 a.m. reduces pavement life while causing relatively little traffic delay. If the night construction time is instead extended to 2 p.m., road pavement lifetime is increased, reducing road re-construction cost. These savings are greater than the cost of congestion arising from extending the duration of nighttime construction. CONCLUSIONS : The current nighttime construction durations need to be extended in order to efficiently manage roads and reduce road management costs.

Factors That Affect Project Time and Cost Performance during Highway Construction Using Incentive/Disincentive Provisions

  • Pyeon, Jae-Ho;Park, Moonseo;Jung, Sangsun;Park, Taeho
    • 토지주택연구
    • /
    • 제11권4호
    • /
    • pp.115-124
    • /
    • 2020
  • Incentive/Disincentive (I/D) contract is designed for minimizing any disruption of traffic flow in road construction projects. I/D contracting projects have been evaluated with regard to time and cost performance in various states, more than 35 states. However, construction project managers and planners have little understanding of the project factors that affect the project time and cost performance of highway construction projects using I/D regulations. Therefore, the purpose of this research is to find factors that affect I/D project success or failure to improve the decision-making process for the implementation of I/D projects. In order to achieve the objectives of this research, the researchers collected I/D road construction project data from FDOT and performed evaluation for each collected project. Then, project data analysis to identify key factors that affect I/D project performance was performed. In conclusion, five significant factors for project time performance and six significant factors for project cost perfornace were identified and summarized.

Particle Swarm Optimization을 이용한 공기-비용 절충관계 최적화 모델에 관한 연구 (A Study on Optimization Model of Time-Cost Trade-off Analysisusing Particle Swarm Optimization)

  • 박우열;안성훈
    • 한국건축시공학회지
    • /
    • 제8권6호
    • /
    • pp.91-98
    • /
    • 2008
  • It is time-consuming and difficulty to solve the time-cost trade-off problems, as there are trade-offs between time and cost to complete the activities in construction projects and this problems do not have unique solutions. Typically, heuristic methods, mathematical models and GA models has been used to solve this problems. As heuristic methods and mathematical models are have weakness in solving the time-cost trade-off problems, GA based model has been studied widely in recent. This paper suggests the time-cost trade-off optimization algorithm using particle swarm optimization. The traditional particle swarm optimization model is modified to generate optimal tradeoffs among construction time and cost efficiently. An application example is analyzed to illustrate the use of the suggested algorithm and demonstrate its capabilities in generating optimal tradeoffs among construction time and cost. Future applications of the model are suggested in the conclusion.

Time Shortening of Structural Framework of High-rise Apartment Housing for the Urgent Project Area: Focused on the Cases of Insufficient Time or Delayed Projects

  • Bang, Jong-Dae;Lee, Do-Heun;Chun, Young-Soo;Park, Ji-Young;Lee, Bum-Sik;Jun, Myoung-Hoon
    • 토지주택연구
    • /
    • 제2권4호
    • /
    • pp.355-365
    • /
    • 2011
  • Construction duration is very important as a factor which comprises three axises of construction management with quality and cost in construction project. In general project condition, construction duration is optimized while minimizing construction cost and securing required quality. However, in case of insufficient project time duration or delayed projects, project progress management is different from those of normal projects. These project areas need solutions to complete work within a given completion day. To time shortening the current duration of each typical floor of structural framework in apartment construction is investigated, and a basic time schedule planning for typical floor of structural framework in normal projects is planned. This study proposed 3 ways for time shortening of urgent project or insufficient construction duration project. Also, This study proposed detailed time shortening method and technical solution conditions while time is shortened.

연속후프를 이용한 철근콘크리트 보, 기둥 철근배근 공법 개발 (Development of Continuous Rectangular Spiral Hoop Bar Construction for RC Beam and Column)

  • 박성우;곽창식;진종민;박홍근;강수민;김효락
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.171-172
    • /
    • 2012
  • In this study the continuous rectangular spiral hoop is used for saving cost and time, solving manpower shortage, and the quality of structures. Generally the use of continuous spiral reinforcement in reinforced concrete elements improve the strength and the ductility of the concrete. Savings in cost and time is demonstrated with the continuous rectangular spiral hoop through the mock up test of beam and column elements. In case of a 4m column element the time of rebar work decreases up to 40% compared with traditional hoop, and in case of a 8m beam the time also decreases 40%. This study present the construction method and details.

  • PDF

CONSTRUCTION MATERIAL MANAGEMENT USING SMART MOBILE COMPUTING

  • Kwang-Pyo Lee;Hyun-Soo Lee;Moonseo Park
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.221-228
    • /
    • 2011
  • As construction works have become larger and more complex, improving productivity by introducing Information Technology (IT) is pursued and more effective construction management is needed in construction industry. In this circumstance, many different kinds of project management system is being introduced, and various IT technologies are applied such as Personal Digital Assistant (PDA), Bar Code, Radio Frequency Identification (RFID), Web Camera, and so on. However, these kinds of technologies might cause re-processing of information and ineffectiveness of project because of lack of real time information processing technology or separation between construction sites and management offices. Meanwhile, these technologies rather decrease the construction productivity except for the data saving and database function. Therefore, this research aims to develop Application that can be applied efficiently for construction material management, by understanding problems of former management system with questionnaires and extracting functions with analysis of requirements. In virtue of the construction material management Application which will be developed in this study, it will be possible to input information automatically, to process and check material information in real time, and to identify the location of necessary material. Then, the problem of separation between construction sites and management offices are solved, and as a result, more efficient management of materials in construction sites will become possible. At the same time, this study will investigate the possibility and applicability of new IT device, Smart Phone to construction sites.

  • PDF

울산대공원 조경공사의 각 세부공정이 전체공정율에 미치는 영향분석 (An Analysis of Influences on Partial Work Rates under the Whole Work Rates on the Landscape Constructions in the Ulsan Grand Park)

  • 성백진;이재근;최종희
    • 한국조경학회지
    • /
    • 제31권6호
    • /
    • pp.64-72
    • /
    • 2004
  • This study analyses influences on partial work rates under whole work rates on landscape constructions in Ulsan Grand Park. The schedule management is one of the factors that are very important to the process management of landscape construction. The time process of the whole construction is supposed to be affected by several kinds of work that organize the whole construction. First, this study divides the construction of Ulsan Grand Park into 10 kinds of works: earth work, rain and sanitary sewage water work, water-supplying work, planting work, paving work, water proofing work, fountain work, instituting work and temporary work. Then the time-process curves of all kinds of work are statistically compared to that of the whole construction. The trial methods of statistics are lineal regression, non-lineal regression, and principal analysis. In the result of the non-lineal regression, the rain and sanitary sewage water work, the water-supplying work and the earth work strongly affected the whole construction. The principal analysis results show that the whole construction is affected strongly by the water-supplying work, the rain and sanitary sewage water work and the earth work. However the lineal regression is shown to be senseless because of its high collinearity.

공정관리 적용에 관한 연구: 도로현장 중심으로 (Implementation of Time Management; Based on Road Construction Projects)

  • 이규선;박희성
    • 대한토목학회논문집
    • /
    • 제31권3D호
    • /
    • pp.451-456
    • /
    • 2011
  • 공정관리의 원활한 수행은 프로젝트의 성패와 직접적인 관계를 가지고 있다. 이에 최근에 효율적인 공정관리업무를 수행을 위해 새로운 공정관리기술의 도입에 대한 필요성이 제기되고 있다. 따라서 본 연구는 도로건설 현장의 공정관리 업무 및 활용기법의 현황을 조사 분석하여 문제점 및 린 건설이론의 현장 적용정도를 파악하였다. 그리고 공정관리 측면에서 린 건설도입방안을 도출함으로써 도로 현장의 효율적인 공정관리를 위한 개선방안을 제시하였다. 이는 현장에서 효율적인 공정계획을 수립하는데 도움이 될 것이며 추후 현장 현황을 고려한 공정관리 시스템 개발을 위한 기초연구로 유용할 것으로 사료된다. 또한 이러한 개선방안 및 도입방안을 현장에 적용하여 성과를 분석하는 연구가 추후에 수행되어져야 할 것으로 기대한다.

무주 태권도원 현장 색채계획 시공단계 프로세스 적용사례연구 (A Study on the Case of Application of a Process at the Construction Stage of the Color Planning at the Construction Site of Muju Taekwondo Park)

  • 윤계영
    • 한국실내디자인학회논문집
    • /
    • 제22권5호
    • /
    • pp.320-327
    • /
    • 2013
  • In order to maintain and protect professionalism in color planning, the present study examined the process at the time of realization of color through color inspection and supervision in the actual construction site and suggested plans for improvement. Reflecting the characteristics that the governing body of the construction site is not a private person but an organization, the present study aims to provide institutional measures so that the supervisor of color construction at the actual site of construction can propose concerns related to proper construction at the right time, and the matters cannot be decided from the perspective of a layman. The institutional measures are proposed through the case of application of a process at the construction stage of the color planning at the construction site of Muju Taekwondo Park. First, the process clarified where the responsibility lies by specifying special conditions concerning color inspection on the field guide and color contract. Second, the sample for building materials was selected after obtaining it from a company capable of supply and is appropriate for the planned unit cost so that it could play an important role in realizing colors at the stage of basic design. Third, the process of construction was ensured not by temporary selection of colors but by continuous approval of colors in consideration of the conditions of construction site through letter of approval of color at each stage and point of time. Fourth, coordination of various color elements of other fields including landscape, interior, and electricity ensured construction of the whole structure in one color concept. Fifth, color inspection through the mock up of the site will minimize erroneous construction and reconstruction and prevent decrease in productivity. Sixth, this study also suggested more comfortable and positive color environment through evaluation by experts and users. The researcher of this study expects that color experts actively participate in the stage of construction to contribute to improvement of the color environment.

BIM-BASED TIME SERIES COST MODEL FOR BUILDING PROJECTS: FOCUSING ON MATERIAL PRICES

  • Sungjoo Hwang;Moonseo Park;Hyun-Soo Lee;Hyunsoo Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.1-6
    • /
    • 2011
  • As large-scale building projects have recently increased for the residential, commercial and office facilities, construction costs for these projects have become a matter of great concern, due to their significant construction cost implications, as well as unpredictable market conditions and fluctuations in the rate of inflation during the projects' long-term construction periods. In particular, recent volatile fluctuations of construction material prices fueled such problems as cost forecasting. This research develops a time series model using the Box-Jenkins approach and material price time series data in Korea in order to forecast trends in the unit prices of required materials. Building information modeling (BIM) approaches are also used to analyze injection times of construction resources and to conduct quantity take-off so that total material prices can be forecast. To determine an optimal time series model for forecasting price trends, comparative analysis of predictability of tentative autoregressive integrated moving average (ARIMA) models is conducted. The proposed BIM-based time series forecasting model can help to deal with sudden changes in economic conditions by estimating material prices that correspond to resource injection times.