• Title/Summary/Keyword: Park Maintenance and Management

Search Result 779, Processing Time 0.028 seconds

A pragmatic algorithm for the Minimum Railway Stock Maintenance Routing Problem (최소차량운용문제에 대한 실용적 해법)

  • Hong Seong-Pil;Kim Gyeong-Min;Lee Gyeong-Sik;Park Beom-Hwan;Hong Sun-Heum
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.25-32
    • /
    • 2006
  • Given a schedule of train to be routed by a Railway Stock, Railway Stock Routing Problem determine a sequence of train while satisfying turnaround time and maintenance restrictions. The objective is to minimize the Railway Stock during a week and each day simultaneously. And we prove that Railway Stock Routing Problem with maintenance restrictions is NP-hard. In this paper, we present two stage approaches that solve the Railway Stock Routing Problem in a reasonable time. In first stage we relax maintenance restrictions and formulate as a Min-cost-flow problem. Then, in the second stage, we attempt to satisfy maintenance restrictions using ours heuristic algorithm. We show the computational result of applying to an actual train schedule data.

  • PDF

Development of BIM models and management of BIM data for waterworks maintenance (상수도시설물의 유지관리를 위한 BIM모델 개발 및 BIM 데이터 관리방안)

  • Park, Jaehyun;Lee, Hyundong;Kwak, Pilljae
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.28 no.6
    • /
    • pp.669-679
    • /
    • 2014
  • 3D-based BIM(Building Information Modeling) technologies can be utilized effectively as a means of systematic management of facility information for safety assurance and effective maintenance of waterworks facilities. In this study, BIM models of water treatment facilities that can be used as basic data for BIM-based maintenance of waterworks facilities were developed. Information exchange and generality of the developed BIM models were evaluated by conducting interoperability analysis of IFC(Industry Foundation Classes) conversion models. In addition, the application of COBie(Construction Operations Building information exchange) was recommended as an effective countermeasure to deal with technical limitation regarding exchange and utilization of facilities-related information through current IFC models. The results of this study can contribute to the development of BIM-based maintenance system for waterworks facilities.

THE DEVELOPMENT OF BUILDING MAINTENANCE SYSTEM FOR DETERMINING PRIORITIES OF PUBLIC FACILITY REPAIRS & REPLACEMENT (I)

  • Chun-Kyong Lee;Tae-Gab Jung;Byong-Jin Yu;Tae-Keun Park
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.376-381
    • /
    • 2011
  • In Korea Water Resources Corporation (K-Water) has seen four problems rising in four aspects of property management of approximately 1,300 buildings scattered through put to country. To solve these, ground data for repair and replacement works to be conducted for prevention will be prepared and building maintenance system (hereinafter referred to as PBMS) intended to record related repair and replacement work histories and calculate LCC of the related these items will be developed. PBMS, a web-based system, will be developed for users' convenience and data monitoring in real time. To sum up, PBMS are expected to maximize efficiency in four aspects including the establishment of repair and replacement work plans for prevention, history management, DB for predicting future work to be occurred and enable the determination of priorities by being developing into facility condition assessment systems through the results of analysis of repair and replacement histories and LCC.

  • PDF

Integrated Network Management Agents of IMT-2000 based on ASIB Component

  • Park, Soo-Hyun
    • Proceedings of the IEEK Conference
    • /
    • 2002.07c
    • /
    • pp.1382-1385
    • /
    • 2002
  • By managing various communication networks collectively, Telecommunication Management Network (TMN) has appeared as a concept to aim for the unified and effective communication network operation and maintenance. IMT-2000 and other network such as PSTN, cellular networks and packet witching network that are integrated with IMT-2000 have been developed in different platforms - hardware and operating system, and a same circumstance will happen in the maintenance in the future. Also, it is difficult to approach to the standard for Q3 interface implementation of the agent in TMN system that may occur in the development or the maintenance for the different platform of IMT-2000 and other networks that are integrated with IMT-2000. In order to solve this kind of Problems, this Paper suggests integrated network management agent of IMT-2000 based on the NTS model and Advanced Intelligent Network(AIN).

  • PDF

A Preventive Maintenance Scheduling Model of the Cluster Tool (클러스터 툴의 예방유지보수 스케줄링 모형)

  • Lee, Hyun;Park, You-Jin;Hur, Sun
    • IE interfaces
    • /
    • v.25 no.1
    • /
    • pp.127-133
    • /
    • 2012
  • This paper considers the preventive maintenance scheduling problem of the cluster tool which is one of the most important manufacturing equipments in the next-generation semiconductor production environment. We define a random process that expresses the successive amount of chemicals accumulating inside the tool. Based on the renewal theory, we find the expected value and probability distribution of the time that the amount of accumulated chemicals exceeds a predetermined level. For a given probability that the accumulated chemicals exceeds the predetermined level we present a method to obtain the number of chamber operations to perform the preventive maintenance of that chamber. In addition, a method to get the preventive maintenance schedule for the whole cluster tool is presented. A numerical example is provided to illustrate our method.

A Process Improvement of Reverse Engineering and Delivery Steps for Service based Software Maintenance (서비스 기반 소프트웨어 유지보수를 위한 역공학과 인도 (Delivery)단계의 프로세스 개선)

  • Park, Jin-Ho;Rhew, Sung-Yul;Kim, Jong-Bae;Chung, Suk-Kyun
    • Journal of Information Technology Services
    • /
    • v.9 no.4
    • /
    • pp.169-185
    • /
    • 2010
  • According to software growth, also software maintenance has been continuously improving. In addition, the existing concept of software maintenance process demands operational management and improvement of service task. However, when we perform maintenance task, we have several constraints about applying service based requirement to system. Therefore, in order to solve these problems, we need a study of task of process for service based maintenance. In this paper, we propose a Service based Software Maintenance Process. Proposed process based on MaRMI-RE standard for software development and maintenance and compares it with the service based representative standards. In a related works, we study activity of ITIL and identify activities and tasks for maintenance. After this, identified activities and tasks compare with activities of MaRMI-RE. And then, we derive activities and tasks of a Service based Software Maintenance Process. Finally, we validate a result by comparing the proposed process with a general service operational process.

A Study on the Present Condition about the Management of Repair and Long-term Maintenance Historical Data in the Rental Apartment (임대아파트의 수선 및 장기수선 이력 정보관리에 관한 실태조사연구)

  • Lee Chun-Kyong;Jung Young-Han;Son Sang-Jun;Hwang Young-Sam;Park Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.533-536
    • /
    • 2003
  • Tn improve the quality in apartment houses, it has regarded one of the most important steps as systematic maintenance. Also, repair and long-term maintenance have played an important role in maintenance of the rental apartment. Moreover, the historical data which come from these works have functioned as preventive maintenance in inspection and references in repair and long-term maintenance. To sum up, it would be necessary to get rid of the factors of dispute from sharing a variety of data among occupants, superintendents, and proprietors. Futhermore, it would be possible to show the management methods of repair and long-term maintenance historical data.

  • PDF

Development of Bridge Management System for Next Generation based on Life-Cycle Cost and Performance (생애주기 비용 및 성능을 고려한 차세대 교량 유지관리기법 개발)

  • Park, Kyung-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.167-174
    • /
    • 2007
  • This study proposes a practical and realistic method to establish an optimal lifetime maintenance strategy for deteriorating bridges by considering the life-cycle performance as well as the life-cycle cost. The proposed method offers a set of optimal tradeoff maintenance scenarios among other conflicting objectives, such as minimizing cost and maximizing performance. A genetic algorithm is used to generate a set of maintenance scenarios that is a multi-objective combinatorial optimization problem related to the and the life-cycle cost and performance as separate objective functions. A computer program, which generates optimal maintenance scenarios, was developed based on the proposed method. The subordinate relation between bridge members has been considered to decide optimal maintenance sequence. The developed program has been used to present a procedure for finding an optimal maintenance scenario for steel-girder bridges on the Korean National Road. Through this bridge maintenance scenario analysis, it is expected that the developed method and program can be effectively used to allow bridge managers an optimal maintenance strategy satisfying various constraints and requirements.

  • PDF

A Study on the Survey of the Experts' Consciousness as to the Level in Maintenance Management of Educational Facilities (교육시설 유지관리 수준에 관한 전문가 의식조사 연구)

  • Lee, Mi-Hye;Jung, Young-Han;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.392-397
    • /
    • 2008
  • In case of the BTL project for current educational faculties, the proper standards to analyze those said educational standards lack, so it is very difficult to conduct an exact analysis and those improper standards are problematic when proper management and maintenance costs are calculated. In case of such educational facilities, as students have to use them safely for a long time and the quantity of their activities and the status of their physical growth based on individual classes, as well as the features for use by facility and the regional characteristics are different, other standards for maintenance and management must be considered unlike an apartment house. Thus, in this study, to set up the standards considering the features of educational facilities, the maintenance and management level suitable for educational facilities is presented by comparing and analysing that required to maintain and manage an apartment house, targeting the experts specializing management of educational facilities.

  • PDF

Development of Defect-Repair Method-Cost Mapping Algorithm of Concrete Bridge Using BMS Data (BMS 데이터를 활용한 콘크리트 교량의 결함-공법-비용 매핑 알고리즘 개발)

  • Lee, Changjun;Park, Wonyoung;Cha, Yongwoon;Jang, Young-Hoon;Park, Taeil
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.2
    • /
    • pp.267-275
    • /
    • 2023
  • As aged infrastructures have been increased, the importance of accurate maintenance costs and proper budget allocation for infrastructure become prominent under limited resources. This study proposed a mapping algorithm between representative defects, repair methods, and the estimated maintenance costs for concrete bridges. In this regard, using BMS (Bridge Management System) data analysis, bridge repair methods were classified and matched with defects according to their locations, types, and sizes. In addition, the maintenance costs were estimated based on the amount of work-load and quantity per unit using CSPR (Cost Standard Production Rate). As a result, the level of accuracy was an average of 85.1 % compared with the actual bill of quantity for Seoul bridge maintenance. The accuracy of maintenance costs is expected to be enhanced by considering the various site conditions such as pier height, extra charge conditions, additional equipment, etc.