• Title/Summary/Keyword: Park Construction Cost

Search Result 1,021, Processing Time 0.025 seconds

Public-Private Collaboration Process for Planning Phase of Urban Renewal Projects (도시환경정비사업 계획단계 민.관 협의 프로세스 도입 방안)

  • Lee, Jong-Kweon;Park, Hyeon-Soo;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.22-30
    • /
    • 2011
  • In the planning phase of domestic urban environment maintenance and improvement projects, a particular problem is the increase in service expenses and project cost with the establishment of plans under circumstances that exclude the residents or have incomplete consent from them and the public organization. This delays the promotion of the project. This study aims to resolve such problems by proposing a measure to introduce a privatepublic consultative body for residents and the relevant departments of the public sector, to encourage them to participate and establish plans together from the beginning. This is expected to contribute to the smooth promotion of the project, as it would remove the conflicting factors that are expected to be generated in the project implementation phase before they could emerge.

Questionnaire Survey on the Occurrence Time and Cause of Defect in Remodeled Apartment (아파트 리모델링 공사의 하자발생 시기 및 원인에 관한 연구)

  • Park, Sun-Gyu
    • The Journal of the Korea Contents Association
    • /
    • v.15 no.12
    • /
    • pp.596-603
    • /
    • 2015
  • Rapid economic growth occurred in Korean since the 1970s. This economic growth caused rapid urbanization and an increase in population in city. As a results, there was a housing shortage problem in korea. The government and construction companies have been continuously building residential houses such as apartments, mansions, others. Apartments mostly consist of residential houses and are generally made from reinforced concrete structure. Reinforced concrete structures including apartments need to be renovated, because they deteriorate with respect to time. However, there is no available data or information regarding the cost or the period of time that is needed for renovates of these apartment. We are especially short of information on the defect data of remodeling construction. Therefore, the purpose of this paper is to provide fundamental data about the cause of defect in remodeled apartments as well as the appropriate time to execute renovation through a questionnaire survey with apartment residents as the participants.

Structural Capacity of Steel Plate Walls According to Various Infill Plate Details (다양한 웨브강판 상세에 따른 골조강판벽의 구조성능)

  • Park, Hong Gun;Choi, In Rak;Jeon, Sang Woo;Kim, Won Ki
    • Journal of Korean Society of Steel Construction
    • /
    • v.19 no.1
    • /
    • pp.67-78
    • /
    • 2007
  • In this study, we performed an investigation on the variations in the structural capacity of steel plate walls with various infill plate details. Five three-story plate walls with thin web plates were tested. Parameters for the test specimens were the connection details between the moment frame and infill plates, such as weld and bolt connections, the location and length of weld connection, and coupling wall. Regardless of the details of infilled steel plate, the steel plate wall specimens showed excellent initial stiffness, strength, and energy dissipation capacity. However, the wall with bolt-connected infill plates showed slightly low deformation capacity. This result showed that for workability and cost efficiency,various wall details can be used in practice without causing a significant decrease in the structural capacity of steel plate walls. A method for making projections on strength and energy dissipation capacity of steel plate wall specimens with various details was developed.

An Experimental Study on Fire Resistance Performance Test of Non-loadbearing Ceiling Systems (비내력 천장구조 내화성능평가에 대한 실험적 연구)

  • Choi, Dong-Ho;Kim, Dae-Hoi;Park, Soo-Young
    • Fire Science and Engineering
    • /
    • v.25 no.4
    • /
    • pp.22-27
    • /
    • 2011
  • Fire resistance ceiling system is the structure of which the ceiling installed under the slave of the structure has the fire resistance performance. Because of having the fire resistance performance, fire resistive coatings on steel beams can be reduced and large span structures can be constructed. So, it have advantages of convenience for construction, shorten for construction time and cost reducing. In foreign country, it is general that one system consisting of slave and ceiling is constructed as a fire resistance system. But in Korea, there are no fire resistance ceiling systems thus economical efficiency due to being high-rise and light-weight of structures is not secured. Therefore research and development of nominal fire resistance ceiling systems is necessary. On this study, fire resistances of standard non-loadbearing ceiling systems were assessed and basic informations for developing the fire resistance non-loadbearing ceiling systems were presented.

Strength Characteristics of Cemented Sand and Gravel (Cemented Sand and Gravel 재료의 강도특성)

  • Kim Ki-Young;Park Han-Gyu;Jeon Je-Sung
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.10
    • /
    • pp.61-71
    • /
    • 2005
  • Cemented Sand and Gravel (CSG) is a material made by simple mixing of rock-based raw materials such as excavated soil and riverbed gravel together with cement and water. The use of CSG material for cofferdam and large dam is gradually increasing in Japan because a quarry and aggregate plants can be diminished. Also, the CSG method can reduce dam construction cost, construction duration and destruction of environment. In this paper, the basic strength characteristics of CSG, such as compressive strength, modulus of elasticity and stress-strain curve were investigated by unconfined compression test and large triaxial compression test. From the results of the experimental study, the correlation equations between elastic modulus and unit cement, age are proposed.

DESIGN OPTIMIZATION OF RADIATION SHIELDING STRUCTURE FOR LEAD SLOWING-DOWN SPECTROMETER SYSTEM

  • KIM, JEONG DONG;AHN, SANGJOON;LEE, YONG DEOK;PARK, CHANG JE
    • Nuclear Engineering and Technology
    • /
    • v.47 no.3
    • /
    • pp.380-387
    • /
    • 2015
  • A lead slowing-down spectrometer (LSDS) system is a promising nondestructive assay technique that enables a quantitative measurement of the isotopic contents of major fissile isotopes in spent nuclear fuel and its pyroprocessing counterparts, such as $^{235}U$, $^{239}Pu$, $^{241}Pu$, and, potentially, minor actinides. The LSDS system currently under development at the Korea Atomic Energy Research Institute (Daejeon, Korea) is planned to utilize a high-flux ($>10^{12}n/cm^2{\cdot}s$) neutron source comprised of a high-energy (30 MeV)/high-current (~2 A) electron beam and a heavy metal target, which results in a very intense and complex radiation field for the facility, thus demanding structural shielding to guarantee the safety. Optimization of the structural shielding design was conducted using MCNPX for neutron dose rate evaluation of several representative hypothetical designs. In order to satisfy the construction cost and neutron attenuation capability of the facility, while simultaneously achieving the aimed dose rate limit (< $0.06{\mu}Sv/h$), a few shielding materials [high-density polyethylene (HDPE)eBorax, $B_4C$, and $Li_2CO_3$] were considered for the main neutron absorber layer, which is encapsulated within the double-sided concrete wall. The MCNP simulation indicated that HDPE-Borax is the most efficient among the aforementioned candidate materials, and the combined thickness of the shielding layers should exceed 100 cm to satisfy the dose limit on the outside surface of the shielding wall of the facility when limiting the thickness of the HDPE-Borax intermediate layer to below 5 cm. However, the shielding wall must include the instrumentation and installation holes for the LSDS system. The radiation leakage through the holes was substantially mitigated by adopting a zigzag-shape with concrete covers on both sides. The suggested optimized design of the shielding structure satisfies the dose rate limit and can be used for the construction of a facility in the near future.

An Analysis on the Construction of Energy Exchange Network to Recover Waste Heat Energy in Pohang Steel Industrial Complex (포항철강산업단지 내부 폐열 회수를 위한 에너지 교환망 구축 방안 분석)

  • Lee, Gwang-Goo;Jung, In-Gyung;Chun, Hee-Dong
    • Clean Technology
    • /
    • v.17 no.4
    • /
    • pp.406-411
    • /
    • 2011
  • A detailed database of waste heat is built to propose energy exchange networks to recover waste energy in Pohang Steel Industrial Complex. A visualized technique is used to figure out the status of waste heat energy and to suggest potential energy exchange networks. Several energy networks are proposed in terms of temperature level, the amount of available energy, distance, and construction cost. A simple economical assessment is applied to the energy exchange networks which have higher economic potential. Their average payback period is estimated to be 2.8 years. The total amount of energy saving by constructing the proposed energy exchange networks is 4,778 TOE per year. It corresponds to 11,160 ton $CO_2$ reduction with the assumption that the recycled waste energy replaces the use of LNG in energy-demanding companies.

Decision Making Support Tool for Master Architect in Design Development Phase of Mega-Project (메가프로젝트 기본설계단계의 Master Architect 의사결정지원 도구)

  • Cho, Dong-Hyun;Koo, Kyo-Jin;Park, Sung-Chul;Kim, Jong-Il
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.202-206
    • /
    • 2008
  • Recently, as high level of interest for the city regeneration, large-scale projects are planned or being performed such as reconstruction project. These mesa-projects have different characteristics from a single project in the design phase. It is a number of companies involved in design phase of mega-project and principal decision-making entity manage the project from the initial stage of an ongoing business by coordinating an opinions between design companies. The absence of a decision making support system reflected those characteristic causes a variety of problems such as a loss of cost and schedule. Therefore the final object of this paper is to propose a decision making support tool and system interface.

  • PDF

Investigating the Impacts of the Quality of Project Management Information System on Project Performance and User Satisfaction (프로젝트 관리 정보시스템 품질이 프로젝트 성과와 사용자 만족도에 미치는 영향)

  • Park, So-Hyun;Lee, Taewon;Kim, Seung-Chul
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.3
    • /
    • pp.50-60
    • /
    • 2018
  • The use of Project Management Information System (PMIS) is increasing in project management industries such as construction, defense, manufacturing, software development, telecommunication, etc. It is generally known that PMIS helps to improve the quality of decision making in project management, and consequently improves the project performance. However, how much and which parts of project management performance are affected by PMIS still need to be studied further. The purpose of this study is to investigate the impact of PMIS quality on project management performance. We collected data from various project based industries such as construction, defense, manufacturing, software development and telecommunication by using survey questionnaire. PMIS quality was measured in three dimensions. They are system quality, information quality and service quality. Project management performance was measured in nine variables such as time reduction, work accuracy, cost management, etc. Statistical analyses such as multiple regression were used to analyze the data. The results showed that PMIS quality had significant impacts on the project management performance and user satisfaction. It was notable that only two dimensions out of the three PMIS quality dimensions, system quality and information quality, affected the project management performance. Also, it was found that PM performance played a mediating role between PMIS and user satisfaction, and between PMIS and reuse intention. The contribution of this research is that it helps to clarify what aspects of PMIS affect the project management performance and user satisfaction.

An Empirical Study on Setting Up of an Appropriate Organization for Efficient Operation of ERP Systems (ERP 시스템의 효율적 운영을 위한 적정 조직 설계에 대한 실증적 연구)

  • Nam, Ho-Ki;Park, Sang-Min;Kim, Jhong-Hyun
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.4
    • /
    • pp.117-125
    • /
    • 2010
  • Today, many companies have introduced an ERP system - an enterprise resources planning - in order to improve corporate credibility through transparent management and for quick responses to market situations through quick decision making. After the construction of an ERP system, many companies are having difficulty in calculating the appropriate number of personnel required for running the system because of a lack of standard for doing so, as well as a lack of pertinent procedures. As a result, the companies are having to resort to a trial-and-error approach. Therefore this paper studied a model for calculating the appropriate number of personnel required for efficiently running an ERP system after its construction, as well as for constantly meeting its performance targets. The developed model was applied empirically to calculate an appropriate number of personnel required, and an organization was set up according to this. Therefore, the purpose of this study was to present an optimized model for calculating the number of personnel required for operating an ERP system, that which addresses problems of existing models, in order to help companies organize the operation personnel and its size, as well as to provide more objectivity to the calculated number of personnel required and to improve credibility.