• 제목/요약/키워드: Park Construction

검색결과 9,376건 처리시간 0.04초

역타공법 중심의 골조 공기단축을 위한 시공시퀀스 변경에 따른 구조해석 및 요소기술 분석 (Structure and Construction Technology Analysis about Construction Sequence Change for Superstructure Construction Period Reduction in Top-down Method)

  • 박용현;주영규
    • 대한건축학회논문집:구조계
    • /
    • 제35권6호
    • /
    • pp.101-109
    • /
    • 2019
  • The purpose of this study is to improve a general Top-Down construction process for superstructure construction period reduction. In a general Top-Down construction sequence, the ground floor slab is set up first. Subsequently, 1st basement level construction including core walls is constructed. Initiation of the ground level superstructure gets waited until then. In this study, removable deck plate installation on the bottom of the core walls of ground level is preceding the concrete casting, therefore, ground level superstructure construction is able to get started earlier. Up to first typical floor concrete casting, total of seventy-two working(calendar) days will be resulted in a reduction from the total construction periods.

CHECKLIST FOR ENVIRONMENTAL FRIENDLY CONSTRUCTION MANAGEMENT IN DESIGN PHASE

  • In-Su Jung;Hyun-Su Park;Chan-Sik Lee
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.376-385
    • /
    • 2007
  • Construction project is necessary element for human life to upgrade the quality and convenience. However, due to its contradictory nature to the environment preservation, environmental pollution and damage, deterioration of natural scenery, noise/vibration, water quality pollution, etc. caused in the process of construction greatly affect the environment. For the building or construction project, its possible impact on environment during construction work and after completion must be predicted at its design phase, which will result in the completion of the architecture convenient for human being with its environmental pollution reduced to minimum level. In this study, the checklist of environmental factors was suggested, which should be taken into account at its design phase in conducting the construction work. Proposed checklist was linked with the developed web-based system for the convenience of users like designer and construction manager, etc. It is expected that the checklist suggested by this study will help the designer and construction manager to continue the steady development from the environmental viewpoint during the design phase.

  • PDF

Construction Industry Maturity Model

  • Kwon, Byung-ki;Lee, Hyun-soo;Park, Moonseo;Lee, Kwang-Pyo;Kim, Soo-young
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.445-449
    • /
    • 2015
  • Construction industry is one of the most significant sector in national economic, but the portion of construction has been falling regularly with the regional development. In spite of decrease in economic portion, role of construction industry does not changed irrespective of development, as the foundation of development. To distinguish each state of the maturity, countries are grouped on GDP per capita, than compared with variance of GVA in construction and GFCF per GDP as level of construction industry. GVAc% and GFCF% shows corn-shaped plotting in increase of GDP per capita, and each value converge to around 20% and 5% as GDP per capita increase. The definition of maturity is consist of 4 stages; pre-developing, ascending, stabilization, and maturement. Maturity of construction industry is a term of broad sense of construction industry that is easily to figure current state of regional construction and shows what normal condition of construction is in regional economy.

  • PDF

종합건설기업 직접시공 확대를 위한 법률 규제 강화의 실효성 검증 (Validate the Effectiveness of Strengthening Legal Regulations to Expand Direct Construction of General Construction Companies)

  • 박홍조;안성훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.341-342
    • /
    • 2023
  • This study empirically validates whether the effect of strengthening the legal regulations in the construction industry under the 'Construction Business Act' is true in order to expand the direct construction of the comprehensive construction corporation. Checking the effectiveness of the legal regulation that can force direct construction of the required scope of construction will not only be a logical background in the strengthening of law regulations but also suggest arguments that contradict some construction companies called legal regulation.

  • PDF

The Analysis on the Value of Yongsan National Park and its Economic Effect

  • Chang, In-Seok;Cho, Young-Tae;Lee, Mi-Hong;Park, Shin-Won
    • 토지주택연구
    • /
    • 제2권4호
    • /
    • pp.491-501
    • /
    • 2011
  • This study estimated economic value and benefits of Yongsan National Park, which will be constructed by financial investment of the government and objectively estimated the real value of it by understanding the value of the park from a user's view of the park. For this, the value of Yongsan National Park is divided into using value such as carbon reduction and the function of relieving urban heat island as an environmental material and non-using value based on willingness to pay of the public according to the construction of the park. As a result of the analysis, it was found out that the using value of Yongsan National Park would reach 130 million won up to maximum level of 450 million won per year, and the non-using value was analyzed to be worthy of 2,344 won per capita every month. Besides, economic ripple effect that can be expected in the process of the park construction project was analyzed to be a national policy that creates effect on production inducement of 2.6 trillion won and value added of 809.6 billion won and new jobs for 25,620 persons. Considering the value of Yongsan National Park and the effect of the project based on the result of this study, it was found that it could sufficiently secure the validity of implementing the project compared to the financial investment by the government. Therefore, it must be emphasized that diffusion strategy is necessary for national understanding and for a nation to make it understood its appropriateness widely in respect to the construction of Yongsan National Park for the successful construction of Yongsan National Park and to raise its using value in the future.

기행문 - 스페인에서 본 천재 예술가(藝術家) 가우디(Antoni Gaudi)가 설계.시공한 구엘공원(Park G$\ddot{u}$ell) 주거단지와 경내(境內)에 건설한 석조교량(石造橋梁)에 대한 소고(小考) (Travel of the Park G$\ddot{u}$ell in Spain Barcelona which were designed and made a construction by Antoni Gaudi, as a genius artist, and review the works of residential development-Park G$\ddot{u}$ell, and also bridge made by stone bricks in the compound)

  • 조규영
    • 건설안전기술
    • /
    • 통권55호
    • /
    • pp.37-51
    • /
    • 2012
  • There is a shround of mystery surronnding Gaudi. In all probability, the first mist preventing us from gaining acess to his work is the intrinstic mysteriousness of all genius and, at the end of the day, of all human spirit. The situation is complicated by the well-known fact that Gaudi wished to creat an aura of silence around his persona, while, at the same time as maintaining this secretiveneness - in other words, the annihiliation of his fundamental values-gave expression and symbolisation to his moods and incerdible mental power. On a piece of land on the Muntanya Pelada, in the Barcelona district of La Salut, Eusebi G$\ddot{u}$ell Wanted to build an urbanisation inspired by the concepe of the garden city. in this he sought to return to nature, health and an escape from the insalubrous industrial city. Gaudi worked on the construction of this park between 1900 and 1914, and even moved his home there in 1906. An outstanding feature of park G$\ddot{u}$ell is the integration of architecture with nature. In other to save the natural slopes, Gaudi built viaducts from brick pillars, which he covered with stone obtained from the excavation.

  • PDF

A STUDY ON DURATION ESTIMATE METHOD USING STOCHASTIC MODEL IN THE BIM ENVIRONMENT

  • Jae H. Park;Seok H. Yun;Joon H. Paek
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1209-1215
    • /
    • 2009
  • Recently, Construction Projects are being much bigger and more complex. So the importance of Construction Planning and Management is increasing and increasing because of the Construction Projects is involved in a variety of construction-related subjects. Competitive of the Construction Industry decided Cost, Construction Duration and Productivity. But they were just focused on Cost Saving instead of Construction Duration and Productivity. However, they have to finish construction projects using minimum cost and duration with quality and function of required level for successful Construction projects. Thus, current high exchange rate and high period, it is clear to decrease construction cost and to do economic construction in huge Construction Projects and it means more advanced Construction Schedule Management needs for economic construction. But Construction Scheduling Planning, basic of Construction Schedule Management, adjusted contract period without Pre-Planning, just depending on experience and ability of Construction Engineer. Because of that, this study suggests new Duration Estimate Method using Stochastic Model in BIM Environment for advanced Construction Schedule Management. Existing Duration Estimate Methods are just modified wrong points of them or analyzed effective factors of construction schedule. However, New Duration Estimate Method is just consists of Stochastic Model and BIM Environment without existing Duration Estimate Methods. So, new method has creativity and specialty. After this research, it would be a great model in construction industry field.

  • PDF

AprilTag and Stereo Visual Inertial Odometry (A-SVIO) based Mobile Assets Localization at Indoor Construction Sites

  • Khalid, Rabia;Khan, Muhammad;Anjum, Sharjeel;Park, Junsung;Lee, Doyeop;Park, Chansik
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.344-352
    • /
    • 2022
  • Accurate indoor localization of construction workers and mobile assets is essential in safety management. Existing positioning methods based on GPS, wireless, vision, or sensor based RTLS are erroneous or expensive in large-scale indoor environments. Tightly coupled sensor fusion mitigates these limitations. This research paper proposes a state-of-the-art positioning methodology, addressing the existing limitations, by integrating Stereo Visual Inertial Odometry (SVIO) with fiducial landmarks called AprilTags. SVIO determines the relative position of the moving assets or workers from the initial starting point. This relative position is transformed to an absolute position when AprilTag placed at various entry points is decoded. The proposed solution is tested on the NVIDIA ISAAC SIM virtual environment, where the trajectory of the indoor moving forklift is estimated. The results show accurate localization of the moving asset within any indoor or underground environment. The system can be utilized in various use cases to increase productivity and improve safety at construction sites, contributing towards 1) indoor monitoring of man machinery coactivity for collision avoidance and 2) precise real-time knowledge of who is doing what and where.

  • PDF

Practical Issues in Application of RFID to Pipeline Construction and its Benefit Analysis

  • Yun, Ki Cheol;Oh, Chi Don;Cho, Nam Ho;Kim, Kyong Ju;Park, Chan Sik
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권2호
    • /
    • pp.1-7
    • /
    • 2014
  • Radio Frequency Identification (RFID) has been applied to the construction industry for improving the efficiency of material and process management. Most RFID-related studies have focused on building or plant construction. The application of RFID has been limited in pipeline construction projects where materials are stored and stacked across a large construction site. This paper investigates practical issues in pipeline construction, improves the read rates of RFID tags, and tests their utility by putting them into practice. This paper demonstrates the benefits that may be expected with the use of improved RFID tags and the development of an automated pipeline construction management system. As a result, pipeline construction management time decreased by 28 hours per month compared to the conventional method. Cost decreased by about 26%.

지하구조물의 공법선정을 위한 요인분석 (Analysis of Factors for Selecting Construction Methods for Underground Structures)

  • 강현정;임홍철;박상현;이강
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2007년도 춘계학술논문 발표대회
    • /
    • pp.37-40
    • /
    • 2007
  • As a demand for underground structure is increasing with more parking and retail spaces required. Various construction methods are reviewed and selected for each specific site for economical and fast construction. In this study, factors for selecting construction methods were categorized for substructure construction. Construction processes of substructure are consisted of methods for excavation, earth retaining systems, and placement of slabs. Factors for the selection of substructure construction method are the condition of surrounding, geotechnical, information and constraint by comfortness for others nearby. After survey for the construction data of 5 different sites, analysis about reliable substructure construction selection method was suggested.

  • PDF