Journal of Advanced Marine Engineering and Technology
/
제28권6호
/
pp.1017-1025
/
2004
Generally generator is connected to the bus with no load. After the connection to the bus. the frequency of generator system with no load has to be increased for preventing the reverse power. But in a few case of parallel running with infinite bus system, we have to synchronize the loaded generator to the infinite bus. The frequency of generator system with load has to be lowered for prevention of load shift to the bus system. The blackout of infinite bus decreases the parallel running generator's frequency because of load increasing. In this paper we propose a method that the generator with load maintains the frequency constantly after the blackout of infinite bus. With the constant speed control and load control method of parallel running system to the infinite bus we apply the method to the industrial generating system.
Kim, Dong Kyue;Choi, Piljoo;Lee, Mun-Kyu;Park, Heejin
JSTS:Journal of Semiconductor Technology and Science
/
제16권5호
/
pp.564-581
/
2016
We present an efficient hardware prime generator that generates a prime p by combining trial division and Fermat test in parallel. Since the execution time of this parallel combination is greatly influenced by the number k of the smallest odd primes used in the trial division, it is important to determine the optimal k to create the fastest parallel combination. We present probabilistic analysis to determine the optimal k and to estimate the expected running time for the parallel combination. Our analysis is conducted in two stages. First, we roughly narrow the range of optimal k by using the expected values for the random variables used in the analysis. Second, we precisely determine the optimal k by using the exact probability distribution of the random variables. Our experiments show that the optimal k and the expected running time determined by our analysis are precise and accurate. Furthermore, we generalize our analysis and propose a guideline for a designer of a hardware prime generator to determine the optimal k by simply calculating the ratio of M to D, where M and D are the measured running times of a modular multiplication and an integer division, respectively.
This study analyzes the resonance characteristics caused by the mutual interference between LCL filters and the grid impedance under the parallel operation of the grid-connected inverter using the LCL filter. These characteristics are verified through simulation and experiment. Two inverters are used to connect to the grid in parallel, and the system parameters, including the LCL filter, are set to the same conditions. In the case of inverters running in parallel at the point of common coupling, the presence of grid impedance causes mutual interference between the LCL filters of each inverter, and the deviation of the filter resonance frequency is analyzed to understand the parallel inverter. The correlation between the number of devices and the size of grid impedance is simulated by PSIM and verified by MATLAB. By connecting the real-time digital simulator Typhoon HILS to the DSP 28377 control board, the mutual interference characteristics are tested under the condition of two inverters running in parallel. The experimental and analysis results are the same, indicating the validity of the analysis.
Journal of Advanced Marine Engineering and Technology
/
제23권3호
/
pp.346-351
/
1999
This paper is a research for removing the hunting which came about during the parallel running of the alternators which four-pole six-phase have the converter with twelve diodes to rectify all the waves. Druing the parallel running the hunting came about under the period of 0.2-0.3{sec} not when it's load was the resistance but the capacity at the rpm band 1575[rpm] 1690[rpm] This hunting in our judgement was not come about from the general hunting causes which have been already known to but the special example. And so we checked that the hunting came about or not as per the changes of the rpm exciting current load current and converter and converter output voltage and the following facts were revealed. -The hunting occured during the constant voltage charging where r. p. m band is from 1575[rpm] to 1690[rpm] - The hunting did not came about during the constant power charging in which there was the large difference between the converter output voltage and the battery voltage. -The hunting did not came about in the low rpm band. We could see from the above facts that the existence of the hunting inducing point at the con-stant voltage charging band was the direct cause of the hunting. After trying every possible means to remove the hunting inducing point we could know that the modification of the synchronous generator is suitable for he purpos in view of the small engine room.
This paper presents a vector control of parallel drive, a beatless control and a low switching PWM technique for the propulsion system of Electric car as transient state which are included interrupting line voltage, changing line voltage slowly, suddenly, regenerating light load and starting from backward running. Improved performance and a validation of proposed method is shown by the experimental results using a 1.65MVA IGBT VVVF inverter and inertia load equivalent to 160 tons electric cars through a running and transient state test.
한국환경과학회 2003년도 International Symposium on Clean Environment
/
pp.73-78
/
2003
In this research, we implement Realtime Air Diffusion Prediction System which is a parallel Fortran model running on distributed-memory parallel computers. The system is designed for air diffusion simulations with four-dimensional data assimilation. For regional air quality forecasting a series of dynamic downscaling technique is adopted using the NCAR/Penn. State MM5 model which is an atmospheric model. The realtime initial data have been provided daily from the KMA (Korean Meteorological Administration) global spectral model output. It takes huge resources of computation to get 24 hour air quality forecast with this four step dynamic downscaling (27km, 9km, 3km, and lkm). Parallel implementation of the realtime system is imperative to achieve increased throughput since the realtime system have to be performed which correct timing behavior and the sequential code requires a large amount of CPU time for typical simulations. The parallel system uses MPI (Message Passing Interface), a standard library to support high-level routines for message passing. We validate the parallel model by comparing it with the sequential model. For realtime running, we implement a cluster computer which is a distributed-memory parallel computer that links high-performance PCs with high-speed interconnection networks. We use 32 2-CPU nodes and a Myrinet network for the cluster. Since cluster computers more cost effective than conventional distributed parallel computers, we can build a dedicated realtime computer. The system also includes web based Gill (Graphic User Interface) for convenient system management and performance monitoring so that end-users can restart the system easily when the system faults. Performance of the parallel model is analyzed by comparing its execution time with the sequential model, and by calculating communication overhead and load imbalance, which are common problems in parallel processing. Performance analysis is carried out on our cluster which has 32 2-CPU nodes.
Water running animals such as basilisk lizards have an advantage of high-speed movement and high power efficiency on water; so researchers in robotic fields have been interested in the water running locomotion. This paper presents prototype-design and experimental study on the fourand six-legged water running robot. Based on the previously proposed quadruped water running robot, we assemble a hexapedal water running robot. The legs of the water running robot are designed based on four-bar parallel link for repeated motion along to pre-defined path. Stability performance of the quadruped and hexapedal water running robot are investigated by experiments on rolling criterion. As a result, hexapedal robot performs better stability than quadruped robot. Based on the hexapedal robot design, we are planning to optimize the position of legs and operating frequency.
In this paper, we present the results of simulation by running parallel VHDL simulation on typical MPP(Massively Parallel Processor) systems such as IBM SP2 and SGI Origin 2000. Parallel simulation uses the synchronous protocol and parallel program is implemented using MPI(Message Passing Interface) based on message passing model, so that it can urn on any parallel programming environment which supports MPI, a standard communication library. And then GVT(Global Virtual Time) computation for parallel simulation is based on the global broadcasting with MPI_Bcast(), which is a standard function in MPI and piggybacking. Our benchmark exhibits that as size of VHDL grows, the parallel simulation has a better performance compared with the sequential simulation. In addition, we also show the results of comparison between IBM SP2 and SGI Origin 2000 by applying the same application to those indirectly.
This paper presents a parallel implementation of stiff-ness matrix calculation based on the processor farm model on a net-work of workstations running PVM programming environment. As the computational characteristics of stiffnes matrix exhibits good po-tentials for effective prallel computation the performance improve-ment is show to be almost linear with the number of sorkstations involved in the computation.
Today's computers, desktops and laptops were build with multi-core architecture. Developing and running serial programs in this multi-core architecture fritters away the resources and time. Parallel programming is the only solution for proper utilization of resources available in the modern computers. The major challenge in the multi-core environment is the designing of parallel algorithm and performance analysis. This paper describes the design and performance analysis of parallel algorithm by taking the Knight Tour problem as an example using OpenMP interface. Comparison has been made with performance of serial and parallel algorithm. The comparison shows that the proposed parallel algorithm achieves good performance compared to serial algorithm.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.