• Title/Summary/Keyword: PERFORMANCE MEASUREMENT

Search Result 6,933, Processing Time 0.035 seconds

An AHP Approach to Evaluate the priorities of Manufacturing Performance Criteria in Korean Automobile Parts Manufacturing Company (AHP에 의한 한국자동차부품제조사의 제조성과기준의 중요도 평가)

  • Kim, Tae-Soo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.3
    • /
    • pp.115-122
    • /
    • 2011
  • The critical role played by manufacturing performance measurement systems in achieving competitive success is increasingly recognized. Developing an integrated performance measurement model is significant for strategic management. This study consist of several principal steps. Performance criteria from the literature and an questionnaire were utilized prior to building the performance model. The AHP(Analytic Hierarchy Process) is utilized to evaluate the weight of each criterion when generating the performance measurement model for Korea automobile parts manufacturing company. AHP analysis showed clear difference in the priority between 5 criteria and 24 sub-criteria in terms of manufacturing performance of Korean automobile parts manufacturing company. The result of priority evaluation in the 5 criteria of 2nd level was ranked quality, cost, delivery, employee, flexibility. And the critical sub-criteria in the 24 sub-criteria of 3rd level was ranked claim rate, process defect rate, outsourcing parts defect rate, ability to quality management innovation, claim cost, etc.

THE STUDY OF MULI-LEVEL PERFORMANCE MEASUREMENT APPROACH FOR VALUE MANAGEMENT OF CIVIL INFRASTRUCTURE PROJECTS

  • Jong-Kwon Lim;Min-Jae Lee;Dong-Youl Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1294-1299
    • /
    • 2009
  • Best value in value engineering has relation to cost and performance. But a severe problem in VE study of a project is to reduce value due to loss of performance, caused by focusing on cost reduction. Also a lack of understanding performance concept, no trial VE workshop as well as cost saving-based policy have not satisfied customer needs. A efficient and practical methodology for accomplishing best value in construction projects is proposed. This study developed a more objective approach for performance measurement approach of mega projects and suggested a systematic process of performance quantitative analysis verifying value improvement. The proposed performance measurement method would be very useful for better communication and consensus between stakeholders and VE team especially through value engineering.

  • PDF

Development of an Performance Evaluation Method for Vehicle Detector Speed Measurement Applying Uncertainty in Measurement (측정불확도를 적용한 차량검지기 속도측정 성능평가방법 개발)

  • Lee, Hwan-Pil;Kim, Yong-Man;Kang, Dong-Yun
    • International Journal of Highway Engineering
    • /
    • v.14 no.2
    • /
    • pp.165-174
    • /
    • 2012
  • In this study, a method for evaluating the performance of speed measurements was developed to assess the qualities of a vehicle detector. The evaluation method considers measurement errors that are reflected in a reference speed. For this, the concept of uncertainty in measurement was applied to the development method. Other factors such as precedent study, statistical processing techniques, and speed measurement performance method of traffic enforcement equipment and vehicle detection systems were also reviewed. Through this process, the problems of the existing evaluation methods were derived and developed for the new performance evaluation method. Vehicle detectors that are installed in the field were evaluated using the traditional assessment methods and the developed method. As a result, for traditional assessment methods, it was found that evaluation criteria are acceptable, while developed method's criteria are not acceptable. This means that traditional assessment methods do not sufficiently consider errors in measurement, so it has potential to over-estimate for performance of evaluation equipment. On the other hand, it was represented that the developed method should include variable factor such as errors in measurement and more precise compared to traditional assessment methods.

Vision-based dense displacement and strain estimation of miter gates with the performance evaluation using physics-based graphics models

  • Narazaki, Yasutaka;Hoskere, Vedhus;Eick, Brian A.;Smith, Matthew D.;Spencer, Billie F.
    • Smart Structures and Systems
    • /
    • v.24 no.6
    • /
    • pp.709-721
    • /
    • 2019
  • This paper investigates the framework of vision-based dense displacement and strain measurement of miter gates with the approach for the quantitative evaluation of the expected performance. The proposed framework consists of the following steps: (i) Estimation of 3D displacement and strain from images before and after deformation (water-fill event), (ii) evaluation of the expected performance of the measurement, and (iii) selection of measurement setting with the highest expected accuracy. The framework first estimates the full-field optical flow between the images before and after water-fill event, and project the flow to the finite element (FE) model to estimate the 3D displacement and strain. Then, the expected displacement/strain estimation accuracy is evaluated at each node/element of the FE model. Finally, methods and measurement settings with the highest expected accuracy are selected to achieve the best results from the field measurement. A physics-based graphics model (PBGM) of miter gates of the Greenup Lock and Dam with the updated texturing step is used to simulate the vision-based measurements in a photo-realistic environment and evaluate the expected performance of different measurement plans (camera properties, camera placement, post-processing algorithms). The framework investigated in this paper can be used to analyze and optimize the performance of the measurement with different camera placement and post-processing steps prior to the field test.

A study on improvement of convergent measurement performance of color display tube using photo sensors (포토 센서를 이용한 브라운관의 컨버젼스 측정 성능 향상에 관한 연구)

  • ;;Zeungnam Bien
    • Journal of the Korean Institute of Telematics and Electronics S
    • /
    • v.35S no.3
    • /
    • pp.93-101
    • /
    • 1998
  • In Integrated Tube Components(ITC) process in themanufacturing of color display tube, we describe the necessity of the convergence measurement method using photo sensors. Compared with methods using 1D or 2D cameras, its characteristics is to use of moving image patterns and fixed sensors. This measurement method is formulated as the measurement problem of the phase difference in phase changing periodic signals. The convergence measurement system using photo sensors, for the good performance, must have a small standard deviation for the repetitive measurement in the same condition and a fast measurement time for thecovergence change. By above two conditions, we proposed the real time measurement algorithm of the pahse difference using fundametal and harmonic in phase changing periodic signals. And, the proposed algorithm is applied to the convergence measurement system.

  • PDF

HSPA/HSPA+ Terminal Signal Measurement Algorithm and Software (HSPA/HSPA+ 단말 신호 측정 알고리즘 및 소프트웨어)

  • Cho, Tae-Kyung
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.60 no.1
    • /
    • pp.37-44
    • /
    • 2011
  • HSPA(High Speed Packet Access)/HSPA+ is a combined 3GPP(Third Generation Partnership Project) standard of HSDPA(High Speed Downlink Packet Access) and HSUPA(High Speed Uplink Packet Access). The standard can provide the high speed multimedia service against the 3GPP release 99 standard. In order to test the 3GPP HSPA/HSPA+ terminal performance, the measurement hardware is required for the evaluate the transmitted signal of HSPA/HSPA+ terminals. Agilent Technologies and Innowireless produce the measurement equipments for HSPA/HSPA+ terminals. Generally speaking, the receiving algorithms in normal modems cannot be used directly to the measurement system due to the lack of the algorithm accuracy. In this paper, we propose the new receiver algorithm for precise measurement of 3GPP HSPA/HSPA+ terminal signal, and implement measurement functionality for performance measurement of the 3GPP HSPA/HSPA+ terminal by using software. The proposed 3GPP HSPA/HSPA+ signal measurement algorithm can be used for the commercial system through code execution speed optimization.

Calibration and INvestigation into Measurement Performance of a Visual Sensing System (시각측정시스템의 캘리브레이션 및 측정성능 검토)

  • Kim, Jin-Young;Cho, Hyung-Suck
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.16 no.8
    • /
    • pp.113-121
    • /
    • 1999
  • It is necessary to calibrate measurement systems to enhance its measurement accuracy. The visual sensing system that is presented in our previous work has to be calibrated, too. It is a multiple mirror system for three-dimensional measurement, which is composed of a camera and a series of mirrors. It is important to calibrate the positions and orientations of the mirrors relative to the camera because they have direct influence on the relationship between the image plane and the task space. This paper presents the calibration method for the visual sensing system. To confirm the measurement performance of the implemented system. its measurement accuracy in measuring the locations in three-dimensional space is investigated. A series of experiments for measuring the locations of the circle-shaped marks are performed. Experimental results show that the sensing system can be effectively used for three-dimensional measurement.

  • PDF

A Case Study on Economic Effect of KPI for TPM Performance Measurement (사례를 통한 TPM 성과측정 KPI의 경제적 효과 산출 방법)

  • Oh, Sangyoung;Son, Yangkyun;Suh, Yongsung;Jeong, Seonphil
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.11
    • /
    • pp.5044-5051
    • /
    • 2012
  • TPM(Total Productive Maintenance) is a methodology to improve corporations' productivity and has been employed widely. At the initial stage of the TPM, we need to set basic plans and goals of the TPM. Also, quantization of performance is required through the TPM activity measurement indices to achieve the plans and the goals. We analyzed measurement factors of TPM activity by observation of previous researches and suggest a measure methodology of economic effect for the TPM performance measurement based on BSC and quantification of qualitative measurement.

An Experimental Study to Improve Measurement Reliability for the Airborne Sound Insulation Performance by Laboratory Test (실험실 실험을 통한 벽체 차음성능 측정의 신뢰성 향상을 위한 실험적 연구)

  • Kim, Hang;Park, Hyeon Ku;Ku, Hee Mo;Kim, Sun-Woo
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.24 no.1
    • /
    • pp.35-44
    • /
    • 2014
  • Sound pressure levels in the receiving room while testing airborne sound insulation performance are varied by the measuring points. This may increase the measurement error, then decrease the measurement reliability. With this reason the research has carried out on the method to reduce deviations of sound pressure level in the ISO type rectangular laboratory focusing on the measurement of airborne sound insulation performance. Tests were made to see the effect of sound absorption in the receiving room, loudspeaker locations, microphones locations and flanking transmission path. Consequently, it was resulted that sound absorption in the receiving room and the loudspeaker location have influence on the sound level deviations especially in the low frequency. The microphone location was very important to get measurement reliability. The effective measuring point, which the sound level difference with average sound pressure level is within 2 dB, could yield most reliable average sound pressure level. Therefore it is necessary to find the effective measuring points in the receiving room. Flanking transmission path should be sealed using sound absorber or magnet etc. to prevent from lowering the sound insulation performance.

A study of the Performance Measurement Based on Lean Construction (린 건설에 기초한 성과측정 방안에 관한 연구)

  • Moon, Hyo-Gi;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.492-495
    • /
    • 2006
  • The performance measurement has been taken with the transformation concept of production, which is considered to be a major cause of existing problems. In order to improving productivity, it is argued that the performance measurement based on Lean Construction is necessary. This study suggests new performance measurement indicators based on work flow ; Reliability, Effectiveness, Efficiency.

  • PDF