• Title/Summary/Keyword: PERFORMANCE MEASUREMENT

Search Result 6,956, Processing Time 0.034 seconds

A study of improvement of uncertainty by repeated measurement for PSD(Platform Screen Door) Performance Test (승강장 스크린 도어 시스템 특성 시험의 반복 측정에 의한 불확도 개선 고찰)

  • Ohn, Jung-Ghun;Kim, Myung-Yong;Yun, Myung-Sang;Kim, Won-Kyong;Won, Si-Tae
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1671-1674
    • /
    • 2007
  • A PSD system has a lot of characteristic for safety. Trust of performance test is very important. But PSD performance test has an effect on trust by proficiency of test staff because it is difficult to automate. In that specially the effort test, manual opening and shutting test and abrasion measurement, test staff is demanded for proficiency. Therefore the paper repeated measurement in same condition and studied proficient factor of examiner according to increased measurement counter. As a result, measurement uncertainty has improved.

  • PDF

Assessment and Validation of the Reliability of Quality Measurement System for Wireless Data Services (무선데이터 서비스 품질 측정 시스템의 신뢰성 검증 및 평가)

  • Choi, Dong-Hwan;Park, Seok-Cheon
    • Journal of Information Technology Services
    • /
    • v.11 no.1
    • /
    • pp.239-246
    • /
    • 2012
  • The user increases around the WiBro and in which the mobile broad band service is the wireless internet base technology HSDPA, that is the cellular phone foundation technique, and moreover the issue about the user effective quality guarantee emerges but the quality control of the wireless network is the incomplete actual condition. Therefore, the reliability verification according to the development of the system for the performance measure for the continued wireless data service and it and evaluation are needed for the quality control. In this paper, the wireless data service quality measurement system was implemented with the design. The same test environment as the existing network performance measurement program was built for the reliability verification of the embodied device for measuring quality and evaluation and the cost performance was performed. It could confirm that design and embodied wireless data service quality measurement system operated accurately in this paper through the quality measure result value analysis.

Revised PPC Measurement Method considering Interfering Float Weight of Task

  • Jung-Sook Yun;Hyung-il Kim;Jung-Ho Yu;Chang-Duk Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1479-1484
    • /
    • 2009
  • It is commonly recognized to need performance management for successful construction project. PPC measurement of Last Planner System is one of construction project measurement method. PPC measurement is quantitatively assessment to go through construction, and that is not completely to be trusted when compare a project with another or an individual case work with another in same project. According to, purpose of this study is comparison indicator establishment that compare project with another or an individual case work with another it is not use PPC measurement for quantitatively assessment to go through construction. The procedure of this study is derive of the point at issue of existing PPC measurement for a aim PPC measurement in this study expenditure and select weight about that and it is applied to actually construction.

  • PDF

Precision Current Measurement of Magnet Power Supply at the PLS-II (포항가속기연구소 전자석전원장치 출력 전류 정밀 측정)

  • Kim, Sung-chul;An, Suk-Ho
    • Proceedings of the KIPE Conference
    • /
    • 2016.07a
    • /
    • pp.67-68
    • /
    • 2016
  • The accurate measurement of magnet power supplies (MPS) output currents is essential to delivering stable and repeatable currents to magnets in particle accelerators. An essential element in guaranteeing and evaluating the required performance is the current measurement device and methode. In this paper, we discuss instrument and methods for precision current measurement and performance of the PLS-II MPS.

  • PDF

Novel Technology for View Angle Performance Measurement

  • Rykowski, Ronald;Lee, Jong-Seo
    • 한국정보디스플레이학회:학술대회논문집
    • /
    • 2008.10a
    • /
    • pp.1358-1361
    • /
    • 2008
  • Several different techniques currently exist for measuring display view angle performance. These include conoscopes, goniometric systems, and, most recently introduced to the market, instruments based on Imaging Sphere technology. This paper will compare measurement accuracy and speed of these various methodologies with different FPD types and even 3-D displays.

  • PDF

A Study on the Insulation Performance of Impact Sound Level by Striking Location of Floor Slab (바닥 슬라브의 가진 위치에 따른 차음성능에 관한 연구)

  • Song, Pil-Dong;Park, Myung-Kil;Ham, Jin-Sik
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2003.11a
    • /
    • pp.73-76
    • /
    • 2003
  • This paper is contents about method to measure interception performance of shock noise of floor slab of apartment house to be simple. In the case of interception performance of light floor impact sound level, according to measurement method, grade of sound insulation performance showed greatly differently. But, in the case of interception performance of heavy floor impact sound level, it was similar result in all measurement method. Therefore, use of simple method of measurement was examined by possible fact in case of interception performance of heavy floor impact sound level.

  • PDF

The Necessity of Performance Goal Setting Phase for Construction Project (건설사업 성과목표수립 단계의 필요성에 관한 연구)

  • Jeon, Me-Yeon;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.159-162
    • /
    • 2011
  • The goal setting and performance measurement is essential tool for performance management. If appropriate goal setting and performance measurement is not done, problems may arise in the management. Therefore, in order to improve the efficiency of building production that management is essential. In addition, the construction project objectives established at the planning phase give considerable influence on the success of the construction project. Therefore, objective of this paper is to suggest the necessity of performance goal setting phase. This paper analyzes problems of goal setting phase and suggests the way to improve about problems.

  • PDF

A Development and Performance Test of Voltage Measurement Accuracy Assessment System for Distribution Equipment (배전기기 전압계측 정밀도 평가시스템 개발 및 성능시험)

  • Cho, Jin-Tae;Kim, Ju-Yong;Lee, Hak-Ju;Kim, Jae-Han
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.27 no.9
    • /
    • pp.83-89
    • /
    • 2013
  • Power distribution system has been changed from radial system to closed loop or mesh system due to connection of distributed generation growth. Data from distribution equipments which are installed at distribution line is required to be accurate for the performance of DMS(Distribution Management System). This paper analyzes the voltage measurement data from distribution equipment. However, the results of the analysis are confirmed to have some errors in voltage measurement data from distribution equipment. These errors come from aging of voltage sensor in distribution equipment and inaccurate data transfer to FRTU(feeder remote terminal unit) through the controller. The main problem is that the voltage measurement data of distribution equipment can not be assessed after it's first installation at the distribution line. The voltage measurement accuracy assessment system is to assess the voltage measurement data from distribution equipment on hot-line. This study had a field test to verify the performance of system.

Project Performance Evaluation and Workload Monitoring Technique by Using Input/Output Bipolar Diagram

  • Lee, Jung-Gyu;Jeong, Seung-Ryul
    • Journal of Internet Computing and Services
    • /
    • v.18 no.4
    • /
    • pp.79-87
    • /
    • 2017
  • Company A, an embedded system manufacturer, provides its products to Company P which is the parent company of Company A. Both companies learned that they needed to find over 4,000 bugs before market release in order to meet the acceptable quality level. Traditionally, they had utilized time-series line graphs as their common performance measurement tool. These graphs compared accumulated numbers of bugs fixed with accumulated numbers of bugs found. Engineers in Company A had been under pressure to improve the process capacity because the line for bugs fixed was always below than the line for bugs found. By using a newly designed Bipolar diagram, engineers in Company A analyzed the process performance. And they were in a position to be more flexible for internal or inter-companies meeting. Authors explain an empirical study of a graphical and practical performance measurement tools relating to mainly the Bipolar diagram. As a result, the Bipolar diagram provides workload monitoring and performance measurement functions in a given timeframe by using the concepts of Optimum Process Line (or band) and Fair Process Capacity Zone.

Evaluation of Performance Measurement System Alternatives for Construction Companies (건설기업에 적합한 성과측정시스템/Framework의 대안 평가)

  • Kim Ki-Hyon;Yu Il-Han;Shin Dong-Woo;Kim Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.398-403
    • /
    • 2004
  • Construction companies have been required high technique and integration of management. Because they not only have got high competition, variation of customer's demands, social and economical changes but also more complex and specialization. Construction companies require performance measurement to exclude inefficiency and be aware of their business performance level, but domestic construction industry does not have adequate performance measurement system like as manufacture industry or business administration. So this paper evaluate of performance measure system alternatives for construction companies.

  • PDF