본 논문은 전기자동차용 통합 PCU의 개발에 관한 것으로서 상용전원을 입력으로 하여 전기자동차의 배터리를 충전하는 Charger 부분과, 충전된 배터리를 입력전원으로 하여 전기차의 구동용 모터를 동작시키는 Inverter 부분이 통합 구성되어 있다. 이를 위해 서로 분리된 Charger부와 Inverter부를 하나의 회로로 통합함으로써 부피와 무게 측면에서 차량 내부의 한정된 공간에 적합할 뿐만 아니라 가격절감 및 신뢰성 측면에 있어서 이점을 가지고 있다.
This paper describes the transmission method of an information using communication networks between RTU(Remote Terminal Unit) and PCU(Protection and Control System) of the DC switchgear for Light Railway Vehicle. Also the test result carried out in the laboratory was represented. In this test, transmission signal waveform, polling time, response time and request/response frame between RTU and PCU were measured. The field test including the measurements of analog signal and status of the digital logic operation of PCU was conducted in Gyeongsan Test Track.
Park, Han Young;Kim, Jin Young;Ahn, Sung Soo;Kang, Joonhee
Journal of the Institute of Electronics and Information Engineers
/
v.50
no.5
/
pp.269-274
/
2013
To proportionally control the electronic valve position of the actuator, we designed and fabricated PCU, CPT, and rotary absolute optical encoder for the detection of absolute angular position in the actuator. We also designed and constructed the test system by using DAQ hardware and Labview. We designed PCU to convert 1-5 V, 0-5 V, 0-10 V, 2-10 V voltage signals and 4-20 mA current signals to the voltage signals in the common 0.5-2.5 V range. We designed CPT to output 4-20 mA current signals corresponding to the valve positions based on the PWM signal input from the MCU. We also designed 20 bit optical encoder by using infrared LED and infrared transistor and made the serial communication with the main board possible. When we tested PCU and CPT with DAQ hardware and Labview software, they operated correctly with the small errors within ${\pm}0.003$ V and ${\pm}0.01$ mA, respectively, showing that our actuator has the excellent performance to employ as the industrial proportional-valve-actuator. The resolution of the encoder was $11.25^{\circ}$ and the maximum revolution to detect was 32,768.
Journal of the Korean Institute of Telematics and Electronics B
/
v.33B
no.3
/
pp.193-201
/
1996
The space power system for communication satellite which employs the direct energy transfer (DET) method consists of solar array, battry, shunt regulator, charger/discharger and power control unit (PCU). In this paper, the development of the DET power system charger/discharger unit and a microprocessor based PCU is developed for simplicity and flexiblity in the modificatin of control algorithm. A 28V bus voltage, 400W power rting power simulator is built and tested to verify the operation of the simulator at each mode and the stability of mode transition is analyzed.
Lee H.D.;Jeon Y.J.;Kim S.N.;Baek B.S.;Ryu S.P.;Seo K.D.
Proceedings of the KIEE Conference
/
summer
/
pp.953-955
/
2004
This paper describes the information transmission method using communication networks between Remote Terminal Unit(RTU) and Protection and Control system(PCU) of the direct current switchgear for Light Railway Vehicle, and also represents the test result, which carried out in the laboratory. In this test, transmission signal waveform, polling time, response time and request/response frame were measured between RTU and PCU. The field test including the measurements of analog signal and status of the digital logic operation of PCU will be conducted in near future.
In this study, the chromosome-encoded pcuRCAXB genes that are required for p-cresol degradation have been identified by using a newly constructed green fluorescent protein (GFP)-based promoter probe transposon in the long-chain alkylphenol degrader Pseudomonas alkylphenolia. The deduced amino acid sequences of the genes showed the highest identities at the levels of 65-93% compared with those in the databases. The transposon was identified to be inserted in the pcuA gene, with the promoterless gfp gene being under the control of the pcu catabolic gene promoter. The expression of GFP was positively induced by p-cresol and was about 10 times higher by cells grown on agar than those in liquid culture. In addition, p-hydroxybenzoic acid was detected during p-cresol degradation. These results indicate that P. alkylphenolia additionally possesses a protocatechuate ortho-cleavage route for p-cresol degradation that is dominantly expressed in colonies.
발전용 연료전지 시스템은 수소와 산소를 공급받아 직류전기와 열로 변화시키는 연료전지 스택, 연료전지 스택에 연료와 공기를 공급해주는 MBOP(Mechanical Balance Of Plant), 연료전지의 출력을 계통에 연계시키는 EBOP(Electrical Balance Of Plant)로 구성된다. EBOP 시스템은 병렬 연결된 1.5MW PCU(Power Conversion Unit)로 구성되며, 각 PCU는 750kW 인버터가 병렬로 구성된다. 본 논문에서는 4병렬로 구성된 3MW급 연료전지용 EBOP의 병렬제어 알고리즘을 소개한다. 제안한 병렬제어 알고리즘은 과도응답이 빠르고 순환전류가 없는 제어특성을 가진다. 그리고 시뮬레이션과 실험으로 제안한 알고리즘의 성능을 확인한다.
3kW grid-connected photovoltaic(PV) systems and data acquisition system are constructed for performance analysis of PV system at field demonstration test center of Gwang-Ju in Korea. As climatic and irradiation conditions are varied, operation characteristics of the PV system are collected and analyzed in data acquisition system. From these results, the performances of PV systems have simulated and evaluated using simulation tool In comparison with actual value of data acquisition system of field demonstration test center. Furthermore, performance of each PV system e.g. electric power and loss factor is reviewed.
This paper is about the method by which Power Control Unit(PCU) of Control Rod Control System(CRCS) logs events in the system and the real-time monitoring display. This method enables the functions like the event logging of Control Rod Drive Mechanism(CRDM)/power Cabinet, the off-line show of the event data logged and the on-line show by communication between the PCU and the monitoring display. Operators in a nuclear power plant must be able to grasp any possible abnormal states correctly. Because our newly designed system has a good ability to log and display the kinds, tine, and the prior and posterior states of urgent or non-urgent events, the operators can judge, maintain and repair the abnormal event more easily.
Under unsaturated capacity conditions with balanced approach flows, roundabout gives less delay and queue length than existing signalized intersections; however, over capacity conditions with unbalanced approach flows(flow above 450 pcu/h/lane), roundabouts efficiency drops due to the short gap between entering vehicles and circulating vehicles. This study provides a roundabout Signal Metering transfer standard and operation method. In this study, a four-way-approach with one-lane roundabout is selected to compare the Signal Metering performance for the case of unbalanced flow conditions. The performance is evaluated by using SIDRA software in terms of average delay and queue length. The result shows that the Signal Metering provides substantial improvements for the case of total approach flow is 1,800~2,000 pcu/h in which the main approach flow ratio is 60~70% gives 30~40% less delay and 30~60% less queue length than normal roundabout operation. Also, it is approved that operational performance saving can be achieved when the Metered Approach is selected adjoining to the main approach in pair.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.