• Title/Summary/Keyword: Overtopping

Search Result 217, Processing Time 0.025 seconds

A Design of Disaster Prevention System and Detection of Wave Overtopping Number for Storm Surge base on CCTV (CCTV를 활용한 폭풍 해일의 월파 횟수 탐지 및 방재 시스템 설계)

  • Choi, Eun-Hye;Kim, Chang-Soo
    • Journal of Korea Multimedia Society
    • /
    • v.15 no.2
    • /
    • pp.258-265
    • /
    • 2012
  • Our country is suffering from many human victims and property damages caused to occur great and small tidal waves in southern areas every year. Even though there were progressing many researches for storm surges, it was required more researches for detection of tidal wave and prevention system of its which can be applied in practical living fields. In this paper, we propose the disaster prevention system that can approximately detect a dangerousness of coast flooding and number of overtopping per time based on images of CCTV considering actual field application. And if it is detected a hazard of flooding of coast, the proposed detection system for tidal wave based GIS is quickly informed the areas of flooding to manager. The analyzing results of CCTV image of this proposed are derived from difference images between photos of fine day and photos or videos which are taken for the typhoon which is called "DIANMU" at our laboratory.

Hazard Evaluation of Levee by Two-Dimensional Hydraulic Analysis (2차원 수리해석에 의한 하천 제방 위험도 평가분석)

  • Park, Jun Hyung;Kim, Tae Hyung;Han, Kun Yeun
    • Journal of Wetlands Research
    • /
    • v.18 no.1
    • /
    • pp.45-57
    • /
    • 2016
  • Levee safety is being evaluated using one of the several failure causes including overtopping, infiltration and erosion or 1D hydraulic analysis considering physical characteristics of levee in practical engineering works. However, mentioned evaluation methods are not able to consider various failure causes of levee at the same time and to get reliable results where requires the accurate topographic information. This study proposed the flood hazard index which is able to consider several hazard factors involving overtopping, infiltration and erosion risk simultaneously. The index was generated from results of 2D hydraulic analysis reflecting accurate topographic information. The study areas are the confluences of the Nakdong River and two streams(Gamcheon and Hoecheon). Levee safety was evaluated using results based on 2D hydraulic analysis considering riverbed changes of before and after dredging work in the study area. This study will contribute to estimate the reliable safety evaluation of levee where may have hazards during extreme flood events.

Assessment of Levee Slope Reinforced with Bio-polymer by Image Analysis (영상분석을 통한 바이오폴리머로 보강된 제방사면 안정성 해석)

  • Ko, Dongwoo;Kang, Joongu
    • Ecology and Resilient Infrastructure
    • /
    • v.6 no.4
    • /
    • pp.258-266
    • /
    • 2019
  • This study was conducted to apply natural river technologies to levees and examine the results. The new eco-friendly bio-polymer was applied, a combination of eco-friendly biopolymers and soil, to levee slope to enhance durability and eco-friendliness and to establish reinforcement measures against unstable levees due to overtopping. A semi-prototype levee of 1 m in height, 3 m in width, with a 1:2 slope and 5 m length, was constructed at the Andong River Experiment Center. The bio-soil mixed with the biopolymer and the soil at an appropriate ratio was treated with a 5 cm thickness on the surface of levee to perform the stability evaluation according to overtopping. Using the pixel-based analysis technique using the image analysis program, the breached area of levee slope was calculated over time. As a result, the time for complete decay occurs more than 12 times than that of ordinary soil levee. Therefore, when the new substance is applied to the surface of levee, the decay delay effect appears to be high.

Calculation of overtopping discharge with time-dependent aspects of an embankment failure (시간에 따른 제방붕괴 양상을 고려한 월류량 산정)

  • Kim, Hyung-Jun;Kim, Jong-Ho;Jang, Won-Jae;Cho, Yong-Sik
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.7 no.3
    • /
    • pp.69-78
    • /
    • 2007
  • In this study, a time-dependent aspect of an embankment failure is considered to simulate a flood inundation map and calculate overtopping discharge induced by an embankment failure. A numerical model has been developed by solving the two dimensional nonlinear shallow water equations with a finite volume method on unstructured grids. To analyze a Riemann problem, the HLLC approximate Riemann solver and the Weighted Averaged Flux method are employed by using a TVD limiter and the source term treatment is also employed by using the operator splitting method. Firstly, the numerical model is applied to a dam break problem and a sloping seawall. Obtained numerical results show good agreements with experimental data. Secondly, the model is applied to a flow induced by an embankment failure by assuming that the width and elevation of embankment are varied with time-dependent functions. As a result of the comparison with each numerical overtopping discharge, established flood inundation discharges in the previous studies are overestimated than the result of the present numerical model.

Application based on the strictly combined method of BEM and CADMAS-SURF (BEM-CADMAS-SURF 결합해석법에 기초한 수치조파수조의 응용)

  • Kim, Sang-Ho;Yamashiro, Masaru;Yoshida, Akinori;Shin, Seung-Ho;Hong, Key-Yong
    • Journal of Navigation and Port Research
    • /
    • v.33 no.1
    • /
    • pp.65-70
    • /
    • 2009
  • The hybrid numerical model is developed by combining BEM that can calculate the wave motion rapidly under the potential theory and CADMAS-SURF that solves Navier-Stokes equations for the free surface variation near the structure, In the hybrid model the calculation of wave motion in a wide field of wave reflection for deep water area is conducted by BEM but for shallow water area by CADMAS-SURF. Especially the hybrid model can calculate random wave motions for long term period more rapidly with almost similar accuracy than the calculation of wave motion which was carried out by CADMAS-SURF only. In this study the coupling model was applied to the calculation of the strong nonlinear wave motion such as wave runup and overtopping at the coastal structure on the mild-slope bottom and the results of numerical model were compared with the Toyosima's experiments of regular wave runup and Goda's design diagram of ramdom wave overtopping, respectively.

Uncertainty Analysis for Dam-Break Floodwave Simulation (댐 붕괴 홍수모의에 대한 불확실도 해석)

  • Lee, Hong-Rae;Han, Geon-Yeon;Jo, Won-Cheol
    • Journal of Korea Water Resources Association
    • /
    • v.31 no.3
    • /
    • pp.337-345
    • /
    • 1998
  • DAMBRK-U model is developed for the evaluation of overtopping risk of dam and levee and for the estimation of uncertainty in floodwave simulation. The original algorithm is revised and expanded to include Monte-Carlo analysis to estimate them. The model is tested by applying to hypothetical channels of widening, uniform and narrowing geometry. Larger variation in discharge and water depth are expected at narrower sections of a river. It is calibrated by applying to the Hantan River, where severe damages from Yunchun dam-break and levee overtopping occurred on July, 1996. Overtopping risk of dam is calculated for various discharge conditions for Yunchun-dam, and that of levee is also calculated by comparing levee height with flood level at Hantan recreation area. Simulation results show that the overflow depth of flood level is 1,266~0.782 m and the overflow risk turns out to be 100%.

  • PDF

Experimental Investigation of Wave Force on the Pavement behind Crown Wall of Rubble Mound Seawall (경사식 호안 상부구조물 배후 포장체에 작용하는 파력에 대한 실험적 연구)

  • Ko, Haeng Sik;Lee, Jooyeon;Jang, Se-Chul;Oh, Sang-Ho
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.34 no.1
    • /
    • pp.19-25
    • /
    • 2022
  • Physical experiments were conducted to establish an empirical formula that predicts the wave force on the upside of the pavement behind crown wall of rubble mound seawall due to wave overtopping as well as the uplift force on the downside of the pavement. The experiments were performed by different conditions of the parapet, water depth, relative freeboard, and thickness of the armour layer. Then, the wave force on the upside and downside of the pavement behind the crown wall was analyzed. The parameters that affect the wave overtopping force and the uplift force were identified and empirical formulae were suggested for evaluating the forces on the pavement.

Retardation Effect on the Breach of the Earth Filled Embankment Using the Stiffener During Overtopping (흙댐 제체의 보강재 설치에 따른 월류붕괴 지연효과)

  • Joo, Yo Han;Yeo, Chang-Geon;Lee, Seung Oh
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1377-1387
    • /
    • 2013
  • Most embankment of the reservoirs (99.1 %) have been constructed in the earth filled type in Korea because the construction of this type is less expensive and simpler than others such as concrete one. However, it has to be reinforced the slope to prevent the breach due to overtopping or piping under unexpected flood conditions. This study has been analyzed the retardation effect using three types (L, T, $L^*$ shape) of stiffener in order to reinforce embankment when they are collapsed by overtopping flow. Experimental results showed that L-type stiffener is the most effective in delaying the breaching of embankment and reducing the soil erosion when compared with others. The reinforced embankment breaching showed that time delay was occurred about 1.73 to 2.29 times and the peak flowrate was reduced compared to non-stiffener embankments due to energy dissipation by collision and less soil erosion. The embankment breaching mostly leads to major damages because of the lack of repair time. Thus, since these stiffeners can resist the rapid breach, it would be possible to earn the time to emergency repair and lifesaving, as well as reduction of damages of embankment in downward region with decreasing peak flowrate. Results from this study would be used for the basis when establishing the emergency action plan for the reservoirs on the verge of hazard.