DOI QR코드

DOI QR Code

Assessment of Levee Slope Reinforced with Bio-polymer by Image Analysis

영상분석을 통한 바이오폴리머로 보강된 제방사면 안정성 해석

  • Ko, Dongwoo (School of Constructional Disaster Prevention, Kyungpook National University) ;
  • Kang, Joongu (River Experiment Center, Korea Institute of Civil Engineering and Building Technology)
  • 고동우 (경북대학교 건설방재공학부) ;
  • 강준구 (한국건설기술연구원 하천연구센터)
  • Received : 2019.11.26
  • Accepted : 2019.12.09
  • Published : 2019.12.31

Abstract

This study was conducted to apply natural river technologies to levees and examine the results. The new eco-friendly bio-polymer was applied, a combination of eco-friendly biopolymers and soil, to levee slope to enhance durability and eco-friendliness and to establish reinforcement measures against unstable levees due to overtopping. A semi-prototype levee of 1 m in height, 3 m in width, with a 1:2 slope and 5 m length, was constructed at the Andong River Experiment Center. The bio-soil mixed with the biopolymer and the soil at an appropriate ratio was treated with a 5 cm thickness on the surface of levee to perform the stability evaluation according to overtopping. Using the pixel-based analysis technique using the image analysis program, the breached area of levee slope was calculated over time. As a result, the time for complete decay occurs more than 12 times than that of ordinary soil levee. Therefore, when the new substance is applied to the surface of levee, the decay delay effect appears to be high.

이 연구는 자연에 기반을 둔 하천기술을 제방에 적용하여 그 효과를 평가하기 위해 수행되었다. 친환경 신소재 바이오폴리머를 제체 표면에 적용하여 내구성과 친환경성을 증진시킴과 동시에 월류에 대응하기 위한 제방의 보강 대책을 수립하고자 하였다. 안동하천연구센터에 현장토를 사용하여 높이 1 m, 마루 폭 3 m, 사면경사 1:2, 총 길이 5 m의 중규모 제방모형을 제작하였으며, 바이오폴리머와 흙을 적정 비율로 혼합한 바이오-소일 (bio-soil)을 제방 전면에 5 cm 두께로 도포하여 월류 발생에 대한 제방의 안정성 평가 실험을 수행하였다. 영상분석 프로그램을 이용한 픽셀기반 분석 기법을 적용하여 시간에 따른 제방사면의 붕괴면적을 산정하였으며 그 결과, 신소재 적용 제방의 경우 완전붕괴가 발생하는 시간은 일반 흙 제방에 비해 12배 이상 증가해서 붕괴지연효과가 상당히 높은 것으로 나타났다.

Keywords

References

  1. An, J.H., Jeong, H.S. and Kim, E.S. 2018. Effects of the ${\beta}$-Glucan- and Xanthan gum-based Biopolymer on the Performance of Plants Inhabiting in the Riverbank. Ecology and Resilient Infrastructure, 5: 180-188 (in Korean). https://doi.org/10.17820/eri.2018.5.3.180
  2. Caballero, S., Acharya, R., Banerjee, A., Bheemasetti, T.V., Puppala, A., Patil, U. 2016. Sustainable Slope Stabilization Using Biopolymer-Reinforced Soil. In Geo-Chicago; ASCE Library: Reston, VA, USA.
  3. Chang, I.H. and Cho, G.C. 2012. Strengthening of Korean residual soil with b-1,3/1,6-glucan biopolymer. Construction and Building Materials. 30: 30-35. https://doi.org/10.1016/j.conbuildmat.2011.11.030
  4. Chang, I.H., Im, J.Y., Lee, S.W. and Cho, G.C. 2017. Strength durability of gellan gum biopolymer-treated Korean sand with cyclic wetting and drying. Construction and Building Materials, 143: 210-221. https://doi.org/10.1016/j.conbuildmat.2017.02.061
  5. Chang, I.H., Im, J.Y., Prasidhi, A.K. and Cho, G.C. 2015. Effects of Xanthan gum biopolymer on soil strengthening. Construction and Building Materials, 74: 65-72. https://doi.org/10.1016/j.conbuildmat.2014.10.026
  6. Chinnarasri, C., Jirakitlerd, S. and Wongwises, S. 2004. Embankment dam breach and its outflow characteristics. Journal of Civil Engineering and Environmental Systems, 21: 247-264. https://doi.org/10.1080/10286600412331328622
  7. Guyer, J.P. 2017. An Introduction to Soil Cement for Protection of Levees; CreateSpace Independent Publishing Platform: Scotts Valley, CA, USA.
  8. Joo, Y.H., Yeo, C.G. and Lee, S.O. 2013. Retardation Effect on the Breach of the Earth Filled Embankment Using the Stiffener during Overtopping. Journal of the Korean Society of Civil Engineers, 33: 1377-1387 (in Korean). https://doi.org/10.12652/Ksce.2013.33.4.1377
  9. Kakinuma, T. and Shimizu, Y. 2014. Large-Scale Experiment and Numerical Modeling of a Riverine Levee Breach. Journal of Hydraulic Engineering, 140.
  10. Kim, J.M., Cho, W.B., Choi, B.H. and Oh, E.H. 2015. Model tests for deriving failure parameter during levee overflow. Journal of Korean Geosynthetics Society, 14: 11-21. (in Korean)
  11. Kim, Y.S., Jeong, W.S., Seok, T.R. and Im, A.S. 2006. Strength Characteristics of Cemented Sand of Nak-dong River. Journal of the Korean Geoenvironmental Society, 7: 43-52.
  12. Ko, D.W. and Kang, J.G. 2018. Analysis of Breach Mitigation Effect on Levee made with New Substance by Overtopping. Journal of the Korea Academia-Industrial cooperation Society, 19: 1-8 (in Korean).
  13. Ko, D.W. and Kang, J.G. 2018. Experimental studies on the stability assessment of a levee using reinforced soil based on a biopolymer. Water, 10: 1059. https://doi.org/10.3390/w10081059
  14. Korea Advanced Institute of Science and Technology. 2011. METHOD OF STABILIZATION IN SOIL USING BIOPOLYMER. No: 1020110033093.
  15. Korea Advanced Institute of Science and Technology. 2015. SOIL BUILDING MATERIAL USING BIOPOLYMER. No: 1020150056859.
  16. Korean Design Standard, KDS 51 60 05: 2016 (in Korean).
  17. Kurakami, Y., Nihei, Y., Yada, K., Yamazaki, T., Yamaguchi, S., Kawabe, S., Kikuchi, Y. and Tatsuoka, F. 2013. Reinforcing Technology of River Levee for Increasing Resistance against Overflow Erosion. Journal of Japan Society of Civil Engineers, 69: 1219-1224. (in Japanese)
  18. Larson, S. and Newman, J.K. 2013. Biopolymer as an alternative to petroleum based polymers to control soil erosion: Lowa Army Ammunition Plant. COST& PERFORMANCE REPORT. Project: ER-200920. US.
  19. Orendorff, B., AI-Riffai, M., Nistor, L. and Rennie, C. D. 2013. Breach outflow characteristics of non-cohesive embankment dams subject to blast. Canadian Journal of Civil Engineering, 40: 243-253. https://doi.org/10.1139/cjce-2012-0303
  20. Pickert, G., Weitbrecht, V. and Bieberstein, A. 2011. Breaching of overtopped river embankments controlled by apparent cohesion. Journal of Hydraulic Research, 49: 143-156. https://doi.org/10.1080/00221686.2011.552468
  21. Powledge, G., Ralston, D., Miller, P., Chen, Y., Clopper, P. and Temple, D. 1989. Mechanics of overflow erosion on embankments. II: Hydraulic and design considerations. Journal of Hydraulic Engineering, 115: 1056-1075. https://doi.org/10.1061/(ASCE)0733-9429(1989)115:8(1056)
  22. Schmocker, L. and Hager, W. H. 2011. Plane dike-breach due to overtopping: Effects of sediment, dike height and discharge. Journal of Hydraulic Research, 50: 576-586. https://doi.org/10.1080/00221686.2012.713034
  23. Thornton, C., Hughes, S. and Scholl, B. 2012. Full-Scale Testing of Levee Resiliency During Wave Overtopping. Sixth International Conference on Scour and Erosion, 1215-1222.
  24. Wang, Z., Zhao, B. and Royal, A.C.D. 2017. Investigation of Erosion of Cement-Bentonite via Piping. Advances in Materials Science and Engineering.
  25. Zhang, J., Li, Y., Xuan, G., Wang, X. and Li, J. 2009. Overtopping breaching of cohesive homogeneous earth dam with different cohesive strength. Science in China Series E: Technological Sciences, 52: 3024−3029. https://doi.org/10.1007/s11431-009-0275-1
  26. Zhu, Y., Visser, P. and Vrijling, J. 2006. Laboratory observations of embankment breaching. International Conference on Hydroscience and Engineering.