• Title/Summary/Keyword: Overseas LNG plant

Search Result 9, Processing Time 0.024 seconds

Risk Identification and Priority method for Overseas LNG Plant Projects - Focusing on Design Phase - (해외 LNG 플랜트 리스크요인 도출 및 우선순위 평가 - 설계단계를 중심으로 -)

  • Jang, Woo-Sik;Hong, Hwa-Uk;Han, Seung-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.146-154
    • /
    • 2011
  • Korean contractors have been maintained sustainable growth since entering into overseas construction market for the first time in 1960' s. In 2010, Korean contractors ordered 761 billion (USD) from overseas markets. Especially, billion (USD) were earned by Korean contractors in overseas plant construction market which account for more than 80% of the total amount by Korean contractors. Nevertheless, many Korean contractors are suffering from lack of technological competitiveness and construction management skills in the design phase compared with global leading contractors. These conditions have directly effect on the success of projects in terms of cost, duration, and quality. So, this study focused on identifying the risk factors and developing risk priority method for the design phase of LNG plant projects whose market is expanding. Research procedures were conducted by the following three steps. First, total 57 risk factors were identified in design phase through extensive literature reviews and experts survey. Second, the authors developed risk priority method which are more suitable for design phase of LNG plant projects by using three criteria, Probability(P), Impact(I), and Coordination Index(CI). Finally, the suitability of risk priority method and practical applicability were verified through expert survey and interview. Consequently, if korean contractors use the suggested risk factors and priority method based on their own know-how and experiences, then more reasonable and rational risk management will be conducted in the design phase of LNG plant projects.

Development of Risk-Based Inspection(RBI) Technology for LNG Plant Based on API RP581 Code (API RP 581 Code를 기반으로한 LNG 플랜트의 Risk-Based Inspection(RBI) 기술 개발)

  • Choi, Song-Chun;Choi, Jae-Boong;Hawang, In-Ju
    • Corrosion Science and Technology
    • /
    • v.11 no.5
    • /
    • pp.179-183
    • /
    • 2012
  • As one of promising solutions to overcome high oil price and energy crisis, the construction market of high value-added LNG plants is spotlighted world widely. The purpose of this study is to introduce LNG-RBI system to develop risk assessment technology with RAM(Reliability, Availability, Maintainability) modules against overseas monopolization. After analyzing relevant specific features and their technical levels, risk assessment program, non-destructive reliability evaluation strategy and safety criteria unification class are derived as core technologies. These IT-based convergence technologies can be used for enhancement of LNG plant efficiency, in which the modular parts are related to a system with artificial optimized algorithms as well as diverse databases of facility inspection and diagnosis fields.

Development of a Decision Making Model for Construction Management in LNG Plant Construction - Focused on Construction Stage - (LNG 공사의 건설사업관리 의사결정지원모델 개발 - 시공단계 중심 -)

  • Park, Hwan Pyo;Han, Jae Goo;Chin, Kyung Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.47-57
    • /
    • 2014
  • LNG plant projects tend to be implemented in overseas owing to its characteristics, so their project management scheme is somewhat different from those of general projects. Value chain in a LNG plant project includes exploration/production of gases, physical liquefaction/chemical conversion processes, transportation and storage. Key factors in the chain include liquefaction process (including ultra-low temperature liquefaction) to convert natural gas into liquid materials or fuel, and Front End Engineering Design (FEED) package, as well as Engineering, Procurement and Construction (EPC) technology comprising control, operation and construction. Success of a complex LNG plant project implemented in overseas depends on decision-making process in project management. Accordingly, to develop a decision-making model in of plant construction, the study extracted none factors in project management by EPC stage and assessed importance of each factor. The result showed that items in both project management and project risk management are important. Especially, the study developed a decision-making model in the construction stage of a LNG plant project based on the project management factors and importance assessment. The developed decision-making model would lay groundwork in building a decision-making system in construction stage of project management.

Analysis of Pre-construction Processes and Development of KMS Prototype of LNG Plant Projects (해외 LNG Plant 프로젝트 초기 프로세스 분석 및 지식관리시스템 프로토타입 구축)

  • Won, Seo-Kyung;Lee, Jun-Bok;Han, Choong-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.151-159
    • /
    • 2009
  • Recently, overseas construction projects have been increasing in the Middle East and Southeast Asia regions. These projects require various licenses and technologies for the manufacturing and handling processes. Additionally, the efficiency of the entire process management life cycle determines the success or failure of the business. Nonetheless, there exist various risks involved in the whole life cycle process due to a lack of experience and knowledge of management techniques. The objective of this paper is to analyze the business process of a LNG plant throughout the pre-construction and procurement phases, and to identify the knowledge and information needed for the development of the KMS. The study also plans to build a comprehensive knowledge management system throughout the whole life cycle as its final objective.

Risk Assessment Technology of LNG Plant System (액화천연가스 플랜트 시스템 위험도평가 기술)

  • Choi, Song-Chun;Ha, Je-Chang;Lee, Mee-Hae;Jo, Young-Do;Chang, Yoon-Suk;Choi, Shin-Beom;Choi, Jae-Boong
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.29 no.2
    • /
    • pp.162-170
    • /
    • 2009
  • As one of promising solutions to overcome high oil price and energy crisis, the construction market of high value-added LNG plants is spotlighted world widely. The purpose of this manuscript is to introduce domestic activities to develop risk assessment technology against overseas monopolization. After analyzing relevant specific features and their technical levels, risk assessment program, non-destructive reliability evaluation strategy and safety criteria unification class are derived as core technologies. These IT-based convergence technologies can be used for enhancement of LNG plant efficiency, in which the modular parts are related to a system with artificial optimized algorithms as well as diverse databases of facility inspection and diagnosis fields.

Development of Business Process Model for Overseas Natural Gas Pipeline Project at the Project Planning Phase (해외 천연가스 파이프라인 사업 진출을 위한 사업계획단계 의사결정 프로세스 모델 구축)

  • Sin, Eonill;Han, Seung-Heon;Jang, Woosik;Lee, Yong-Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5D
    • /
    • pp.473-481
    • /
    • 2012
  • Demand of Natural Gas (NG) consumption is continuously increasing by long service life and low environmental impact than other fossil fuels. Because of this reasons, Gas wells exploration and huge LNG plant construction project are being boosted world-widely. Especially, overseas NG pipe-line projects are emerging by considering safe and efficiency at the inter-country sections. At the same time, Korean contractors are being achieved to record-breaking performance at 2011's overseas construction market and 80% of new-record was attained from overseas plant construction projects. Nevertheless, Korean contractors are behind than overseas leading contractors by geographical distance from gas wells and concentrated demand for storage plant. In these reasons, this paper aims to develop the standardized business process model(BPM) for overseas NG pipe-line project at project planning phase to support the project entry. To this aim, first of all, extract the BPM through the broad literature and overseas construction market review and domestic/overseas pipe-line project analysis. Second, Test-bed was performed to confirm of practical applicability by 4 experts. And then 15 experts survey were performed to validate the usability and effectiveness of BPM for overseas NG pipe-line project. Consequently, if Korean contractors are using this BPM with their own know-how and experiences, it will be returned to more reasonable and rational references for decision making in overseas NG pipe-line project.

Fundamental Investigation of Knowledge Management System for a Plant

  • Seo-kyung Won;Ji-Yune Soh;Junbok Lee ;Choong-hee Han
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.375-380
    • /
    • 2009
  • Gas & Oil plant construction projects are increasing recently all over oil-producing countries. An EPC (Engineering, Procurement and Construction) company, which participates in the plant projects, should possess pertinent engineering licenses and EPC management skills to create high added-value. Nonetheless, there exist various risks involved in the EPC life cycle process due to such characteristics of construction projects as long duration of construction time and complicated processes along with the procured goods or services subjected to various logistics. The objective of this paper is to analyze the overall EPC life cycle for proper process and to examine various information and document. Additionally, the principal data for the analysis of the EPC process are derived from personal interviews with experts and specialty contractors of the plant projects. The results of this study would be widely used as a guide for efficient and effective management of overseas gas plant projects.

  • PDF

Analysis of Overseas LNG Bunkering Business Model (해외 LNG벙커링 비즈니스 모델 분석)

  • Kim, Ki-Dong;Park, So-Jin;Choi, Kyoung-Sik;Cho, Byung-Hak;Oh, Yong-Sam;Cho, Sang-Hoon;Cha, Keunng-Jong;Cho, Won-Jun;Seong, Hong-Gun
    • Journal of the Korean Institute of Gas
    • /
    • v.22 no.1
    • /
    • pp.37-44
    • /
    • 2018
  • As the international Maritime Organization is tightening up the emission regulation vessel, many countries and companies are pushing ahead the LNG fuel as one of long term solution for emission problems of ship. as a study on the way to conduct business for LNG bunkering around the world, this study was analyzed in view-point of business models focused on major countries such as Japan, China, Singapore, Europe and United States. The results of this study are as follows. China first established a nation-centered LNG bunkering policy. And then, the state and the energy company have been cooperating and carrying on LNG bunkering business for LNG fueled ships. Some countries in Europe and United States are in the process of LNG bunkering business mainly with private company. To obtain cheaper LNG fuel than bunker-C, the private company has a business model of LNG bunkering on their own LNG fueled ships, while securing LNG with high price competitiveness through partnership with middle class operators such us LNG terminal and natural gas liquefaction plant. Also, the LNG bunkering business around the world is focused on private companies rather than public corporations, but it was going to be focused on large energy companies because the initial cost required to build LNG bunkering infrastructure. Three models (TOTE model, Shell model, ENGIE model) of LNG bun kering business are currently being developed. It has been found that the way in which LNG bunkering business is implemented by different countries is applied differently according to the enterprise and national policy.

A Study on Comparative Analysis of Socio-economic Impact Assessment Methods on Climate Change and Necessity of Application for Water Management (기후변화 대응을 위한 발전소 온배수 활용 양식업 경제성 분석)

  • Lee, Sangsin;Kim, Shang Moon;Um, Gi Jeung
    • Journal of Korean Society of societal Security
    • /
    • v.4 no.2
    • /
    • pp.73-78
    • /
    • 2011
  • In order to resolve the problem of change in global climate which is worsening as days go by and to preemptively cope with strengthened restriction on carbon emission, the government enacted 'Framework Act on Low Carbon Green Growth' in 2010 and selected green technology and green industry as new national growth engines. For this reason, the necessity to use the un-utilized waste heat across the whole industrial system has become an issue, and studies on and applications of recycling in the agricultural and fishery fields such as cultivation of tropical crops and flatfishes by utilizing the waste heat and thermal effluent generated by large industrial complexes including power plants are being actively carried out. In this study, we looked into the domestic and overseas examples of having utilized waste heat abandoned in the form of power plant thermal effluent, and carried out economic efficiency evaluation of sturgeon aquaculture utilizing thermal effluent of Yeongwol LNG Combined Cycle Power Plant in Gangwon-do. In this analysis, we analyzed the economic efficiency of a model business plan divided into three steps, starting from a small scale in order to minimize the investment risk and financial burden, which is then gradually expanded. The business operation period was assumed to be 10 years (2012~2021), and the NVP (Net Present Value) and economic efficiency (B/C) for the operation period (10 years) were estimated for different loan size by dividing the size of external loan by stage into 80% and 40% based on the basic statistics secured through a site survey. Through the result of analysis, we can see that reducing the size of the external loan is an important factor in securing greater economic efficiency as, while the B/C is 1.79 in the case the external loan is 80% of the total investment, it is presumed to be improved to 1.81 when the loan is 40%. As the findings of this study showed that the economic efficiency of sturgeon aquaculture utilizing thermal effluent of power plant can be secured, it is presumed that regional development project items with high added value can be derived though this, and, in addition, this study will greatly contribute to reinforcement of the capability of local governments to cope with climate change.

  • PDF