Identification of Contractual Risk Factors for Application in the Overseas Construction Projects based on FIDIC Red Book 1999 Edition (해외건설공사관련 계약적 리스크 인자에 대한 연구 - FIDIC Red Book 1999년판 기준 -)

  • Hyun, Hak-Bong;Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.6
    • /
    • pp.1153-1160
    • /
    • 2016
  • There have been many studies on the subject of risks in the Construction Industry and many useful results have been produced. However, risk studies on the conditions of contract, which is the most critical contract documents, has not been tried despite of its contractual function in the overseas projects. In this study, various contractual risks are identified for proper and reasonable evaluation of the contractual risks possibly encountered in the Tender and/or Contract stages of the Projects. For development of study, FIDIC Red Book 1999 Edition which is world widely recognised as a standard conditions of contract prepared for the projects designed by the Employer. Contractual risks are divided into three levels and applicable clauses are assigned to each appropriate risk factors. And table of major contractual risk factors are made using the classified levels of each factors with evaluation criteria as a result of this study. As this study is made only for the conditions of contract which is prepared for the construction contracts designed by the Employer, further studies for other types of contracts such as Design-Build (FIDIC Yellow Book), EPC/Turnkey (FIDIC Silver Book) and recently developed Design, Build and Operate type of contract (FIDIC Gold Book) are required to cover various types of projects executed in the world construction markets.

Proposal for Developed Procurement and Material management System On Using Previous System Analysis in Plant Engineering (플랜트 구매조달 및 자재관리 시스템 개발 요구사항 분석을 통한 개발 방향 제시)

  • Lee, Seung-Hun;Kim, Sun-Kuk;Lee, Jun-Bok;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.204-209
    • /
    • 2006
  • Despite the recent depression of the construction industry, overseas plant market especially Middle East plant market is booming owing to the high oil price. Since many Middle Eastern countries are placing orders of big scale projects based on the high oil price, Korean EPC contractor are trying to get over the depression through theses plants. Presently, since the plant market is in prosperous condition in general, it is not hard to get overseas orders; however the original licenses that requirehigher technology and high added values are exclusive for advanced engineering companies which great difficulty is predicted for developing countries like us to join the crowd. Therefore, the objective of this study is to propose establishment of material management system on the filed to gain optimized effect of material management in connection with procurement system that all the procurement related personals execute tasks in advanced level by systemizing the task operation within the knowledge and task ability in time for plant construction procurement as a method to strengthening the competitiveness of Korean companies.

  • PDF

An Analysis of Policy and Technology Status of Smart City for Revitalization of Smart City Industry (스마트도시 산업 활성화를 위한 스마트도시 정책 및 기술현황 분석에 관한 연구)

  • Kim, Dae Ill;Park, Sung Chan;Yeom, Chun Ho
    • Journal of Information Technology Services
    • /
    • v.21 no.1
    • /
    • pp.127-144
    • /
    • 2022
  • Recently, Korea is promoting cooperation with various countries, centering on ASEAN countries, with the aim of exporting Korean smart cities for the globalization of smart cities. The purpose of this study is to select excellent smart city technologies through analysis of smart city technologies owned by domestic companies and company status, and to prepare a plan for revitalization of companies with smart city technologies. Through prior research, the implications were derived through research on the existing smart city. Next, established a smart city policy analysis and smart city technology classification criteria through Korea and Overseas smart city policy and Korea smart city technology status DB. And the big data of smart city technology possessed by Korea companies and a plan for selecting a smart city export technology was prepared through analysis by region and company. As a result, to activate the technology possessed by Korea companies and to export overseas, it seems to need financial support and tax incentives that secure a pathway to export specialized smart technologies of SMEs, along with citizen participation and institutional supplementation. The smart city technology fields with the highest utilization in Korea were traffic, green energy, e-government, crime prevention, and construction, and the service types were platform, IoT, AI, big data, and GIS/GPS. These technologies are expected to contribute to building a platform for overseas smart city technology exports.

Spotlighting Engineering Service Business in Korea (각광받는 한국의 기술용역업)

  • Cho Kyu Shim
    • Proceedings of the Korean Professional Engineer Association Conference
    • /
    • 1987.12a
    • /
    • pp.65-71
    • /
    • 1987
  • All Korean professional engineer′s great joy Is to welcome the Japanese professional engineers and relevant guests to the 1987 Japan-Korea Professional Engineers Joint Convention organized by the Korean Professional Engineers Association. As there exists an effort of blood, sweat and tear behind a succeeded theatrical stage, so an exquisite devotion with drawing up a master plan, investigation, supervision and etc by engineering firms is soaked through every part of huge construction projects and large unit factory buildings. It is over 14 years that the Engineering Service Promotion Law has been enacted by the Ministry of Science and Technology. In the meantime, the domestic engineering (engineering service) have reached a remarkable higher level while the number of engineering firms participating in overseas market has gradually been increasing. From a small scale of under water investigation to a large scale planning of atomic reactor or petrochemical plant, engineering service business can be said "The Software of Total Industry." Engineering service is what is called a higher business which offers specialized engineering know-how and experience. Engineering service compaines offer Its specialized knowledge and experience to government, industry and commerce. Whether the task is to modernize plant equipment, to design a building or to manage construction, an engineering company will develop and implement the most appropriate and cost effective solution. Clients use the engineering service of firm knowing that the engineer′s professional judgement is not influenced or biased by other commercial affiliations. While benefiting from the diverse experience that professional engineers can apply to a specific problem, government and industry also reduce the need for permanent in-house engineering staff. Engineering firms may be specialized or multi-disciplinary.

  • PDF

Analysis the Design Attribution to Assess the Design Quality Based on Detailed Design (실시설계도면 기반 설계속성 도출 및 설계품질평가)

  • Yang, Ji Su;Kim, Yea Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.3-12
    • /
    • 2016
  • Recently, construction industry shows active expansion in overseas construction market. But the active work limited in construction work, on the other hand, design-drawing work is evaluated shortage of competitive power. So this study aim to improve the competitive of 'domestic design-drawing work'thorough objective evaluation. Objective evaluation is consist of 'design attribution'. Design attribution is based on the execution drawing and complement by existing reasearch, expert interview. And then, list up the 'design attribution' evaluation list to carry out a survey targeting hands-on worker. Survey is consist of 'Likert 5-point scale, FMEA method'. As a result, construction company and design company show different opinions in both relative position evaluation and importance evaluation.

A Study of the Future Strategy and Mission for the Stakeholders in Industry, Academy, and Government for the Revitalization of CM (CM 활성화를 위한 산학관 분야의 향후 발전방향 및 미래과제)

  • Park, Hyung-Keun;Shin, Kyoo-Chul;Park, Hwan-Pyo;Jung, Young-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.244-256
    • /
    • 2008
  • The Construction Management contracting method and administration system had introduced to Korea 10 years ago. The actual CM consulting contract has adapted just for 5 years only. The CM administration system proves lots of innovative construction practices, upgrading construction industry from corporations to site operations. However, there are more tasks to the CM professionals to revitalize CM contracting methods and administration system. This research investigated what CM has achieved for the past 10 years and what CM should accomplish for the coming 10 years as future strategy and missions. Overseas CM practices are reviewed and domestic market, regulations, requirements are investigated through structured interviewed and in-depth survey to CM professionals. Many interesting issues were found through research process and those topics were categorized by industry, academy and government for defining current problems and future tasks. These issues for future strategy and mission needs to be utilized to develop future CM contracting methods and administration system. The system to follow up these meaningful results of CM is important for the future progress.

Some Practical Issues on the International Construction Contract (국제건설계약(國際建設契約) 실무상(實務上) 유의점(有意點))

  • Kim, Seung-Hyeon
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.25
    • /
    • pp.3-40
    • /
    • 2005
  • Many Korean construction companies have been performing a variety of overseas construction projects since the 1970s. It is unfortunate that in many cases they have had to suffer big losses caused by errors and defects in the design and construction of the projects. In the author's opinion, however, there were losses that could have been avoided if they had understood better the feature and content of the particular construction contract. Few lawyers and scholars in Korea have been interested in the research and study of international construction contracts. This is mainly because they do not have access to practical sources outside of Korea for them to research and study since the contracts undertaken have been dealt with by law firms in other jurisdictions to which the disputes apply. This article is aiming primarily at the introduction of the issues which the practitioners are likely to confront in the process of reviewing and performing the international construction contract. In some cases solutions are sought about these issues based upon the FIDIC standard terms and conditions, the actual experience of practice, and UNIDROIT Principles, etc. It is reasonable to say that all the issues related to the international construction contract cannot be covered in a short article like this. The author wishes this article could induce subsequent studies on international construction contracts for further research. It has to be noted that from time to time Korean construction practices have been compared to the international ones for better understanding. This article mostly includes cases where the Korean construction companies go overseas for their projects, while there are some cases where foreign developers and financial investors participated in domestic projects in which international construction contracts forms were adopted. A few precedent domestic writings about international construction contracts seems to lack emphasis on the points that there are several standard construction contract forms and that they are different. The differences are mainly in accordance with who bears the design responsibility, how the owner has to make progress payments to the contractor and who the funding source for the project is. This article tries to make it clear that there are significant differences between the standard contract forms, e.g. a simple construction form, a design-build form and an EPC/turnkey form of contract. Again, the author hopes that this article can arouse the interest in the international construction contracts from both academic and practical fields, so that many subsequent advanced articles can help our construction industry become much more competitive in the world through awareness of the methods of procurement and administration of the contracts.

  • PDF

A Study on Plans for Diffusion & Revitalization, and Developing Key Performance Indicator for OSC based PC Structure Apartment Housing (OSC기반 PC구조 공동주택의 보급 및 활성화 방안과 핵심 성과 지표 개발 - 주체별 설문조사 분석결과를 중심으로 -)

  • Lee, Sungho;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.98-105
    • /
    • 2021
  • Recently, there have been many changes in the domestic construction industry. OSC (Off-Site Construction) is expected to solve these problems, and it is emerging as a way to inspire innovation in the domestic construction production system. OSC, which has only recently attracted attention again after previous studies have failed, is lacking in research on preception surveys and customized performance measurements compared to overseas. This study investigated the perceptions of construction industry workers on OSC through a survey, and examined differences in perceptions of each subject and the relative importance of performance indicators. In general, the need for introduction and development of OSC was recognized. Also, drivers and obstacles inhibiting more use of OSC were analyzed. The relative importance for performance indicators and differences in perceptions of each subject were identified. Then, this study suggests plans for diffusion and revitalization of OSC, and key performance indicator for OSC based PC structure apartment housing.

Calculation of shielding range using shield wires in Myanmar 500kV Substation (차폐선을 이용한 미얀마 500kV 변전소 차폐보호범위 계산)

  • Park, H.S.;Kim, T.Y.;Cho, Y.S.;Park, C.S.;Joo, S.H.
    • Proceedings of the KIEE Conference
    • /
    • 2005.11b
    • /
    • pp.189-191
    • /
    • 2005
  • In the past, dramatic economical development of Korea could be achieved by well-organized 154kV power system network. Electric power Is a key Industry for the nation and industrial development. Nowadays we operates 345kV Power system with based transmission network and also we are operating 765kV power system to supply to the capital region. Currently developing countries in Southeast Asia are requiring the electric power technology to Korea so that they can acquire the source of the development-power system network. Therefore, it Is important to design transmission line and substation with appropriate methods. In this paper, a calculation and calculating process of shielding range using shield wires in Myanmar 500kV substation are reviewed according to the Myanmar 500kV power system project performed by the overseas projects section of the Korea Electric Power Corporation.

  • PDF

Establishment of Critical Work Models through the Evaluation of Technology Competitiveness (산업설비 기술수준 평가를 통한 주요업무 도출 및 모델 구축방안 연구)

  • Park Su-Hyun;Ha Seung-Ho;Kim Kyong-Min;Park Chan-Hyuk;Kim Kyong Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.526-530
    • /
    • 2004
  • The portion of plant industry has increased within construction market. In spite of plant industry is dynamic field which leads state-of-the-art and creates a value, phased information management and knowledge intensive business accomplishment are insufficient. Henceforth plant is expected to demand increment of industrial project from hereafter international plant industry market. The continuous plan technique and know-how accumulation are urgent from domestic. 1'his research analyzes the areas in which domestic plant industry is insufficient and then elicits project management key success factors from current operation process. In addition, this research compares domestic plant level with overseas plant level. This study establishes work models for critical work phases based on the analysis of domestic plant technical level.

  • PDF