• 제목/요약/키워드: Order Management

검색결과 18,189건 처리시간 0.036초

SELECTING OPTIMUM MANAGEMENT PRACTICES IN PRE-CONSTRUCTION PHASE CONSIDERING PROJECT CHARACTERISTICS

  • Hee-Sung Cha;Ki-Hyun Kim;Young-Jin Ko
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.609-613
    • /
    • 2011
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the difficulties of managing construction project in the construction industry. This research classifies and applies the potential improvement made by the construction practitioners. In order to apply influential factors for success on the construction project, the research identifies the relationship between the factors and performance management practices. In addition, in order to predict the results reflecting the project characteristics which are un-improvable by the construction managers in the initial stage of construction, the effect of project characteristics to the identified management practices have been drawn by performance area. Finally, in order to improve the predicted performance, this research provides a framework in setting valid best practices according to the performance areas through a statistical analysis between the best practices and project characteristics through the industry survey.

  • PDF

병원 선택 속성간의 계층적 구조 분석 (An Hierarchical Structure Analysis of Hospital Selection Attributes)

  • 차재빈;이훈영
    • 보건행정학회지
    • /
    • 제21권2호
    • /
    • pp.263-278
    • /
    • 2011
  • As the competition among hospitals become intensified, hospital management is required to carry out more effective marketing and positioning of the hospital. Successful positioning of a hospital requires the knowledge about how the concrete attributes inherent in the medical service associated with the customer values that customers seek eventually in the medical service. Thus, it is required for hospital management to understand which hospital attributes should be emphasized in order to improve the customer values. The hierarchical structure of service attributes can provide valuable information about effective positioning and advertising. To obtain such knowledge, we employed the order analysis technique as an objective means-end chain method. Order analysis is useful for identifying the causal structure among attributes. Thus, we can examine the underlying causal relationship and eventually the vertical structure of hospital selection attributes. For this study, we conducted a survey to obtain 370 responses for the analysis. The result suggests that hospital management had better increase the scale of hospital, improve the services of health care providers, and modernize the hospital facilities and equipments so as to enhance customer values and eventually to lead them to recommend the hospital to others. Our findings would provide the valuable information for hospital management to develop the more effective hospital positioning and marketing strategies.

Development and Verification of Operation Management Tool for KASS

  • Minhyuk Son;ByungSeok Lee
    • Journal of Positioning, Navigation, and Timing
    • /
    • 제12권4호
    • /
    • pp.431-436
    • /
    • 2023
  • In order to provide continuous Korea Augmentation Satellite System (KASS) services, the operation organization should continuously and systematically perform operations, maintenance, and technical activities. All subsystems of KASS, all Line Replacement Units (LRUs), and Software Replacement Units (SWRUs) should be operated and maintained continuously. In order to effectively manage these activities, it is necessary to develop an Operation Management Tool (OMT). For this purpose, operation management, operation organization, and operation activities were defined. The defined requirements were divided into general, function, interface, and database for OMT development, and functions and decision-making procedures consisting of site/asset/trouble/work order/schedule management were designed. The OMT developed by reflecting the site and asset information as well as the design content met predefined requirements. The OMT will be actively used in actual KASS operation and will evolve by continuously reflecting the additional requirements of operators. Through this tool, KASS will support continuous service provision.

프리캐스트 콘크리트 제작공장에 대한 원자재 재고관리 정책 비교 (Comparison of Raw Material Inventory Management Policies for a Precast Concrete Production Plant)

  • 권현주;전상원;이재일;정근채
    • 한국건설관리학회논문집
    • /
    • 제25권5호
    • /
    • pp.41-54
    • /
    • 2024
  • 본 연구에서는 프리캐스트 콘크리트(Precast Concrete; PC) 제작공장의 원자재 재고관리를 위한 세 가지 재고관리 정책, 정량 발주 방식, 정기 발주 방식, (s, S) 발주 방식의 성능을 비교·분석한다. 보다 현실적인 결론의 도출을 위해, 복수 원자재를 사용하는 PC 제작공장의 전체 공정을 대상으로 원자재 수요 및 공급 측면의 변동성을 고려하여 개발된 성능평가 도구인 ARENA 시뮬레이션 모델을 활용하였다, 성능 비교를 위해, 먼저 세 가지 재고관리 정책에 대해 경제적주문량(Economic Order Quantity; EOQ)을 초깃값으로 하여 OptQuest를 통해 재주문점, 주문량, 목표수준 및 주문주기 모수를 최적화하였다. 최적화 결과, 수요 및 공급 측면의 변동성을 고려하지 않는 EOQ 방식에 비해 재고관리 비용을 평균 97.28% 감소시킬 수 있었다. 이후, 프로젝트 발생 주기, 원자재 조달기간, 단위 품절비용 등 세 가지 영향 요인을 설정한 후 세 가지 재고관리 정책에 대한 성능 비교 실험을 수행하였다. 실험 결과, 실시간 또는 매일 재고수준을 파악하여 주문 시점을 결정하는 정량 발주 방식과 (s, S) 발주 방식의 재고관리 비용이 고정 주문주기를 갖는 정기 발주 방식보다 각각 30.6%와 27.9% 낮게 나타났다. 또한, 재고관리 비용은 프로젝트 발생 주기를 제외한 원자재 조달기간과 단위 품절 비용 요인에 의해 영향을 받는 것으로 나타났지만, 그 차이는 2.17%와 2.09%로 수요 및 공급의 변동성 대응을 위한 모수 최적화 과정으로 인해 크지 않았다.

수주생산에서의 설계정보 관리를 위한 부품분류와 코딩 (A Classification and Coding System for the Design Information Management in Make-to-Order Manufacturing)

  • 이규용;김재균;문치웅
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 1998년도 추계학술대회 논문집
    • /
    • pp.166-170
    • /
    • 1998
  • Classification and Coding(C&C) systems as a core of design information management have been accomplished by many studies in terms of design and manufacturing attribute based on Group Technology. Those are very difficult to apply in make-to-order(MTO) manufacturing because the environment of MTO has various characteristics of product, many licensors, engineering change, insufficiency of integrated management system for codes and so on. This paper presents a suitable C&C system to MTO manufacturing which consider management level and drawing.

  • PDF

Establishment of Disaster Response and Safety Management Systems in LH

  • Kim, Sang-Yeon
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.56-57
    • /
    • 2015
  • This study is to review and re-establish LH disaster response and safety management system of the construction site and rental apartment complex in order to make an effective response and minimize damage in the face of disaster. I suggest directions for the improvement of disaster management systems. To achieve this, I reviewed the existing disaster response organization and accept opinions of the operating department in order to constitute effective organization which respond quickly and efficiently in emergency, and assigned new roles and responsibilities at each organization. Furthermore, I setup and suggested response manuals for each possible disasters.

  • PDF

Development of the Order Picking Algorithm for Warehouse Management System in SCM Environment

  • 조종남;남호기;박상민;오성환
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2003년도 추계학술대회
    • /
    • pp.129-142
    • /
    • 2003
  • The SCM is that Supply Chain Network is Promptly and Voluntarily Optimized in Unstable Market Change Environment. The Cash flow Efficiency of Hole Supply Chain Network is Improved by Changing the Information and Changing the Foundation of Business Processes. The Role of WMS has been Changing Importantly with the Introduction of SCM. WMS Needed to Change to the Information Center in Order to Change Information in Real Time and the WMS of Information Storing in Order to Support an Idea Decision. This Development was Defined about the Importance of WMS in SCM Environment. The Criterion of Valuation is Normally Measured Time between Taking a Order Receive and Bringing the Items to Customer. The Decreasing Move Time of Order Picker in Warehouse is Directly Influence to the Job Execution. So, this Research is Defined about the Optimized Route of Order Picker and Suggests Algorithm. To do this, Past Algorithm is Studied. It's Easy to Introduce and this Study is Looking for Method about the Noticing of Order Picker. The Algorithm will Improve to be Adapt to Standard Process System.

  • PDF

전자증거 관리시스템의 설계 (DESIGNIN AND OPERATION OF DIGITAL EVIDENCE MANAGEMENT SYSTEM APPLYING COMPUTER FORENSICS AND ELECTRONIC CERTIFICATION)

  • 김종섭;하옥현;김귀남
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2001년도 춘계학술대회
    • /
    • pp.275-280
    • /
    • 2001
  • DESIGNIN AND OPERATION OF DIGITAL EVIDENCE MANAGEMENT SYSTEM APPLYING COMPUTER FORENSICS AND ELECTRONIC CERTIFICATION Digital evidence will be used as a term, which means the electronic form of information which is necessary to confirm or prove the factum of all kinds of behaviors committed through the devices which have data processing ability including computer. It is expected that there will be the increase of legal conflicts surrounding electronic commerce activities as well as the increase of cyber crimes, as the number of Internet users are getting bigger. In order to solve the problems of conflicts derived from electronic commerce, the factum of electronic commerce activities must be confirmed. In order to confirm the factum of electronic commerce activities, the evidence is prerequisite. Almost all evidences relating to the electronic commerce activities exist in digital form. For the reason that the digital evidence can be easily damaged and changed, special management is required to collect, analyze, and preserve the digital evidence. In order to meet this requirement, this study proposes a basic model of digital evidence management system applying computer forensics and electronic authentication.

  • PDF

Examining Change Order Reasons for Non-Structural Utility Support Projects in Healthcare Facilities

  • Genota, Naomi P.;Kim, Joseph J.
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.188-195
    • /
    • 2022
  • Although issuing change orders is a common practice in the construction phase of any project, non-structural utility subcontractors are struggling and seek to find a way to reduce change orders. Therefore, this paper presents the analysis results on change orders to cultivate possible suggestions and solutions on how to reduce or minimize change orders in mechanical, electrical, and plumbing (MEP) works. Change orders in non-structural utility works are analyzed based on six categories such as rerouting and change of location, changes in weight, rejected design by Office of Statewide Health Planning and Development, District Structural Engineer, or the Structural Engineer of Record, unforeseen conditions, changed equipment, and owner-initiated change. The analysis findings showed that rerouting and changing location is the most significant cause, followed by unforeseen conditions. The results not only contribute to the existing body of knowledge on change order research area, but also help MEP contractors reduce the time and cost of change orders.

  • PDF

Establishment of Change Order Database for Reducing Change Order in Construction Phase

  • Shin, Hyun-Kyung;Cha, Yongwon;Han, Sangwon;Hyun, Chang-Taek
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.622-624
    • /
    • 2015
  • As uncertain factors are latent in a construction project by nature, a change order occurs frequently. The occurrence of change orders in construction projects conducted during construction phase is known to cause unexpected negative impacts such as cost overrun, schedule delay, quality problem, and claims in the post-process. Thus, an efficient management method is necessary to prevent and minimize change orders during construction phase when they occur frequently. This paper analyzed the causes of change orders and the impact factors that occur during the construction phase of a construction project and suggested a direction for change order database building.

  • PDF