This paper describes a new stochastic heuristic algorithm in engineering problem optimization especially in power system applications. An improved particle swarm optimization (PSO) called adaptive particle swarm optimization (APSO), mixed with simulated annealing (SA), is introduced and referred to as APSO-SA. This algorithm uses a novel PSO algorithm (APSO) to increase the convergence rate and incorporate the ability of SA to avoid being trapped in a local optimum. The APSO-SA algorithm efficiency is verified using some benchmark functions. This paper presents the application of APSO-SA to find the optimal location, type and size of flexible AC transmission system devices. Two types of FACTS devices, the thyristor controlled series capacitor (TCSC) and the static VAR compensator (SVC), are considered. The main objectives of the presented method are increasing the voltage stability index and over load factor, decreasing the cost of investment and total real power losses in the power system. In this regard, two cases are considered: single-type devices (same type of FACTS devices) and multi-type devices (combination of TCSC, SVC). Using the proposed method, the locations, type and sizes of FACTS devices are obtained to reach the optimal objective function. The APSO-SA is used to solve the above non.linear programming optimization problem for better accuracy and fast convergence and its results are compared with results of conventional PSO. The presented method expands the search space, improves performance and accelerates to the speed convergence, in comparison with the conventional PSO algorithm. The optimization results are compared with the standard PSO method. This comparison confirms the efficiency and validity of the proposed method. The proposed approach is examined and tested on IEEE 14 bus systems by MATLAB software. Numerical results demonstrate that the APSO-SA is fast and has a much lower computational cost.
본 논문은 투자수익성을 극대화 할 수 있는 건화물선 운항기업의 해운투자 의사결정 모델을 제시하는 것이 핵심 내용이다. 얼마전 우리나라 4위 해운기업인 대한 해운(주)가 법정 관리를 신청해 큰 충격을 주었는데, 그 이유를 살펴보면 전적으로 투자 의사결정이 잘못된 데 기인한다. 즉 대한해운(주)는 해운 경기가 피크에 이른 2007, 8년도에 집중적으로 산물선을 장기용선 방식의 투자확충 의사결정을 내렸으나, 2009, 10년도에 부정기선 운임지수가 거의 1/10 수준으로 폭락하여 막대한 손실을 보아 결국 자금압박으로 회사가 부도 상태에 이르게 되었다. 이러한 문제는 지난 1980년대 초에도 발생된 바 있으나 여전히 반복되고 있다는 사실이 안타깝다. 따라서 본 논문은 해운 경기가 호황에 있을 때 오히려 일정 선박을 매각하고 필요한 선복량은 단기 용선하여 향후의 경기변동 상황에 대처하도록 하는 의사결정을 말한다. 즉, 해운 경기가 불황국면에 있을 때는 조선경기도 하락 하는 만큼 저가로 선박을 매수 또는 발주하고 서서히 해운 경기가 회복되고 본격적인 상승기에 역시 선가도 급격히 상승하는 시점에 일정 비율의 보유선박을 매각 처분하여 선박 매매차익을 실현하고 다시 경기가 하강한 시점에서 선박을 재매입하는 순환적인 투자 의사결정 모델이 건화물선 해운기업의 수익성 제고에 크게 기여할 수 있다고 본다. 이때 고객서비스 유지를 위해 필요한 선복량은 단기 용선으로 대체하여 가급적 선박 보유 비중을 낮추는 의사결정이 매우 중요한데, 이러한 전략적 투자의사결정 모델은 자본집약적 산업인 해운기업의 재무위험과 영업위험을 모두 낮출 수 있게 된다는 것이 논문의 핵심이다.
As it is known, uranium enrichment is carried out on industrial scale by means of multistage separation facilities, i.e., separation cascades in which gas centrifuges (GCs) are connected in series and parallel. Design and construction of these facilities require significant investment. So, the problem of calculation and optimization of cascade working parameters is still relevant today. At the same time, in many cases, the minimum unit cost of a product is related to the cascade having the smallest possible number of separation elements/GCs. Also, in theoretical studies, it is often acceptable to apply as an efficiency criterion the minimum total flow to supply cascade stages instead of the abovementioned minimum unit cost or the number of separation elements. In this article, cascades with working parameter of a single GC changing from stage to stage are optimized by two of the abovementioned performance criteria and are compared. The results obtained allow us to make a conclusion about their differences.
This paper presents the methodology for optimal design of power grid for offshore wind power plant (OWPP) and optimum location of offshore substation. The proposed optimization process is based on a genetic algorithm, where the objective cost model is composed of investment, power loss, repair, and reliability cost using the net present value during the whole OWPP life cycle. A probability wind power output is modeled to reflect the characteristics of a wind power plant that produces electricity through wind and to calculate the reliability cost called expected energy not supplied. The main objective is to find the minimum cost for grid connection topology by submarine cables which cannot cross each other. Cable crossing was set as a constraint in the optimization algorithm of grid topology of the wind power plant. On the basis of this method, a case study is conducted to validate the model by simulating a 100-MW OWF.
대한용접접합학회 2002년도 Proceedings of the International Welding/Joining Conference-Korea
/
pp.181-186
/
2002
Laser welding application for car body manufacturing has many advantages in the stiffness and the lightness of vehicle, the productivity of assembly line, and the degree of freedom in design. This presentation will express the innovation of car body manufacturing including parameter optimization, process modeling, and system integration. In this application the investment for systems was cut down dramatically by real time switching over the laser path between two welding stations. Points of technical discussion are as follows: optimization of parameters such as laser power, robot speed and trajectory, compact and useful design of jig & fixture to assure welding quality for 3 sheet-layer zinc-coated steel, system integration between 4kW Nd:YAG laser device and the other systems, on-line real time welding quality monitoring system, perfect safety standards for high power laser, minimization of consumption costs such as arc lamp, protective glass for optic, etc. Laser welding has found a place on Hyundai's production plant in conjunction with the startup of mass production of new sports car, and this production system is the result of a collaboration of its engineers. Outer side sheets are joined to inner side sheets by 122 stitch welds totally. And the length is about 2.4meter.
The BESS(Battery Energy Storage System) is an useful device for load leveling, but the high cost, installation space and safety issues are the main barriers for supplying it widely. The important factor in supplying BESS to customers successfully is the payback period. As most of the H/W cost factors are uncontrollable, the optimization of storage volume can be useful factor in improving payback period. In order to obtain optimized BESS volume, the load factor, demand ratio, peak shaving ratio, electric rates and benefits from DR participation of customer should be analyzed. In this paper, we could verify the peak cutting capability and cost effectiveness under the some proposed conditions and changing value of PCS and battery based on the customers data after volume optimization process was applied, and we can identified the saturation point of load factor and shortening of customer's payback period.
The 2th International Conference on Construction Engineering and Project Management
/
pp.509-519
/
2007
Private financing is playing an increasing role in public infrastructure construction projects worldwide. However, private investors/operators are exposed to the financial risk of low profitability due to the inaccurate estimation of facility demand, operation income, maintenance costs, etc. From the operator's perspective, a sound and thorough financial feasibility study is required to establish the appropriate capital structure of a project. Operators tend to reduce the equity amount to minimize the level of risk exposure, while creditors persist to raise it, in an attempt to secure a sufficient level of financial involvement from the operators. Therefore, it is important for creditors and operators to reach an agreement for a balanced capital structure that synthetically considers both profitability and repayment capacity. This paper presents an optimal capital structure model for successful private infrastructure investment. This model finds the optimized point where the profitability is balanced with the repayment capacity, with the use of the concept of utility function and multi-objective GA (Generic Algorithm)-based optimization. A case study is presented to show the validity of the model and its verification. The research conclusions provide a proper capital structure for privately-financed infrastructure projects through a proposed multi-objective model.
본 논문은 단일 종목에 투자금을 전액 투자하는 것에 비해 다수의 종목에 분산투자하는 것이 투자 위험을 보다 감소시킬 수 있다는 포트폴리오 최적화 문제를 다룬다. 널리 알려진 Markowitz의 수익률에 대한 평균-분산 기법(MV)은 위험요인인 분산(또는 표준편차)을 감소시키기 위해 지배원리를 적용하여 효율적 투자선에 있는 종목들을 대상으로 분산투자하는 포트폴리오를 구성하였다. 반면에, 본 논문에서는 최소표준편차를 가진 종목을 필수 투자종목으로 선정하고, 필수 투자종목과 비양(음의, 무)의 상관관계를 갖는 종목들을 대상으로 포트폴리오를 형성하였다. 제안된 방법을 실험한 결과 MV에 비해 보다 적은 위험(표준편차)을 보였다.
In response to the economic depression, the demand for fixed rent income has increased according to the easing construction regulations. it caused indiscriminated investment to stakeholders. This leads to oversupply in the multi-family Housing market and increases unsold housing and vacancy rates except specific area such as Gangnam-gu.In order to solve this issue, although studies on the optimization price of apartment houses has been conducted, the study is insufficient regarding on residential officetel. Therefore, the objective is to suggest a basic study on optimal price estimation model development by using probabilistic forecasting method in planning phase. To achieve the objective, first, variables are defined such as expenses, financial costs, income, etc. Second, causal loop diagram is suggested. Third, basic optimization prices estimation model is developed. In the future, this study can be used as one of decision making tools in planning phase of officetel development projects.
Purpose - Due to highly elevated levels of competition, many companies today have to face the problem of decreasing profits even when their actual sales volume is increasing. This is a common phenomenon that is seen occurring among companies that focus heavily on quantitative growth rather than qualitative growth. These two aspects of growth should be well balanced for a company to create a sustainable business model. For supply chain management (SCM) planners, the optimized, quantified flow of resources used to be of major interest for decades. However, this trend is rapidly changing so that managers can put the appropriate balance between sales volume and sales quality, which can be evaluated from the profit margin. Profit optimization is a methodology for companies to use to achieve solutions focused more on profitability than sales volume. In this study, we attempt to provide executional insight for companies considering implementation of the profit optimization system to enhance their business profitability. Research design, data, and methodology - In this study, we present a comprehensive explanation of the subject of profit optimization, including the fundamental concepts, the most common profit optimization logic algorithm -linear programming -the business functional scope of the profit optimization system, major key success factors for implementing the profit optimization system at a business organization, and weekly level detailed business processes to actively manage effective system performance in achieving the goals of the system. Additionally, for the purpose of providing more realistic and practical information, we carefully investigate a profit optimization system implementation case study project fulfilled for company S. The project duration was about eight months, with four full-time system development consultants deployed for the period. To guarantee the project's success, the organization adopted a proven system implementation methodology, supply chain management (SCM) six-sigma. SCM six-sigma was originally developed by a group of talented consultants within Samsung SDS through focused efforts and investment in synthesizing SCM and six-sigma to improve and innovate their SCM operations across the entire Samsung Organization. Results - Profit optimization can enable a company to create sales and production plans focused on more profitable products and customers, resulting in sustainable growth. In this study, we explain the concept of profit optimization and prerequisites for successful implementation of the system. Furthermore, the efficient way of system security administration, one of the hottest topics today, is also addressed. Conclusion - This case study can benefit numerous companies that are eagerly searching for ways to break-through current profitability levels. We cannot guarantee that the decision to deploy the profit optimization system will bring success, but we can guarantee that with the help of our study, companies trying to implement profit optimization systems can minimize various possible risks across various system implementation phases. The actual system implementation case of the profit optimization project at company S introduced here can provide valuable lessons for both business organizations and research communities.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.